Loading...
HomeMy WebLinkAboutPeterson Contractors - FY18 Waterloo Boathouse Enhancements, Cont No. 940 - 12/9/2019CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 6 PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940 Date Prepared: November 08, 2019 AMOUNT: $ 22,582.78 Increase TO: Peterson Contractors, Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 4, 2017. A. Description of change to be made or extra work to be done: 1. Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: 1. As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: 1. Compensation already made to contractor through original bid items. See attached summary. CITY OF WATERLOO BY: f s=::C_LC 'L Quentin Hart, Mayor ATTEST: BY: P^ Kelley, Fel Ie, City Clerk Date WATERLOO LEISURE SERVICES Date By: I Z 3-11 Travis Nichols, Program Mgr Date (File: My Documents/Change Order/MASTER) By: Total Net Increase $ 22,582.78 , INC. (CONTRACTOR) PRINTED NAME: „Cc r i I Person TITLE: rr QSIm WAYNE CLAASSEN ENGINEERING & SURVEYING, INC. iliiam ,X/Claassen, PE Date v /(f2Zf (fi F.Y. 2018 Waterloo Boathouse Enhancements Waterloo Iowa FINAL QTY ADJUSTMENT 11-08-2019 Page 1 of 4 Item Contract 1 Authorized ( I I Final 1 Quantity 1 Increase/ No. DESCRIPTION Quantity 1 Quantity 1 Unit I Unit Price 1 Quantity 1 Difference 1 Decrease 1 MOBILIZATION 1 1 1.00 1 LS 1 $17,500.00 1 1.00 1 0.00 1 $0.00 ------------- --- --- --- --- ------------------ --- ________ ________ 2 TOPSOIL STRIP, SALVAGE, I 587 1 587.00 1 CY 1 $10,00 1 587.00 1 0.00 1 $0.00 STOCKPILE AND RESPREAD 3 CLASS 10 EXCAVATION 2,797 1 2797.00 1 CY 1 $15.00 I 2,797.00 1 0.00 1 $0.00 4 TOPSOIL, FURNISH, SPREAD, IN I 100 1 100.00 1 CY 1 $27.50 1 496.00 1 396.00 1 $10,890.00 PLACE --------- ------------- ---------- -- ------------------------------- --- ---------_______ 5 REVETMENT, CLASS "E" RIP -RAP 1 950 1 950.00 1 TONS 1 $40.00 1 1,046.11 I 96.11 1 $3,844.40 6 GEOSYNTHETIC 7,731 1 7731.00 1 SY 1 $3.50 1 8,121.00 I 390.00 1 $1,365.00 7 SEED, FERTILIZE AND MULCH (IDOT 1 0.92 1 0.92 1 ACRES 1 $4,500.00 1 2.49 1 1.57 1 $7,065.00 RURAL MIX) 8 SILT FENCE (EROSION CONTROL FENCING) 9 STRAW FILLED WATTLE, 9" DIA. 530 1 530.00 1 LF 1 $2.50 1 344.00 1-186.00 1-$465.00 90 1 90.00 1 LF 1 $4.00 1 220.00 1 130.00 1 $520.00 10 WOOD EXCELSIOR MAT FOR SLOPE 1 160 1 160.00 1 SQ 1 $22.50 1 0.00 I -160.00 1-$3,600.00 