Loading...
HomeMy WebLinkAboutRecreation Engineering & Planning of Boulder Colorado-1/11/2016CITY OF WATERLOO Council Communication Resolution approving Supplemental Agreement No. 1 to the Professional Services Agreement with Recreation Engineering & Planning, of Boulder, Colorado, in the amount of $245,865.00, paid for with WDC Gaming Funds, for preliminary engineering and design in conjunction with the construction of a whitewater course on the Cedar River in downtown Waterloo. City Council Meeting: 1/11/2016 Prepared: 1/5/2016 REVIEWERS: Department Engineering Reviewer Thorson; Eric Action Approved ATTACHMENTS: Description Type WW course Supp agreement no 1 Cover Memo SUBJECT: Submitted by: Recommended Action: Summary Statement: Expenditure Required: Source of Funds: Date 1/5/2016 - 4:35 PM Resolution approving Supplemental Agreement No. 1 to the Professional Services Agreement with Recreation Engineering & Planning, of Boulder, Colorado, in the amount of $245 865.00 paid for with WDC Gaming Funds, for preliminary engineering and design in conjunction with the construction of a whitewater course on the Cedar River in downtown Waterloo. Submitted By: Jamie Knutson, PE, Associate Engineer Approve the Supplemental Agreement No. 1 to the Professional Services Agreement. This agreement is for preliminary engineering and design related to the construction of a whitewater course located on the north side of the Cedar River in downtown. This supplemental agreement does not change the dollar amount of the agreement. It's the addition of a task to look at alternatives for the tow- head dam at 6th Street. $245,865.00 Paid for with WDC Gaming Funds. Cedar River Whitewater and Habitat Improvement Project Waterloo, IA Contract Modijication #1 By Recreation Engineering & Planning (REP) January 4, 2016 Contract modifications are shown in red and do not affect the total contracted amount. This contract is being sent to Jamie Knutsen, PE, as requested. /711 Recreation Engineering & Planning Recreation Engineering and Planning Whitewater, Habitat, and Bankside Improvements Project ,Cedar Preliminary Design, Permitting, and Final Design 10/21/2015 (Contract Modification 01-04-2016) TASK Task I: Preliminary Design, Bathymetric Survey, and Permitting Applications River, Services 0w 2 i v. 'o a. Z E = 166 Waterloo, Iowa Task Subtotal $ 38,865 Phase Subtotal $ 169,375 1 1 Preliminary Design: 70% drawings including plan of up to six instream structures that are structurally and hydraulically sound, aesthetically pleasing, and natural in appearance. Includes design of modified and enhanced put -in areas and take-out areas, stair modifications, lighting, signage, banners, and railings completed by AHTS Architects. Includes plan, profile, section. and typical drawings. The plan will incorporate comments, suggestions, and agreed upon design provided by project proponents and be suitable for permit applications. Includes three meeting by AHTS with City officials and one meeting with Veteran's 1.2 Preliminary Cost Estimate: Cost estimates suitable for 70%design drawings. 13 $ 2,080 l.3 Bathymetric Data: Obtain bathymetric (river bottom) survey data necessary for the design of the instream portion of the park. REP will provide a bathymetric topographical map at the appropriate scale. Costs include two REP representatives and four technicians on-site for approximately 1.25 days to collect data. If client is able to collect the data, REP is available for remote coordination at $145/hour. 73 $ 11,680 1.4 Instream Permit Applications: Includes permit applications for work below the ordinary high water line. Deliverables include permit applications to the Iowa DNR Fisheries, Floodplains, and Natural Lands in addition to US Army Corps of Engineers 404 permit application. Does not include permit applications that may be necessary for work upland of the ordinary high water line or the floodwall permits. 34 $ 5,440 1.5 Upland Permit Applications: Includes 408 permit application for work upland of the ordinary high water line and associated with modification to the put -in area and take-out area. Additional tasks noted below with a *. 59 $ 9,440 1.?.1 'Geo -technical Borings: Includes 2 borings and associated reporting completed by Terracon. Also includes a review of existing data and seepage analysis. $ 8,000 1.5.2 *Structural Review. Includes review and stamping of structural design associated with the stairs and movement of the floodwall. 76 $ 12,160 1.5.3 *Hydraulic Analysis: Includes review of hydraulics and scour associated with design. 29 $ 4,640 It citation LnQiileerin3_> and Planning l85 Arapahoe Ave Boulder CO 180302 (303) 515.5883 F:'`RI?P Fileslwalcrloo\proposalsiWaterloo 14___16.doc 1 Cedar River Whitewater and Habitat Improvement Project Waterloo, IA Recreation Engineering & Planning 1.5.4 *Operations and Maintenance Plan: Includes operations and maintenance plan as requested during the 408 permit process. 13 $ 2,080 1.5.5 *Emergency Contingency During Construction: Includes a contingency plan for flooding during construction as requested during the 408 process. 7 $ 1,120 1.5.6 *Hydrologic and Hydraulic Analysis Related to Floodplain: Includes updating the existing HEC -RAS model of Record to include the existing and proposed infrastructure. 47 $ 7,520 1.5.7 *Cofferdam Design: Includes design and recommendations to contractor for placement, elevations, and extents of the cofferdams needed for the project. 17 $ 2,720 1.5.8 *Access and Staging Design: Design and coordination for up to two access points around and/or through existing lloodwalls including BMP's, required "cuts" and replacement of existing infrastructure, initial coordination with adjacent landowners, and design and quantification of any materials needed for riverside and instream haul roads. Does not include additional structural design and engineering that may be needed on impacted areas. 