HomeMy WebLinkAboutHenkel Construction - Change Order No. 1 - 4/6/202010
V uiithny 'Trivf far Over a Cenfuity
Mason City, IA Ames, IA
Henkel Construction Company
208 East State Street
Mason City, Iowa 50401-3406
Phone: (641) 423-5674
Fax: (641) 423-9244
Project: 1978M - 5 Sullivan Bros CC Kitchen Imp
200 West 4th St
Waterloo, Iowa 50701
Prime Contract Potential Change Orden #0010 Bock Excavation and BacGdo�o
TO:
PCO NUMBEPJREVISION
REQUEST RECEIVED FROM:
City of Waterloo
715 Mulberry Street
Waterloo Iowa, 50703
001 /0
STATUS: Pending - In Review
REFERENCE:
FIELD CHANGE: No
FROM
:
CONTRACT:
CREATED BY:
CREATED DATE:
Construction Company
208 East State St
Mason City Iowa, 50401
1 - 5 Sullivan Bros CC Kitchen Imp Prime
Contract
Brian Tenge (Henkel Construction
Company)
1/21 12020
Henkel
PRIME CONTRACT None
CHANGE ORDER:
LOCATION: ACCOUNTING Amount Based
METHOD:
SCHEDULE IMPACT: PAID IN FULL: No
TOTAL AMOUNT: $443013,00
POTENTIAL CHANGE ORDER TITLE: Rock Excavation and Backfill
CHANGE REASON: B
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract is Changed As Follows)
CE #001 -Rock Excavation and Backfill
Rock excavation, haul off spoils and backfill with sand.
Unit Price $850.00 per cubic Yard
Ticket #1 12/18/19 - 14.88 Ton
Ticket#2 1/2/20 - 14.61 Ton
Ticket #3 117/20 - 14.37 Ton x 35%=5.03 Ton (only 35% of this load was used).
Total Tons = 34.52 Tons x 1.5 (conversion to CY) = 51.78
ATTACHMENTS:
PR #2 Unit Pricing (2).odf Beraan Sand Tickets.pdf
Approved By:
Name:.
Date: �� �a0,;
Henkel Construction Company page 1 of 1 Printed On: 1/21/ 2020 09 :48 AM