PROTECTION (EC-103) 11 TRAFFIC CONTROL 12 SWPPP COMPLIANCE 13 MAINTENANCE BOND, 2-YEAR 101 REMOVALS, STORM SEWER CULVERTS 1 1 1.00 1 LS 1 $1,000.00 1 1.00 1 0.00 1 $0.00 1 1 1.00 1 LS 1 $5,000.00 1 1.00 1 0.00 1 $0.00 1,0 1 1.00 1 LS 1 $4,250.00 1 1.00 1 0.00 1 $0.00 280 1 280.00 1 LF 1 $18.00 1 0.00 1-280.00 145,040.00 102 REMOVALS, ELECTRIC POLES 1 6 1 6.00 1 EACH 1 $400.00 1 6.00 1 0.00 103 REMOVAL, TREES 1 4 1 4.00 1 EACH 1 $500.00 1 4.00 1 0.00 104 REMOVALS, TREE STUMPS 105 REMOVALS, DOCK NO. 1 (TIMBER WALL AND DOCK NEAR BOAT HOUSE, COMPLETE) INCREASE/DECREASE THIS PAGE ONLY -- --- -- ------ --- ------ ---------------- 1 1 1.00 1 EACH 1 $300.00 1 1.00 1 0.00 --- - --- ------------- ------------- ---------------- 1 1 1.00 1 LS 1 $6,500.00 1 1.00 1 0.00 $0.00 $0.00 $0.00 $0.00 $14,579.40 F.Y. 2018 Waterloo Boathouse Waterloo Iowa FINAL QTY ADJUSTMENT 11-08-2019 Item No. DESCRIPTION Page 2 of 4 Contract 1 Authorized I I 1 Final 1 Quantity 1 Increase/ Quantity 1 Quantity 1 Unit 1 Unit Price 1 Quantity 1 Difference 1 Decrease 106 REMOVALS, DOCK NO. 2 (STEEL, 1 1 1 1,00 1 LS 1 $5,500.00 1 1.00 1 0.00 1 0.00 WOOD AND CONCRETE STRUCTURE NEAR BOAT RAMP, 107 REMOVALS, DOCK NO. 3 (WOOD STRUCTURE ADJOINING BOAT RAMP, COMPLETE) 1 1 1.00 1 LS 1 $6,500.00 1 1.00 1 0.00 1 0.00 108 REMOVALS, P.C. CONCRETE SLOPE I 458 1 458.00 1 SY 1 $5.00 1 458.00 1 0.00 1 0.00 PROTECTION 109 REMOVALS, GUARDRAIL AND POSTS 110 REMOVALS, MISC. 201 SUBDRAIN, 6" DIA. IN POROUS BACKFILL, COMPLETE 202 30" DIA. INFILTRATION AUGER HOLE, 10'DRILL DEPTH 203 1 1/2" CLEAN STONE 130 1 130.00 1 LF 1 $8.00 1 130.00 1 0.00 1 0.00 1 1 1.00 1 LS 1 $7,500.00 1 1.00 1 0.00 1 0.00 204 1 204.00 1 LF 1 $15.00 1 612.00 1 408.00 1 6,120.00 18.00 1 18.00 1 EACH 1 $375.00 1 29.00 1 11.00 1 4,125.00 60 1 60.00 1 TONS 1 $35.00 1 83.96 1 23.96 1 838.60 301 SUBBASE, MODIFIED, 12" 1 7,731 1 7731.00 i SY 1 $11.75 1 8,112.78 1 381.78 1 4,485.89 COMPACTED THICKNESS (UNDER HMA PAVING) 302 PAEMENT, HMA, 3,000,000 ESAL, BASE COURSE, 3/4" MIX, 3" THICK 7,161 1 7161.00 1 SY 1 $13.75 1 7,542.78 i 381.78 1 5,249.44 303 PAVEMENT, HMA, 3,000,000 ESAL, 1 7,161 1 7161.00 1 SY ( $7.25 1 7,542.78 1 381.78 1 2,767.89 INTERMEDIATE COURSE, 1/2" MIX, 1.5" THICK 304 PAVEMENT, HMA, 3,000,000 ESAL, 1 7,161 1 7161.00 1 SY 1 $8.50 1 7,542.78 1 381.78 1 3,245.11 SURFACE COURSE, 1/2" MIX, 1.5" THICK 305 