HomeMy WebLinkAboutASPRO, Inc.-2/22/2016CITY OF WATERLOO
Council Communication
Motion approving Change Order No. 7 for a net increase of $143,225.71 for the F.Y.
Reconstruction Program, Contract No. 859; and authorize the Mayor and City Clerk to execute said
document.
City Council Meeting: 2/22/2016
Prepared: 2/16/2016
Motion approving Chane Order No. 7 for a net increase of $143,225.71
SUBJECT: for the F.Y. 2014 Street Reconstruction Program, Contract No. 859; and
authorize the Mayor and City Clerk to execute said document.
Submitted by: Submitted By: Dennis Gentz, PE, Assistant City Engineer
This is the accumulated amount of adjustments from original to final
Summary Statement: quantities that were determined necessary during the construction of the
project, which results in an increase to the total project cost.
Source of Funds: Local Option Sales Tax
CITY OF WATERLOO, IOWA
CHANGE or EXTRA WORK ORDER NO.
PROJECT: F.Y. 2014 STREET RECONSTRUCTION PROGRAM CONTRACT NO. 859
Date Prepared: February 16, 2016 AMOUNT: $143,225.71 INCREASE
TO:
Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated April 21, 2014 .
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering change or extra work:
As -built quantities varied for some bid items.
C. Settlement for cost of work to be made as follows:
Compensation already made to contractor through original bid items.
See attached summary.
CITY OF WATERLOO
BY: QL.oA-ZL 2/Zyll�v
Mayor Date
AT EST:
City Clerk Date
NET DECREASE $143,225.71
UN- •:• OW
CONTRACTOR
i
Date
u
PRINTED NAME: Milt Dakovich
TITLE: President
City Engineer T Date
Change Order No. 7 Contract No. 859 Page 1 of 1
F.Y. 2014 STREET RECONSTRUCTIQN PROGRAM CONTRACT NO. 859
FINAL QUANTITY
SUNNARY
BID ITEM
DESCRIpTION
UNIT
ASPRQ
PLAN
TOTAL
INCR/DECR
INCR/DECR
UNIT$
QTY
QTY
QTY
AMOUNT
fl
DIVISION 1 BASE BID - SECTJON 1
_________
CONSTRUCT, MAINTAIN, REMOVE TEMPORARY ACCESS AND RE
SY
$5a40
93.3
58.0
35.30
.9..; 1
2
MISC. PCC, 9", 0-4
SY
$69,00
167.5
0.0
167.50
3.60
('11, .
$504.00
3
REMOVE AND REPLACE MISO. 7.5" HF4A
SY
$140.00
3.8
0.0
4
REMOVE AND REPLACE MISC. 9.0' HMA
SY
SY
SY
TON
$97.80
$75.00
$42.25
$190.00
218.6
341.0
133.4
28.2
56.4
45.1
178.7
3.9
162.20
295.90
45.30
24.30
.1.1
(. ,l -
$I,913.93
$4 617.00
5
REMOVE AND REPLACE MISO, 7" P00, 0-4
6
REMOVE/REPLACEMISCSEALCOATW/2"HMA
7
ACC DRIVEWAYAPPROA0II
8
DRIVEWAY APPROACH 6.5" AC0
TON
$0.00
0.0
0.0
0.00
$0.00
9
DRIVEWAYAPPROA0H AND SAJ, 6" PCC, 0-4
SY
$44.75
956.9
1019.3
62.40
$2 792.40
10
DRIVEWAYAppRQA0HAND SiW, 5" P00, 0-4
SY
$43,75
3524.7
3539.7
15.00
$656.25
11
SIDEWALK 4" P00, C-4
SY
$42.50
725.2
929.0
1478.0
851.8
1011.7
1322.0
126.60
82.70
156.00
$5.380.50
$3,804.20
$5,772.00
12
PEDESTRIAN MMP, P00 SIDEWALK, 6" P00 C-4
SY
$46.00
13
PEDESTRIAN RAMP DETE0TABLE WARN1Nc3 SURFACE
SF
$37.00
14
SIDEWALKCURB5EOTJON
LF
$35.00
$800.00
315.9
1.60
246.6
2.61
69.30
1.01
$2,425.60
$808.00
15
MIS0ELLANEOUS 0ONCRETE
CY
16
CONORETEPAVEMENTREMOVAL
5'!
