Loading...
HomeMy WebLinkAboutAECOM of Waterloo, Iowa-1/19/2016CITY OF WATERLOO �v Council Communication Resolution approving Supplemental Agreement No. 1 with AECOM, of Waterloo, Iowa, in the maximum amount payable of $24,700.00 for Sink Creek Channel Clean Out and Shaping, and authorize Mayor to execute said document. City Council Meeting: 1/19/2016 Prepared: 1/13/2016 REVIEWERS: Department Reviewer Action Date Engineering Thorson, Eric Approved 1/13/2016 - 10:10 AM Cleric Office Higby, Nancy Approved 1/13/2016 - 10:48 AM Resolution approving Supplemental Agreement No. I with AECOM of Waterloo Iowa in the maximum amount payable of $24,700.00 for Sink SUBJECT: Greek Channel Clean Out and Shaping, and authorize Mayor to execute said document. Submitted by: Submitted By: Wayne Castle, PLS, PE, Associate Engineer Scope of services will include detailed work, services, material, equipment, personnel and supplies necessary for design, regulatory permit application submittals and agency coordination for the project. The project consists of developing a channel typical section and plans for Summary Statement: cleaning out and shaping approximately 1,900 feet of the main channel of Sink Creek from Cedar Terrace Drive to Juniper Drive extended in Waterloo. The channel shaping project will also consist of reviewing realigning options based on Iowa Department of Natural Resources criteria for approximately 550' of the existing channel downstream of Cedar Terrace Drive. An existing culvert outlet at Balsam Street will also be reviewed for a potential extension and outlet into Sink Creek. Expenditure Required: not to exceed $24,700.00 Source of Funds: G.O. Bonds & Storm Water Fee ACOM AECOM 319-232-6531 tel 501 Sycamore Slreet 319-232-0271 fax Suite 222 Walerloo, Iowa 50703 www.aecom .com CITV OF WATERLOO SINK CREEK CHANNEL CLEAN OUT AND SHAPING SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), ol Waterloo, lowa, dated May 18, 2015, tor maintenance operations along approximately 1,900 feet of the main channel 01 Sink Creek 1 rom Cedar Terrace Drive to Juniper Drive extended in Waterloo, Iowa; and WHEREAS, the Client and Consultant now desire to enter into Supplemental Agreement No. 1 to develop a channel typical section and plans tor cleaning out arid shaping approximately 1,900 teet ot the main channel of Sink Creek from Cedar Terrace Drive to Juniper Drive extended in Waterloo, Iowa. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as tollows: Project Description The project consists ot developing a channel typical section and plans tor cleaning out and shaping approximately 1,900 teet ot the main channel ot Sink Creek 1 rom Cedar Terrace Drive to Juniper Drive extended in Waterloo, Iowa. The channel shaping project will also consist ot reviewing realigning options based on Iowa Department of Natural IResources (IDNR) criteria for approximately 550' ot the existing channel downstream of Cedar Terrace Drive. An existing culvert outlet at Balsam Street will also be reviewed for a potential extension and outlet into Sink Creek. Scope of Services The Scope of Services for the project will encompass and include detailed work, services, material, equipment, personnel and supplies necessary for design, regulatory permit application submittals and agency coordination tor the project. The Scope of Services is further defined below. Task 1 - Survev/Base Mappincj Development. This task includes developing base mapping tor the channel shaping project. The base mapping will incorporate Lidar and field survey 01 sections approximately every 100' along the channel, as wefl as a streambed profile. Task 2 - Plan Preparation and Desicin. This task will involve development of construction plans and specifications according to regulatory agency and City of Waterloo standards. The plans will include channel shaping and grading information. Final stabilization information will also be included as part ot the design. Right-of-way plats are not included in the Scope of Services tor the project. It is anticipated the City will obtain right -of -entry permits to complete the work necessary tor the project. The following tasks lead to the completion of the plan preparation: • Title and Legend Sheets • Typical Sections and Details • Bid Items and General Notes a. Bid Item and Quantity Listing b. Estimate Reterence lnformation c. General Notes • Tabulations and Quantities AXOM Page 2 • Plan Sheets • Pollution Prevention Plan • Construction Cost Estimate • Specifications • Printing and Submittals • Field Review Task 3 - Permitting Applications and Agency Coordination. This task includes coordination with the IDNR for flood plain permitting and U.S. Army Corps of Engineers (USAGE) for Section 404 permitting. The design of this project will include channel realignment and grading activities within an existing modeled floodplain and floodway and will require an IDNR flood plain permit approval. It is not anticipated a Conditional Letter of Map Revision (CLOMR) and Letter of Map Revision (LOMB) will be required for the project. However, the IDNR may require these updates based on the channel realignment. If required, the CLOMR/LOMR could be added as a supplemental agreement. Based on a preliminary review of the National Wetlands Inventory for the project area, it does not appear wetlands are present. However, United States Army Corps of Engineers Section 404 review is still required, and they may request a wetland investigation be completed prior to Section 404 approval. This task includes coordination with the USACE but does not include a wetland investigation. If required, this investigation could be added as a supplemental agreement. Task 4 - Hydraulic Modeling. This task will include working with the City of Waterloo in requesting the duplicate effective hydraulic model from FEMA. The task also includes updating the model with the proposed channel changes in place. Task 5 - Project Administration, Coordination and Meetings. This task includes project administration, coordination and meetings throughout the project development. The task includes two meetings with property owners during development of the project. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement. The estimated fee is Twenty -Four Thousand Seven Hundred Dollars ($24,700.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated May 18, 2015. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL /SERVICES, INC. gy ynvnm Date January 13, 2016 Doug as hindel, P. E. Associate Vice President APPROVED FOR CITY OF WATERLOO By: Date Quentin Hart Mayor 0:Wdministmtion\AGREEtSUPPLEtSA1 Wat Sink Creek Channel Cleanout.doc