CURB, GUTTER, P.C. CONCRETE, 7" THICK, 24" WIDE, IDOT CLASS C-4 306 SUBBASE, MODIFIED, 4" COMPACTED THICKNESS (UNDER RECREATIONAL TRAIL) 606.0 1 606.00 1 LF 1 $17.00 1 606.00 1 0.00 1 0.00 1,007 1 1007.00 1 SY 1 $6.00 1 1,007.00 1 0.00 1 0.00 307 RECREATIONAL TRAIL, PAVEMENT, 1 915 1 915.00 1 SY 1 $32.00 1 915.00 1 0,00 1 0.00 PC CONCRETE, 5-INCH THICK, IDOT CLASS C-4 308 SUBBASE, MODIFIED, 4" 1 350 1 350.00 1 SY 1 $6.00 1 350.00 1 0.00 1 0.00 COMPACTED THICKNESS (UNDER SIDEWALK) INCREASE/DECREASE THIS PAGE ONLY $26,831.93 F.Y. 2018 Waterloo Boathouse Enhancements Contract 940 FINAL QTY ADJUSTMENT 11-08-2019 Page 3 of 4 Item j Contract j Authorized j j 1 Final 1 Quantity j Increase/ No. DESCRIPTION 1 Quantity j Quantity 1 Unit j Unit Price 1 Quantity 1 Difference j Decrease 309 SIDEWALK, PAVEMENT, PC CONCRETE, 5-INCH THICK, 1 290 j 290.00 1 SY j $30.00 1 290.00 j 0.00 j $0.00 IDOT CLASS C-4 LANDING, COMPLETE AS PER PLAN 401 BOLLARDS, COMPLETE 1 1 1.00 j LS j $11,500.00 j 1.00 j 0.00 1 $0.00 8 j 8.00 1 EACH j $750.00 1 8.00 j 0.00 j $0.00 402 ELECTRICAL AND LIGHTING, j 1 1 1,00 1 LS 1 $16,000.00 j 1.00 j 0.00 1 $0.00 COMPLETE 403 SIGNAGE, COMPLETE 1 1 1.00 1 LS 1 $750.00 1 1.00 j 0.00 1 $0.00 PAVEMENT MARKINGS, 404 COMPLETE 405 STEEL BEAM GUARDRAIL END TERMINAL, BA-205, GUARDRAIL, STEEL W' 406 BEAM, POSTS, CONNECTORS, COMPLETE 500 PAVEMENT REMOVAL ON RIVERSIDE OF BOAT HOUSE 1 I 1.00 j LS j $1,500.00 1 1.00 j 0.00 j $0.00 2 j 2.00 j EACH j $3,000.00 j 2.00 j 0.00 j $0.00 50 j 50.00 j LF j $35.00 1 50,00 1 0.00 1 $0.00 45,00 j 45,00 j SY j $5.00 j 45.00 j 0.00 1 $0.00 501 4" CONCRETE PAD FOR BIKE RACKS 502 6" CONCRETE PATIO WITH INTEGRAL GRADE BEAM 13 j 13.00 1 SY 1 $140.00 1 13.00 1 0.00 j $0.00 45 j 45.00 j CY j $475.00 1 30.75 j -14,25 j-$6,768.75 503 POURED -IN -PLACE j 120 1 120.00 j SF 1 $25.00 j 120.00 1 0.00 1 $0.00 INTEGRAL COLORED CONCRETE, GRAY IN COLOR 504 POURED -IN -PLACE INTEGRAL COLORED 505 4-SEAT PLEXUS BENCH, AS 506 SCARBOROUGH TRASH RECEPTACLE, AS PER PLAN 507 BIKE RACK, AS PER PLAN 508 SWAMP WHITE OAK (2" CAL. 509 BALD CYPRESS (2" CAL. B&B) 510 HARDWOOD MULCH FOR TREE PLANTINGS 511 TOPSOIL AMENDMENT FOR TREE PLANTINGS 400 j 400.00 j SF j $15,00 1 400.00 1 0.00 1 $0.00 2 j 2.00 1 EACH 1 $5,000.00 1 2.00 1 0.00 1 $0.00 2.0 j 2.00 j EACH 1 $2,000,00 j 2.00 j 0.00 j $0.00 6 j 6.00 j EACH j $300.00 1 6.00 j 0.00 