HomeMy WebLinkAboutPeters Construction-2/8/2016TRANSMITTAL
DATE: 01.28.16
PROJECT: WCA Schoitz Room Renovation PROJECT #: INVISION: 15054
TO: Peters Construction Via:0
❑ First Class Mall o
0
0 O
❑ United Parcel Service 8
P
❑ Overnight o 0i cei
0
®Hand Delivered n o M
[:i Email: =ow
v P
❑Fax:
1 i w
Em "+
ITEMS: NO. DESCRIPTION Pages to Follow: e — s
• �m
3 Changer Order 001 h a
Copy Form To: File
MESSAGE: Please sign and return to our office for further processing. Thank you.
Waterloo:
319.233.8419
319.233,9772- fax
BY:
V4�
Lisa Chamberlin
lisac@invisionarch.com
E
co 8
Z O -
o zi
• Luo
a3._
!AIA
TM
Document G7OITM - 2001
Change Order
PROJECT (Name and address): CHANGE ORDER NUMBER: 001
15054 - Waterloo Center for the Arts DATE:
Schoitz Room Renovation
TO CONTRACTOR (Name and address):
Peters Construction
901 Black Hawk Road
PO Box 2940
Waterloo, IA 50704
ARCHITECT'S PROJECT NUMBER: 15054
CONTRACT DATE:
CONTRACT FOR: General Construction
OWNER: ❑
ARCHITECT: ❑
CONTRACTOR: ❑
FIELD: ❑
OTHER: ❑
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
1. PR #1 - Paint existing precast ceiling following asbestos abatement
ADD $4,435.00
2. PR #2 - Relocate conduit on the south wall above new acoustical ceiling system
ADD $498.75
3. PR #3 - Replace the existing lined ductwork mains at the far west and far east side of the room. Provide duct traverse at the far
west and far east ductwork mains as they enter the room.
ADD $5,343.00
4. PR #4 - Patch VCT floor tile to match existing tiles. Provide new 4" traditional cove rubber base for the entire room
ADD $2,440.00
5. PR #5 - Repaint all existing walls with one coat of paint
ADD $2,293.00
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
$ 132,318.00
$ 0.00
$ 132,318.00
$ 15,009.75
$ 147,327.75
The Contract Time will be increased by Zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is unchanged
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE
INVISION Architecture, LTD
ARCHITECT, CONTRACTOR AND OWNER.
ARCHITECT (Firm name)
501 Sycamore #101, PO Box 1800,
Waterloo, IA 50704-1800
A
Peters Construction
CONTRACTOR (Firm name)
901 Black Hawk Road, PO Box 2940,
Waterloo, IA 50714
BY (Signature)
Michael Broshar, FAIA
(Typed name)
DATE
City of Waterloo
OWNER (Firm name)
715 Mulberry Street, Waterloo, IA 50703
ESS
AJ
gnature BY (Signature)
1?
A** (SILLE7f
('Typed name)
DATE 7 � �U. DATE
('Typed name)
AIA Document G701 TM - 2001. Copyright ® 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA®
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 16:53:17 on 01/25/2016 under Order No.2650364998_1 which expires on 07/20/2016, and is not for resale.
User Notes: (1362375531)