34 $ 5,440 1.6 Wall Art: Includes concept design and presentation of two alternatives and presentation to stakeholders. Includes a second meeting during the final design to confirm stakeholder approval. Includes final design. 158 $ 12,340 1.7 Interactive Hydraulic Feature Design: Includes Preliminary Design, review by City Staff, Final Design, and cost and quantity estimate for a feature incorporating existing hydraulic drop to create an interactive feature designed for kids and adult to further understanding of hydraulics and water physics. 43 $ 6,880 1.8 Water Feature Within Expanded Access Point: Includes Preliminary Design, review by City Staff, Final Design, and cost and quantity estimate for a water feature for aesthetics, wading, and ambiance within the expanded access. 24 $ 3,840 1'9 6th Street Dam Demolition: Includes coordination with access plan in 1.5.8, design and specifications for removal of the low head dam to the appropriate grade. Includes notification to US Army Corps of Engineers but no formal application or review process. 38 $ 8,080 1.10 On-site Meetings: Includes two meetings with one REP representative on-site for up to two days to meet with stakeholders, City staff, and sub consultants for issues such as the Veteran's Memorial, Signage, 408 and 404 Permitting, design charrettes, and public outreach. 56 $ 8,960 1.11 Project Safety Site Visit and Memo: Includes one REF' on-site to meet with interested stakeholders on the safety, signage, and public access associated with the site. REP staff will tour the site, prepare a memo, and present to stakeholders and the public. Recommendations on signage will be included in the design drawings. 28 $ 4,480 1.12 6th Street Dam Alternatives Analysis: Includes conceptual renderings, narratives, and cost estimates for three design alternatives at the dam. One alternative will be a full removal, one will be a enhanced area for fishing, and a third alternative will be for fishing and whitewater boating improvements. $ 7,680 Recreation Engineering and Planning 485 Arapahoe Ave Boulder (.OI80302 (303) 515-•5883 1 :.REP Files`, waterloo\ proposals\Waterloo_1 4_I6.duc 2 Cedar River Whitewater and Habitat Improvement Project Waterloo, IA Recreation Engineering & Planning 1'13 Expenses: Includes office expenses at $1,730 plus direct expenses associated with Task 1.10 which are approximately $1,400 per trip. $ 5,930 Task 2: Final Design, Permitting Support & Construction Documents 158 $ 45,280 $ 76,490 Includes $10,000 for Responses in Item 2.2 2.1 Instream Final Design Construction Ready Documents: Includes plan, profile, and section drawings for up to six structures plus put -in and take-out as designed by AHTS in the 70% drawings. Includes design for movement of the adjustable gates. Plan drawings include key elevations required for construction plus relevant dimensions. Profile drawings include existing and proposed elevations. Section drawings include existing and proposed dimensions including key elevations and break points. Deliverables include typical drawings for additional areas, as needed. Includes design for movement of the adjustable gates and associated infrastructure. 2.2 Responses: Respond to questions, comments, and concerns from federal, state, and local permitting agencies including 404 and 408 issues. Hour y at $160/hour. Estimated at $5,000- $10,000 2 3 Specifications: Includes final design specifications for construction of project following applicable standards. Includes general notes, standards, recommendations, and criteria for construction of specific elements of the project. 20 $ 3,200 2.4 As -built Survey: Includes as -built survey topographical map completed following construction. Assumes the adjustable gates can be raised to provide easy access to the project. There will be additional expenses if the project cannot be "dried out". 32 $ 4,800 2 5 On-site Meetings: Includes two meetings with one REP representative on-site for up to two days to meet with stakeholders, City staff, and sub consultants for issues such as the Veteran's Memorial, Signage, 408 and 404 Permitting, design charrettes, and public outreach. 56 $ 8,960 2 6 Expenses: Includes office expenses at $1,450 plus direct expenses associated with Task 2.4 which are approximately $1,400 per trip. $ 4,250 Subtotals including expenses: $ 245,865 Total: $ 245,865 Notes: I) Does not include additional surveying following construction nor any permit conditions or requests from permitting agencies. Does not include wetland, archaeological, cultural, or any biological surveys that may be requested during permitting. 2) Does not include additional local permits that may be necessary prior to construction. 3) Does not include completion of a Conditional Letter of Map Revision (CLOMR) or LOMR. Recreation Engineering and Planning. 185 Arapahoe Ave Bou trier I CO j 80 302 (303)545-5883 F:',REP Files`, valerloo\proposals\Waterloo_1_•1_16.doc 3 Cedar River Whitewater and Habitat Improvement Project Waterloo, IA Recreation Engineering & Planning Payment Invoices will be sent every 30 days for work completed plus expenses. Payment is due within 30 days. If the above proposal is acceptable to you, please sign below. Submitted by: Approved by: REP ,t4, Shane A. Sigle, P.E., Engineer Date C_J)i(-Qi2G4 td;CA) 9 & ertIrk rx Date I _ccreation Erwinccrinw and Planninp, 485 Arapahoe Ave Boulder I CO 1 80302 1.303) 545-5883 F:''REP Pilestwaterloo\proposals\VVaterloo I21_l6.doc 4