Loading...
HomeMy WebLinkAboutAECOM - FY2020 Virden Creek , Cont No. 947 - 1/21/2020AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO VIRDEN CREEK LEVEE IMPROVEMENTS U.S. HIGHWAY 63 TO 4TH STREET CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 3 WHEREAS, a Professional Services Agreement was entered into between City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated June 27, 2011, for increasing the flood protection level of the Virden Creek channel and earthen levee from U.S. Highway 63 to Gates Park near 4th Street in Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 on December 11, 2017, for additional design, including collecting additional stream channel data, completing a hydrologic review of the project area and preparing a hydraulic model of the stream using the new data; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2 on August 20, 2018, for additional structural design; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 3 for construction -related services. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. Project Description This project includes modifications to approximately 700 linear feet of existing concrete retaining walls, construction of approximately 4,100 linear feet of new concrete walls, installation of four temporary closure structures, installation of approximately 10,500 square yards of concrete channel lining, demolition of an existing building, site restoration and miscellaneous associated levee improvements for Virden Creek from U.S. Highway 63 to 4th Street. II. Scope of Services The Scope of Services for this supplemental agreement will encompass and include detailed work, services, materials, equipment, personnel and supplies necessary to provide construction -related services for the project defined above. The Scope of Services is further defined by the following tasks: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Project Control b. Mark Removals c. Set Stakes at 50-Foot Intervals for Grading d. Set Stakes for Retaining Wall Construction e. Set Stakes for Channel Lining Pavement f. Set Stakes at 25-Foot Intervals for Paving AECOM Page 2 Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare bi-monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 6. Witness/provide, where applicable, field testing of the facilities furnished under the contract to assist in determining conformance with the contract documents. Task 7. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Conduct bi-weekly construction progress meetings with representatives from the Contractor and the City. Task 8. Prepare and assist the Client and Contractor in processing contract change orders. Task 9. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 10. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 11. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 12. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 13. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 14. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 15. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 16. Prepare and assist the Client with the final close-out documentation received from the Contractor. AECOM 111. Compensation Page 3 Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement and Supplemental Agreement Nos. 1 and 2. The estimated fee is Three Hundred Seventy - Five Thousand Dollars ($375,000.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated June 27, 2011. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 3 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. N/ Douglas S indel, P.E. Associate Vice President APPROVED FOR CITY OF WATERLOO BY Quentin Hart Mayor Date January 22, 2020 Date 1/Z1 /ZZc O:Wdministration'AGREE\SUPPLE\SA3 Wat Virden Creek Levee Improvements CRS.doc