Loading...
HomeMy WebLinkAboutPeters Construction-2/8/2016TRANSMITTAL DATE: 01.28.16 PROJECT: WCA Schoitz Room Renovation PROJECT #: INVISION: 15054 TO: Peters Construction Via:0 ❑ First Class Mall o 0 0 O ❑ United Parcel Service 8 P ❑ Overnight o 0i cei 0 ®Hand Delivered n o M [:i Email: =ow v P ❑Fax: 1 i w Em "+ ITEMS: NO. DESCRIPTION Pages to Follow: e — s • �m 3 Changer Order 001 h a Copy Form To: File MESSAGE: Please sign and return to our office for further processing. Thank you. Waterloo: 319.233.8419 319.233,9772- fax BY: V4� Lisa Chamberlin lisac@invisionarch.com E co 8 Z O - o zi • Luo a3._ !AIA TM Document G7OITM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 001 15054 - Waterloo Center for the Arts DATE: Schoitz Room Renovation TO CONTRACTOR (Name and address): Peters Construction 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 ARCHITECT'S PROJECT NUMBER: 15054 CONTRACT DATE: CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) 1. PR #1 - Paint existing precast ceiling following asbestos abatement ADD $4,435.00 2. PR #2 - Relocate conduit on the south wall above new acoustical ceiling system ADD $498.75 3. PR #3 - Replace the existing lined ductwork mains at the far west and far east side of the room. Provide duct traverse at the far west and far east ductwork mains as they enter the room. ADD $5,343.00 4. PR #4 - Patch VCT floor tile to match existing tiles. Provide new 4" traditional cove rubber base for the entire room ADD $2,440.00 5. PR #5 - Repaint all existing walls with one coat of paint ADD $2,293.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be $ 132,318.00 $ 0.00 $ 132,318.00 $ 15,009.75 $ 147,327.75 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE INVISION Architecture, LTD ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Firm name) 501 Sycamore #101, PO Box 1800, Waterloo, IA 50704-1800 A Peters Construction CONTRACTOR (Firm name) 901 Black Hawk Road, PO Box 2940, Waterloo, IA 50714 BY (Signature) Michael Broshar, FAIA (Typed name) DATE City of Waterloo OWNER (Firm name) 715 Mulberry Street, Waterloo, IA 50703 ESS AJ gnature BY (Signature) 1? A** (SILLE7f ('Typed name) DATE 7 � �U. DATE ('Typed name) AIA Document G701 TM - 2001. Copyright ® 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:53:17 on 01/25/2016 under Order No.2650364998_1 which expires on 07/20/2016, and is not for resale. User Notes: (1362375531)