1 $0.00 3 j 3,00 j EACH 1 $500.00 j 3.00 j 0.00 j $0.00 3 j 3.00 j EACH j $450.00 1 3.00 j 0.00 j $0.00 6 j 6.00 j CY j $50.00 j 6.00 j 0.00 1 $0.00 8 1 8.00 j CY j $40.00 1 8.00 j 0.00 j $0.00 INCREASE/DECREASE THIS PAGE ONLY -$6,768.75 F.Y. 2018 Waterloo Boathouse Enhancements Contract 940 Waterloo Iowa FINAL QTY ADJUSTMENT 11-08-2019 Item No. DESCRIPTION Page 4 of 4 Contract 1 Authorized I 1 1 Final 1 Quantity I Increase/ Quantity 1 Quantity 1 Unit 1 Unit Price 1 Quantity 1 Difference 1 Decrease A-003 CLASS 10 EXCAVATION - ENTRANCE ROAD 310 1 310,00 1 CY 1 $15.00 1 310.00 1 0.00 1 $0.00 1 A-111 PAVE ENT REMOVAL-PHALTIC CEMENT CONCRETE 1,176 1 1176.00 1 SY 1 $5.00 1 1,176.00 1 0.00 1 $0.00 1 ENTRANCE ROAD A-301 SUBBASE, MODIFIED, 6" I 1,395 1 1395.00 1 SY 1 $8.50 i 1,395.00 1 0.00 1 $0.00 COMPACTED THICKNESS, (UNDER HMA)-ENTRANCE ROAD PAVEMENT, HMA, 3,000,000 A-302 ESAL, BASE COURSE, 3/4" MIX, 3" 1 1,176 1 1176.00 1 SY 1 $14.00 1 1,176.00 I 0,00 1 $0.00 THICK -ENTRANCE ROAD PAVEMENT, HMA, 3,000,000 A-303 ESAL, INTERMEDIATE COURSE, 1 1,176 1 1176.00 1 SY 1 $7.25 1 1,176.00 1 0.00 1 $0.00 1/2" MIX, 1.5" THICK -ENTRANCE ROAD A-304 PAVEMENT, HMA, 3,000,000 1 1,176 1 1176.00 1 SY 1 $8.50 1 1,176.00 1 0.00 $0.00 ESAL, SURFACE COURSE, 1/2" I MIX, 1.5" THICK -ENTRANCE B-402 ALT B-ELECTRICAL AND LIGHTING, COMPLETE 1 1 1.00 1 LS 1 $72,500.00 1 1.00 1 0.00 1 $0.00 CO #1 ELECTRICAL CONDUCTOR 1 1 1 1.00 1 LS 1 $9,736.10 1 1.00 1 0.00 1 $0.00 CHANGE, INSTALL CONDUIT FROM UTILITY TRANSFORMER CO #2 REMOVE RUBBLE AT BOAT 1 1 1 1.00 1 LS 1 $15,378.44 1 1.00 1 0.00 1 $0.00 LANDING AND MODIFY STRUCTURE CO #3 CONCRETE GROUT FOR RIP RAP 1 12 1 12.00 I CY 1 $250.00 1 15.00 1 3.00 1 $750.00 CO #4 ROADSTONE FOR ACCESS TO OVERFLOW PARKING 150 1 150.00 1 TONS 1 $20.00 1 70.76 1 -79.24 1-$1,584.80 CO #5 CHANGES TO SOUTHWEST STORMWATER DETENTION 1 1 1.00 1 LS 1 $11,225.00 1 0.00 1 -1.00 I -$11,225.00 INCREASE/DECREASE THIS PAGE ONLY-$12,059.80 INCREASE/DECREASE ALL PAGES $22,582.78 Original Contract Amount Change Order 1 signed by City of Waterloo Change Order 2 signed by City of Waterloo Change Order 3 signed by City of Waterloo Change Order 4 signed by City of Waterloo Change Order 5 signed by City of Waterloo Final Quantity Adjustment Final Contract Amount $787,364.75 $9,736.10 $15,378.44 $3,000.00 $3,000.00 $11,225.00 $22,582.78 $852,287.07