HomeMy WebLinkAboutAECOM Technical Services, Inc.-12/21/2015Letter of Transmittal
TO: Waterloo Regional Airport
2790 Livingston Lane
Waterloo. Iowa 50703
WE ARE SENDING YOU:
N Attached
❑ Shop Drawings
❑ Copy of Letter
A=COM
DATE: December 14, 2015
1 JOB ID NO.:
ATTENTION: Mr. Keith Kaspari
RE: FY 2016 Vertical Infrastmcture Projects
]DOT Project No. 91160AL0200
IDOT Contract No. 17488
❑
❑ Prints ❑ Under separate cover via
❑ Change Order ❑ Plans ❑ Samples
1-1
COPIES DATE NO. DESCRIPTION
3 Agreements for Above -Referenced Project
THESE ARE TRANSMITTED AS CHECKED BELOW:
N
For approval
❑
For your use
❑
As requested
❑
For review and comment
❑
For Bids due
20
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
the following items:
❑ Specifications
❑
Resubmit
copies for approval
❑
Submit
copies for distribution
❑
Return
corrected prints
❑ Prints returned after loan to us
REMARKS: Upon approval, please return two (2) original executed agreements. We look forward to working with the Waterloo Regional
COPY TO: Mr. David Hughes, P.E.
If enclosures are not as noted, kindly notify us at once.
Schindel, P.E.
501 Sycamore Street, Suite 222 • P.O. Box 1497 0 Waterloo, Iowa 50704-1497 • (319) 232-6531 0 Fax: (319) 232-0271
AZCOM AECOM
501 Sycamore Street
Suite 222
Waterloo, Iowa 50703
www.aecomoom
FY 2016 VERTICAL INFRASTRUCTURE PROJECTS
IDOT PROJECT NO. 91160AL0200
[DOT CONTRACT NO. 17488
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
Project Description - See Attachment and Incorporated Herein.
Scope of Services - See Attachment and Incorporated Herein.
Compensation
319-232-6531 tel
319-232-0271 fax
Compensation for services for this project shall be a cost plus fixed fee not -to -exceed Sixteen
Thousand Nine Hundred Dollars ($16,900.00) without authorization of the Client. See attachment
and incorporated herein.
General Conditions
Except as specifically amended by this Individual Project Agreement, Services shall be provided in
accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered
between AECOM Technical Services, Inc. (ATS) and the City of Waterloo (Client) dated April 15,
2014.
APPROVED:
CERLO0, IOWA
BITY OF W y �
Ernest G. Clark, Mayor
APPROVED:
AECOM TECHNICAL SERVICES, INC.
By 1
Douglas W. Sc iDdel, P.E.
Associate Vice President
Date October 21, 2015
AZCOM
SCOPE OF SERVIGES
FY 2016 VERTICAL INFRASTR(JCTURE PROJECTS
IDOT PROJECT NO. 911 60AL0200
IDOT CONTRACT NO. 17488
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
Project Description
The project is described as the projects associated with the Iowa Department of
Transportation FY 2016 Vertical lnfrastructure Projects. Projects identified in the grant
include the foliowing:
1. lnstall new Pedestrian Access Door froni Terminal Buildinq to Baq Claim Tuq Area.
The new door will allow airline personal easier access to unload bags from the
baggage tug onto the baggage belt by providing access directly from the terminal
building without having to egress the building and enter the bag claim belt area
from outside of the terminal building. The new door will require access control
system integration into the existing airport access control system.
2. Replace Exterior Doors in Terminal Buildinq Baq Makeup Area. The current doors
are rolI-up steel doors, and the new doors will be more energy efficient and
customer friendly.
3. Removal of Interior lnsulation Panels, Cleanino of Interior South Wall, Rerair and
ReDaintinq of South Wall in Hanciar No. 4. Damage to wafl is due to water
infiltration through the exterior of the wall system.
Scope of Services
The work to be performed by ATS includes the following tasks:
1. Data Collection and Review. This task consists of the collection of existing data
applicable to this project and related to the proposed work site. The record
drawings of completed projects and utility information will be compiled as
background information for the project. The Client shall coordinate with lease
hotders of Hangar No. 4 so that ATS can gain access to these in a timely manner
for the purpose of survey, investigation and photographic documentation of the
Hangar No. 4 existing wall conditions.