$4.25
45061.6
45261.6
200.20
$850.85
17
ASPHALT PAVEMENT REMOVAL
SY
$4.25
15764.9
16196.1
411.20
$l,747.60
18
SIDEWALKAND DRIVEWAYREMOVAL
5'!
5'!
$4.25
$6.50
5387.6
721.8
4995.1
661.3
392.50
139.50
$l,668.12
$906.75
19
SIDEWALKREMOVAL
20
SAWCUT
LF
SY
$4.40
$4.50
2714,0
21072.4
2463,5
355.3
250.50
20717.10
$l,102.20
$93226.95
21
GEOGRID
22
WOVEN GEOTEXTILE
SY
$4.50
32322.5
32253.9
68.60
$308.70
23
MODIFIED SUBBASE
TON
TON
$22.00
$46.00
29,894,10
40.00
44,748.59
5.05p$jI31
14854.49
$326 798.78
$l,677.60
24
RECYLEDASpHALTpAVING
25
26
27
ROADSTONE, 3/4"
TON
$48,00
117,00
125.48
_:kl
5407.04
DRAINTILE, 6"
LF
58.95
30981.0
29975.5
1005.50
$B,999.23
DRAIN TILE, 4" .
LF
57.40
1500.0
150,0
1350.00
59990.00
28 -
DRAIN TILE STU8, 4"
LF
517.40
1645.0
2030.0
385.00
56699.00
29
DRAIN TILE TAP AND COLLAR
EA0H
5650.00
21.0
136.0
650.0
20.0
123.0
1.00
15.00
(5650.00
54275.00
30
RF -190, INLET OUTLET DETAIL (RODENT GUARD)
EA0H
LF
5285.00
51.00
2001
REMOVE SUBDRAIN TILE
850.0
0.00
50.00
31
0ONVERT WATER VALVE ?V%ANHOLE TO ROADBOX
EACH
5525.00
27.0
96.0
98,0
98,0
2491,0
2.0
25.0
18.0
43.0
91.0
2956.0
0.0
2.00
80.00
55.00
7.00
467,00
2.00
51,050,00
54,040,00
$8,525.00
51,085,00
$l0,554,20
5108.00
32
WATER SERVICE CORPORATION, 3/4"
EA0H
EACH
EA0H
LF
550.50
5155,00
$l55.00
522.60
554,00
33
WATER SERVICE CURB STOP, 3/4"
34 -
WATER SERVICE PAVE 80X, 3/4"
35
OOPPERWATERSERVJCE 314"
36
WATER SERVI0E CORPORATION, 1"
EA0H
37
WATER SERVICE CURB STOP, 1"
EACH
5205,00
2.0
3.0
1.00
5205.00
38
WATER SERVICE PAVE BOX, 1"
EACH
5205,00
2.0
6.0
4,00
5820,00
39
4p
COPPER WATER SERVICE, 1"
LF
524.20
50.0
68.0
18,00
5435,60
WATERSERVICEKILL
EAOH
5385.00
14.0
15.0
1.00
5365.00
41
WATER SERVICE TAP, 314" OR 1"
EACH
EACH
5115.00
5775.00
2.0
6.0
19,0
13.0
3.0
18.0
11.00
3.00
(1,00)
51,265,00
52,325,00
(5335.00)
42
LOWER WATER SERVICE, 3/4" OR 1"
43
UNDERGRDUND INVESTIGATIQN-WATER
EACH
5335,00
44
45
46
LOWER WATER SERVICE, 3/4" DOWNINGAVENUE
TOPSOIL, 4"
LF
SY
524.15
516.75
1254,0
8775,3
1315.0
9336.4
61.00
561,10
51,473.15
59,398.42
FIYDROSEED
SY
53.10
670,0
10762,7
210,7
14800.9
459.30
4038,20
51,423.83
541,997.28
47
TOPSOIL REMOVAL FROM PARKINO, EARTI-IWORK
SY
510.40
48
CONSTRUCTION SURVEY
L5
564,175,00
1.000
1.000
0.00
50.00
5001
CONSTRUCTIOU SURVEY - IIARMOND AVE. STORE
LS
5225.00
1,000
1.000
0,00
50.00
49
TRAFFI0 CONTROL
LS
552 000.00
1.000
1.000
0.00
50.00
50
DETOUR ROUTE - BERT0H 51'.
