CHANGE ORDER #1
PROJECT: F.Y. 2020 RIP RAP REPAIRS ALONG LEVEE SYSTEM
CONTRACT NO. 999 Date Prepared: December 20, 2019 AMOUNT: $29,400.00 INCREASE
TO: BOULDER CONTRACTING, LLC , Contractor
You are hereby ordered to perform the following extra work on your contract dated December 2. 2019.
A. Description of extra work to be done:
1001 Class D Revetment - River Road
1002 Class D Revetment - Boathouse
1003 Class D Revetment - Ped Pathway
1004 Class D Revetment - Cedar Bend
1005 Mobilization - River Road
1006 Mobilization - Boathouse
1007 Mobilization - Ped Pathway
1008 Mobilization - Cedar Bend
1009 Traffic Control - River Road
1010 Traffic Control - Boathouse
1011 Traffic Control - Ped Pathway
1012 Traffic Control - Cedar Bend
B. Reason for ordering extra work:
The United States Army Corps of Engineers (USACE) made their annual inspection of the City's
levee system the week of December 94' through the 134). During this inspection, four additional areas
of repair in the rip rap were found. These areas are:
• around the outfall for the storm sewer gatewell D- on River Road;
• along the top of levee between the steps and outdoor seating area by the Boathouse;
• a spot location between 184' Street and Blowers Creek;
• around the outfall for the Cedar Bend Street storm sewer pump station.
These areas were not known when the project was developed. A separate project for this small
amount of repairs is not financially responsible and so it was thought prudent by Engineering to add
these repairs into an existing contract and have the issues addressed before spring flooding.
C. Settlement for cost of extra work to be made as follows:
1001 100.0 TONS @ $45.00 / TON = $4,500.00
1002 200.0 TONS @ $63.00 / TON = $12,600.00
1003 20.0 TONS @ $50.00 / TON = $1,000.00
1004 150.0 TONS @ $53.00 / TON = $7,950.00
1005 1.0 Lump Sum @ $750.00 = $750.00
1006 1.0 Lump Sum @ $750.00 = $750.00
1007 1.0 Lump Sum @ $250.00 = $250.00
1008 1.0 Lump Sum @ $750.00 = $750.00
1009 1.0 Lump Sum @ $300.00 = $300.00
1010 1.0 Lump Sum @ $300.00 = $300.00
1011 1.0 Lump Sum @ $100.00 = $100.00
1012 1.0 Lump Sum @ $200.00 = $200.00
$29,450.00
Sheet: 1. of 2
I /
BY: Q.Z.)-QAt-7191_
Mayor Date
ATTEST:
TOTAL INCREASE $29,450.00
BOULDER CONTRACTING, LLC
CONTRACTOR
BY:
TITLE:Afit
APPROVED:
Date
Date
City Engineer bate