Loading...
HomeMy WebLinkAboutAECOM Technical Services, Inc.-12/21/2015Letter of Transmittal TO: Waterloo Regional Airport 2790 Livingston Lane Waterloo. Iowa 50703 WE ARE SENDING YOU: N Attached ❑ Shop Drawings ❑ Copy of Letter A=COM DATE: December 14, 2015 1 JOB ID NO.: ATTENTION: Mr. Keith Kaspari RE: FY 2016 Vertical Infrastmcture Projects ]DOT Project No. 91160AL0200 IDOT Contract No. 17488 ❑ ❑ Prints ❑ Under separate cover via ❑ Change Order ❑ Plans ❑ Samples 1-1 COPIES DATE NO. DESCRIPTION 3 Agreements for Above -Referenced Project THESE ARE TRANSMITTED AS CHECKED BELOW: N For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ For Bids due 20 ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections the following items: ❑ Specifications ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ Prints returned after loan to us REMARKS: Upon approval, please return two (2) original executed agreements. We look forward to working with the Waterloo Regional COPY TO: Mr. David Hughes, P.E. If enclosures are not as noted, kindly notify us at once. Schindel, P.E. 501 Sycamore Street, Suite 222 • P.O. Box 1497 0 Waterloo, Iowa 50704-1497 • (319) 232-6531 0 Fax: (319) 232-0271 AZCOM AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecomoom FY 2016 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91160AL0200 [DOT CONTRACT NO. 17488 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment and Incorporated Herein. Scope of Services - See Attachment and Incorporated Herein. Compensation 319-232-6531 tel 319-232-0271 fax Compensation for services for this project shall be a cost plus fixed fee not -to -exceed Sixteen Thousand Nine Hundred Dollars ($16,900.00) without authorization of the Client. See attachment and incorporated herein. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. (ATS) and the City of Waterloo (Client) dated April 15, 2014. APPROVED: CERLO0, IOWA BITY OF W y � Ernest G. Clark, Mayor APPROVED: AECOM TECHNICAL SERVICES, INC. By 1 Douglas W. Sc iDdel, P.E. Associate Vice President Date October 21, 2015 AZCOM SCOPE OF SERVIGES FY 2016 VERTICAL INFRASTR(JCTURE PROJECTS IDOT PROJECT NO. 911 60AL0200 IDOT CONTRACT NO. 17488 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2016 Vertical lnfrastructure Projects. Projects identified in the grant include the foliowing: 1. lnstall new Pedestrian Access Door froni Terminal Buildinq to Baq Claim Tuq Area. The new door will allow airline personal easier access to unload bags from the baggage tug onto the baggage belt by providing access directly from the terminal building without having to egress the building and enter the bag claim belt area from outside of the terminal building. The new door will require access control system integration into the existing airport access control system. 2. Replace Exterior Doors in Terminal Buildinq Baq Makeup Area. The current doors are rolI-up steel doors, and the new doors will be more energy efficient and customer friendly. 3. Removal of Interior lnsulation Panels, Cleanino of Interior South Wall, Rerair and ReDaintinq of South Wall in Hanciar No. 4. Damage to wafl is due to water infiltration through the exterior of the wall system. Scope of Services The work to be performed by ATS includes the following tasks: 1. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and utility information will be compiled as background information for the project. The Client shall coordinate with lease hotders of Hangar No. 4 so that ATS can gain access to these in a timely manner for the purpose of survey, investigation and photographic documentation of the Hangar No. 4 existing wall conditions. 2. Final Desiqn. This task consists of the preparation of the final bid documents for this project, including specifications, drawings (if required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Proiect Specifications. This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. A&COM 4. Estimate of Probable Gonstruction Cost. This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This Statement of Probable Construction Cost prepared by ATS represents ATS's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither ATS nor the Client has any control over the cost of labor, materials ar equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, ATS cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by ATS. 5. Qualitv Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance. This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. 7. Bid Document Interpretation. This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review. This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration. This task consists of office administration and coordination of the project. lnteroffice rneetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of rneetings are included in this task. 0:Wlministration'AGREE\PROF'AL0 2016 IDOT CSVI .doc 2016 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa IDOT Project No. 91160AL0200 1 Contract No. 17488 Engineering Services Consultant Cost Summary Direct Labor Cost Cateaorv Hours Rate/Hour Amount Senior Professional 8 $77.30 $618.40 Project Professional 12 $54.65 $655.80 Staffprofessional 28 $43.35 $1,213.80 Professional 32 $34.40 $1,100.80 CADD Operator 11 16 $33.10 $529.60 CADD Operator 1 24 $23.40 $561 .60 SeniorTechnician 24 $33.80 $811.20 Technician 0 $24.85 $0.00 ProjectSupport 8 $29.15 $233.20 152 $5,724.40 11. Payroll Burden and Overhead Costs 149.10% $8535.08 111. Direct Pro]ect Expenses Catecjory Units Rate/Unit Amount Mileage 400 0.575 230.00 Per Diem 0 45.00 0.00 Lodgng 0 90.00 0.00 B/W Copies 500 0.06 30.00 Colorcopies 50 0.22 11.00 PIan Copier 100 0.50 50.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 200.00 $521 .00 IV. AECOM Estimated Actual Costs $14,780.48 Rounded $14800.00 V. Subcontract Expense $0.00 VI. Estimated Actual Costs $14,800.00 VII. Fixed Fee (15% of Items 1 & 11) $2,100.00 Vill. Maximum Amount Payable (Lump Sum) $16,900.00 2016 Commerical Service Verticat lnfrastructure IDOT Project No. 91160AL0200 1 Contract No. 17488 Engineering Services Staff Hour Estimate 24 152 Project Support w Techniciari 0 Senior Technician ('1 30 0 ('1 CADD Operator 11 (0 Prof � 28 o 0 0 '4- c2 c.,j c'J (0 Description Data Collection & Review Proiect Plans Proiect Soecifications EstimateofConstruction Cost 0) > 0) 0 0 Bid Assistance Bid Document Interoretation Resident Review Proiect Admiriistration Total Design Services