LS
53,000.00
1.0
1.0
0.00
50.00
51
DETOUR ROUTE DOWNING AVE.
LS
53000.00
1.0
1.0
0,00
50.00
52
DETOUR ROUTE - LAFAYETTE ST.
LS
LS
53,000.00
53,000.00
1.0
1.0
1.0
1.0
0,00
0,00
50.00
50.00
53
DETOUR ROUTE - HAMMDND AVE.
54
DETOUR ROUTE - MITCHELLAVE.
LS
LS
$3,000,00
53,000.00
1,0
1.0
1.0
0,00
50.00
55
-
DETOUR ROUTE - EASTON AVE.
1.0
0,00
50.00
56
57
-
PERMANENTUR8AN ROAD CLOSURE BARRICADE
LS
51500.00
1.0
1.0
0,00
50.00
PAINTED PAVEMENT MARKING, WATER BASED
STA
550.00
57.360
59.812
2,452
5122.60
58
PAVEMENT1RKING, SYMBOL OR LEGEND
EACII
EA0H
S.Y.
5260.00
52,500.00
56.70
13,00
1.0
45.0
12.00
0.0
0.0
1.00
1.00
(45.00)
5260,00
52,500.00
5301.50
5210,541.94
59
RELOCATE STREET LIGHT
60
ROLLED EROSION CDNTROL PRODUCT
TOTAL BASE DID - DIVISION 1 SECTION 1
Page - 1
2/16/2016
1:11 PM
F.Y. 2014 STREET RECONSTRIJCTION PROGMM --- CONTRACT NO. 859
FINAL 001017777 SUN3IARY
UNIT
ASPRO
PLAN
TOTAL
INCRIDECR
INCR/DECR
DIVISION 1 BASE 010 - SECTION IV - STORM SEWER IN ALLEYS
UNIT $
QTY
QTY
QTY
AMOIJNT
106
SAWING
LF
$5.00
80.0
34.3
62.0
19.5
(18.00)
(14.80)
($90.00)
($96.20)
107
SIDEWALKAND DRIVEWAY REMOVAL
SY
$6.50
108
REMOVE AND REPLACE MISC. 4.5" HMA OVER 6" P00, M-4
SY
SY
$I43.00
$44.75
$43.75
$1 .315.00
55.1
22.3
12.0
1.0
51.7
19.5
0.0
1.0
(3.40)
(2.80)
(12.00)
0.00
($486.20)
($125.30)
($525.00)
$0.00
109
ALLEY OR DRIVEWAYAPPROACH AND S, 6" P00, C-4
110
DRIVEWAYAPPROACH 5' P00, C-4
SY
EACH
111
TAP AND OOLLAR STORM MANHOLE
112
SW -5l1 RECTANGULARAREA INTAKE
EACH
$2,915.00
1.0
1.0
0.00
$0.00
113
TYPE E -2-C INLET
EACH
$3,295.00
1.0
0.0
(1.00)
($3,295.00)
114
STORM SEWER, 2000D, 12'
LF
$37.05
330.0
310.0
(20.00)
($741.00)
$0.00
$0.00
115
FLARED END SECTION, 2000D, 12"
CONSTRUCTION SURVEY
EACH
LS
$l,315.00
$2,500.00
1.0
1.0
1.0
1.0
0.00
0.00
116
117
EXCAVATION/GRAOING
SY
$8.00
256.0
78.0
0.0
0.0
(256.00)
(78.00)
($2,048.00)
($3,744.00)
118
RECYLED ASPHALT PAVING
TON
$48.00
119
TRAFFIC CONTROL
LS
$2,000.00
1.0
1.0
0.00
$0.00
1001
TYPE SW -509 INLET
EACH
$5,049.00
1.0
1.0
0.00
$0.00
59
RELOCATESTREETLIGHT
EACH
$2,500.00
0.0
1.0
1.00
$2,500.00
84
FURNISH AND INSTALL MANNOLE RING AND COVER
EACH
$875.00
0.0
1.0
1.00
$875.00
85
STORMWATER PROTECTION FOR STRUCTURES