2. Final Desiqn. This task consists of the preparation of the final bid documents for
this project, including specifications, drawings (if required) and cost estimates. The
final plans and/or specifications will set forth the requirements of the design phase.
3. Final Proiect Specifications. This task consists of the preparation of
specifications for the project. The specifications will be in compliance with current
City of Waterloo and Iowa Department of Transportation requirements in effect at
the time the specifications are prepared.
A&COM
4. Estimate of Probable Gonstruction Cost. This task consists of the preparation of
an estimate of construction costs based upon the plans and specifications. This
Statement of Probable Construction Cost prepared by ATS represents ATS's best
judgment as a design professional at the time the estimate is drawn. It is
recognized, however, that neither ATS nor the Client has any control over the cost
of labor, materials ar equipment; over the contractor's method of determining bid
prices; or over competitive bidding or market conditions. Accordingly, ATS cannot
and does not guarantee that bids will not vary from any Statement of Probable
Construction Cost or other cost estimates prepared by ATS.
5. Qualitv Review. This task consists of the quality review of work elements on the
project. During the course of this project, quality reviews will be conducted by
senior technical personnel not directly involved in the project.
6. Bid Assistance. This task consists of assisting the Client in advertising for and
receiving bids or quotes, analyzing the bids or quotes received and preparing a
recommendation to the Client for award of contract.
7. Bid Document Interpretation. This task consists of answering bid document
interpretation questions from bidders, preparing and issuing any required addenda.
8. Resident Review. This task consists of limited on-site construction review at key
critical construction operations to observe construction operations to determine
compliance with contract documents. Site reviews will be documented in a
construction journal. Coordination with airport tenants related to this project will be
the responsibility of the Client.
9. Project Administration. This task consists of office administration and
coordination of the project. lnteroffice rneetings, general day-to-day administrative
responsibilities, and typing of interoffice memoranda and minutes of rneetings are
included in this task.
0:Wlministration'AGREE\PROF'AL0 2016 IDOT CSVI .doc
2016 Commerical Service Vertical Infrastructure
Waterloo Regional Airport
Waterloo, Iowa
IDOT Project No. 91160AL0200 1 Contract No. 17488
Engineering Services
Consultant Cost Summary
Direct Labor Cost
Cateaorv Hours Rate/Hour Amount
Senior Professional 8 $77.30 $618.40
Project Professional 12 $54.65 $655.80
Staffprofessional 28 $43.35 $1,213.80
Professional 32 $34.40 $1,100.80
CADD Operator 11 16 $33.10 $529.60
CADD Operator 1 24 $23.40 $561 .60
SeniorTechnician 24 $33.80 $811.20
Technician 0 $24.85 $0.00
ProjectSupport 8 $29.15 $233.20
152
$5,724.40
11. Payroll Burden and Overhead Costs 149.10% $8535.08
111. Direct Pro]ect Expenses
Catecjory Units Rate/Unit Amount
Mileage 400 0.575 230.00
Per Diem 0 45.00 0.00
Lodgng 0 90.00 0.00
B/W Copies 500 0.06 30.00
Colorcopies 50 0.22 11.00
PIan Copier 100 0.50 50.00
EDM Equipment 0 12.50 0.00
GPS Equipment 0 25.00 0.00
Miscellaneous, Other 200.00
$521 .00
IV. AECOM Estimated Actual Costs $14,780.48
Rounded $14800.00
V. Subcontract Expense
$0.00
VI. Estimated Actual Costs $14,800.00
VII. Fixed Fee (15% of Items 1 & 11) $2,100.00
Vill. Maximum Amount Payable (Lump Sum) $16,900.00
2016 Commerical Service Verticat lnfrastructure
IDOT Project No. 91160AL0200 1 Contract No. 17488
Engineering Services
Staff Hour Estimate
24
152
Project
Support
w
Techniciari
0
Senior
Technician
('1
30
0
('1
CADD
Operator 11
(0
Prof
�
28
o
0
0 '4-
c2
c.,j
c'J
(0
Description
Data Collection & Review
Proiect Plans
Proiect Soecifications
EstimateofConstruction Cost
0)
>
0)
0
0
Bid Assistance
Bid Document Interoretation
Resident Review
Proiect Admiriistration
Total Design Services