HomeMy WebLinkAboutBoulder Contracting, LLC - FY2020 Rip Rap Repairs along Levee, Cont No. 999 - 1/6/2020CITY OF WATERLOO, IOWA CHANGE ORDER #1 PROJECT: F.Y. 2020 RIP RAP REPAIRS ALONG LEVEE SYSTEM CONTRACT NO. 999 Date Prepared: December 20, 2019 AMOUNT: $29,400.00 INCREASE TO: BOULDER CONTRACTING, LLC , Contractor You are hereby ordered to perform the following extra work on your contract dated December 2. 2019. A. Description of extra work to be done: 1001 Class D Revetment - River Road 1002 Class D Revetment - Boathouse 1003 Class D Revetment - Ped Pathway 1004 Class D Revetment - Cedar Bend 1005 Mobilization - River Road 1006 Mobilization - Boathouse 1007 Mobilization - Ped Pathway 1008 Mobilization - Cedar Bend 1009 Traffic Control - River Road 1010 Traffic Control - Boathouse 1011 Traffic Control - Ped Pathway 1012 Traffic Control - Cedar Bend B. Reason for ordering extra work: The United States Army Corps of Engineers (USACE) made their annual inspection of the City's levee system the week of December 94' through the 134). During this inspection, four additional areas of repair in the rip rap were found. These areas are: • around the outfall for the storm sewer gatewell D- on River Road; • along the top of levee between the steps and outdoor seating area by the Boathouse; • a spot location between 184' Street and Blowers Creek; • around the outfall for the Cedar Bend Street storm sewer pump station. These areas were not known when the project was developed. A separate project for this small amount of repairs is not financially responsible and so it was thought prudent by Engineering to add these repairs into an existing contract and have the issues addressed before spring flooding. C. Settlement for cost of extra work to be made as follows: 1001 100.0 TONS @ $45.00 / TON = $4,500.00 1002 200.0 TONS @ $63.00 / TON = $12,600.00 1003 20.0 TONS @ $50.00 / TON = $1,000.00 1004 150.0 TONS @ $53.00 / TON = $7,950.00 1005 1.0 Lump Sum @ $750.00 = $750.00 1006 1.0 Lump Sum @ $750.00 = $750.00 1007 1.0 Lump Sum @ $250.00 = $250.00 1008 1.0 Lump Sum @ $750.00 = $750.00 1009 1.0 Lump Sum @ $300.00 = $300.00 1010 1.0 Lump Sum @ $300.00 = $300.00 1011 1.0 Lump Sum @ $100.00 = $100.00 1012 1.0 Lump Sum @ $200.00 = $200.00 $29,450.00 Sheet: 1. of 2 I / BY: Q.Z.)-QAt-7191_ Mayor Date ATTEST: TOTAL INCREASE $29,450.00 BOULDER CONTRACTING, LLC CONTRACTOR BY: TITLE:Afit APPROVED: Date Date City Engineer bate Sheet 2 of-