EACH
$460.00
0.0
1.0
1.00
$460.00
TOTAL BASE 010 - DIVISION 1 SECTION IV
($7,315.70)
UNIT
ASPRO
PLAN
TOTAL
INOR/DECR
INCRJDECR
DIVISION 1 BASE 010 - SECTION V - SIDEWALK INFILL
IJNIT $
QTY
QTY
QTY
AMOUNT
120
SIDEWALK, 4" PCO 0-4
SY
$42.50
316.5
0.0
(316.50)
($13,451.25)
121
SIDEWALK, 5" P00, C-4
SY
$43.75
36.6
0.0
(36.60)
($l,60l.25
122
EXOAVATION FORNEWSIDEWALK
SY
$15.00
353.1
0.0
(353.10)
($5,296.50)
TOTAL BASE 010 - DIVISION 1 SECTION V
($2O,349.0
UNIT
ASPRO
PLAN
TOTAL
INOR/DECR
INCRJDEOR
DIVISION 1 BASE 810 - OHANGE ORDER NO. 4
UNIT $
QTY
QTY
QTY
AMOUNT
4001
OONSTRUCT SANITARY SEWER, 8"
LF
$60.50
398.0
392,0
(6.00)
($363.00)
4002
STANDARD SANITARYNtNHOLE 48"
EACH
$4,7B6.00
2.0
2,0
0.00
$0.00
4003
TRAFFIO CONTROL
LS
$500.00
1.0
1.0
0.00
$0.00
TOTAL OHANGE ORDER NO. 4
($363.00)
TOTAL BASE 810
BID ITEM
DESORIPTION
UNIT
ASPRO
PLAN
TOTAL
INOR/DEOR
INOR/DEOR
ALTERNATE A
UNIT $
QTY
QTY
QTY
AMOUNT
1A
2", HM.A IMS 1/2", 60% OR
SY
$l0.70
22029.8
22,096,5
66.70
$713.69
2.A
2 1/2", HMA 113/4", 60% CR
SY
$ll.50
22029.8
22,096.5
66.70
$767.05
3A
3", IIMAIM B 3/4", 60% OR
SY
$13.55
22029.8
22,096.5
66.70
$903.79
4A
2", HMA3M 5 112",75% OR
SY
$10.75
31599.8
32, 349.2
749,40
$8,056.05
5A
4", HMA 3M 13/4", 75% OR
SY
$18.95
8783.4
9,558.1
774.70
$14,680.57
6A
51/2" HMA 3M 13/4", 75% CR
SY
$25.85
22561.1
22,607.8
48.70
$l,207.20
7A
3" HMA3M 8 3/4",75% CR
SY
$13.60
31344.5
32,165.9
821.40
$1l,171.04
8A
CURB AND GUTTER, P00, 0-4, 24"WIDE, 71/2' THI0K
LF
$12.75
14327.2
14, 390.0
62.80
$800.70
9A
CURB AND GUTTER, P00, 0-4, 24" WIDE, 9" THICK
LF
$14.25
5340.0
5,741.0
401.00
$5,714,25
IOA
CURB AND GUTTER, P00, 0-4, 24" WIDE, 10.5" TIIICK
OOLD WEATHER CONCRETE PROTEOTION
LF
SY
$15.50
$3.75
12676.7
3209.1
3209.1
255.6
1.00
12,460.5
717.8
2,412.7
0.0
1.0
(216.20)
(2491.30)
(796.40)
(255.60)
0,00
($3,351 .10)
($9,342.38)
($3,265.24)
($2,556.00)
$0.00
IIA
12A
LINSEEDOILTREATMENT
SY
SY
LS
$4.10
$l0.00
$5 000.00
13A
PAVEMENTSOARIFICATION
PAVEMENT SAMPLES AND TESTING
14A
iSA
EXCAVATION
CY
$l0.50
17900.9
20, 900.2
2999.30
$31,492.65
16A
SPEED HUMP, PER DETAIL
LS
$2,500.00
1.0
1.0
0,00
$0.00
TOTAL ALTERNATE A
$56,992.26
Page - 3
2/16/2016
1:11 PM