Loading...
HomeMy WebLinkAboutAment Design - Supplemental Agreement No. 1 - 2/17/2020Owner Project No. 942 Professional Services Agreement for ANSBOROUGH AVENUE FROM U.S. 20 TO SAN MARNAN DRIVE IMPROVEMENTS CONSTRUCTION PHASE Supplemental Agreement No. 1 This is an AGREEMENT, made as of the day of re-6 by and BETWEEN the City of Waterloo, Iowa, identified as the Owner; City of Waterloo, Iowa City Hall 715 Mulberry Street Waterloo, IA 50703 and the Consultant; Ament Design 625 32nd Avenue SW Cedar Rapids, IA 52404 for the following Project: in the year 2020: The parties hereto entered into an agreement dated the second (2nd) day of April, 2018 for construction phase services for the Ansborough Avenue from U.S. 20 to San Marnan Drive Improvements in the City of Waterloo. The Owner desires to employ the Consultant to provide additional work in connection with the construction of the improvements. The Consultant is willing to perform the construction -related services in accordance with the terms hereinafter provided and warrants that it is in compliance with Iowa statutes relating to the licensure of professional engineers. ARTICLE 1 INITIAL INFORMATION This Agreement is based on the following information and assumptions. 1.1 Project Parameters The objective or use is: Provide additional construction phase services related to close-out of the construction contract. 1.2 Financial Parameters 1.2.1 The financial parameters are; Amount of the Owner's budget for the Consultant's compensation is: An additional amount of $2,033.80 with total compensation of Ninety-three thousand fifty-three dollars and 80/100 cents ($93.053.80) 1.3 Time Parameters 1.3.1 Date to Proceed: Consultant is to begin work under this Agreement upon receipt of a written notice to proceed from the Owner. 1.3.2 This Agreement Amendment does not alter the schedule presented in the original Contract Agreement. ARTICLE 2 SCOPE OF SERVICES AND OTHER SPECIAL TERMS AND CONDITIONS 2.1 Enumeration of Parts of the Agreement. 2.1.1 The work to be performed by the Consultant under this Agreement shall encompass and include all detail work, services, materials, equipment and supplies necessary to prepare and deliver the scope of services provided in Attachments A. Page 1 of 4 ARTICLE 3 FORM OF COMPENSATION 3.1 Method of Reimbursement 3.1.1 For the Consultant's services as described under Article 2, compensation shall be as defined in Attachment C. ARTICLE 4 TERMS AND CONDITIONS 4.1 Extension of Time 4.1.1 The time for completion of each phase of this Agreement shall not be extended because of any delay attributed to the Consultant, but may be extended by the Contract Administrator in the event of a delay attributed to the Owner or the Contract Administrator, or because of unavoidable delays caused by an act of God, war, government actions, or similar causes beyond the reasonable control of the Consultant. 4.2 Consultant's Endorsement on Plans 4.2.1 The Consultant shall endorse the completed computations prepared under this Agreement, and shall affix thereto the seal of a licensed professional engineer or architect, licensed to practice in the State of Iowa, in accordance with the current Code of Iowa. 4.3 Severability If any section, provision or part of this Agreement shall be adjudged invalid or unconstitutional, such adjudication shall not affect the validity of the Agreement as a whole or any section, provision, or part thereof not adjudged invalid or unconstitutional. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their proper officials thereunto duly authorized as of the dates below indicated. Ament Design Date: Michael G. Dryden, PE Secretary/Treasurer City of Waterloo, Iowa ryAevo-"Z' ,2020 Date: r --/-3 , 2020 Printed Name: VG 4' n T- 01." Title: 1`6 icy P:1City of Waterloo- Ansborough AvenuMADMINISTRATIONCONTRACTWuborough Avenue Construction Phase Agreement Amendment No. l.docPage 2 of 4 ATTACHMENT A Scope of Services Scope of Services The scope of services to be performed by the ENGINEER shall be completed in accordance with generally accepted standards of practice and shall include the services and supplies to perform tasks listed below. Additional Construction Phase Services Construction Phase Services — Due to weather delays Project completion was delayed requiring the expenditure of additional funds for construction phase services for construction observation, construction surveys and administration of the construction contract. II. Deliverables A. ENGINEER Deliverables 1. No changes to original agreement III. Owner's Responsibilities MATERIAL AND INFORMATION TO BE PROVIDED BY THE OWNER: The OWNER shall provide the following material and information related to the project: A. Nothing noted PACity of Waterloo-Ansborough AvenueWOMINISTRATION\CONiRACTIAnsborough Avenue Construction Phase Agreement Amendment No. 1.docPage 3 of 4 ATTACHMENT C (referenced from 3.1) Fees and Payments - Cost Plus Fixed Fee 3.1.1 FEES AND PAYMENTS 3.1.1.1 Fees. For full and complete compensation for all work, materials, and services furnished under the terms of this Agreement Amendment, the Consultant shall be paid an additional fee as outlined below. Original Fee Amendment No. 1 Maximum Amount Payable $ 91,020.00 $ 2,033.80 $ 93,053.80 P:VCity ofWaterloo- Ansborough AvenuoWOMINISTRATIONICONTRACTIAnsborough Avenue Construction Phase Agreement Amendment No. 1.docPage 4 of 4