HomeMy WebLinkAboutAECOM-Boomerang-Change Order No. 3-Contract 880-12/16/2019Please return this copy to: Ctty Clerk & Finance Dept, 715 Mulberry St. Waterloo, IA 50703 AECOM December 11, 2019 Mr. Randy Bennett Waste Management Services 3505 Easton Avenue Waterloo, Iowa 50702 AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Subject: Change Order No. 3 Flow Equalization Facility Overflow Connection to Satellite WPCF Waterloo, Iowa City Contract No. 880 AECOM #60507078 Dear Mr. Bennett: 319-232-6531 tel 319-232-0271 fax Enclosed please find Change Order No. 3 for the above -referenced project. The purpose of this change order is to excavate and backfill an additional 120 cubic yards of material in the US Army Corps of Engineers levee to adjust a pipe alignment to match the orientation of a fitting. This item follows Army Corps of Engineers required materials and procedures for work in the levee. This change includes any tasks by the Contractor for this associated work. It is recommended to move forward with this Change Order No. 3 in the amount of $10,000.00. If you have any questions or need additional information, please let us know. Thank you. Yours sincerely, Ross A. Hillsman, PE Enclosure: As Noted c: Boomerang Corporation C:\Users\coselman b\AppDatalLocal\Microsoft\Windows\INetCache\Canten(.Outlook\SLMRTCOD\2019-12-11 Trnsmtl to Randy Bennett Watedoo FEO Overflow - CO #3.docx CHANGE ORDER NO. 3 Owner: City of Waterloo, Iowa Date: December 6, 2019 Project: Flow Equalization Facility Overflow Connection to Satellite Owner's Contract No.: Citv Contract No. 880 Date of Contract Start: November 27, 2017 Contractor: Boomerang Corporation $ Original Contract: $693 700 You are directed to make the following changes in the Contract Documents. Description: Excavate and backfill an additional 120 cubic yards of material in the US Army Corps of Engineer's levee to adjust a pipe alignment to match the orientation of a fitting. This includes any tasks by the Contractor with this associated work. NETADD................................................................................................... Reason for Change Order: Excavate and backfill an additional 120 cubic yards of material to adjust a pipe alignment to match the orientation of a fitting. This pipeline is built in the US Army Corps of Engineer's levee at the Waterloo Water Pollution Control Facility. This includes any tasks by the Contractor with this associated work. CONTRACT PRICE Original: $ 693,700.00 Original: Previous C.O.s (ADD/DEDUCT): $ 49,316.25 Previous C.O.s (ADDIDEDUCT): This C.O. (ADD/DEDUCT): $ 10,000.00 This C.O. (ADD/DEDUCT): Contract Price with All Approved Change Orders: $ 753,016.25 REVISED: Original Completion Date: Revised Completion Date: CONTRACT TIMES (Calendar Days) To Substantial To Final Completion Completion May 31, 2018 To Be Determined It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the changes) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order, THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED City of Waterloo ACCEPTED: By: Boomerang Corporation (Authorized Signature) Pagc I of 1 Date: 60507078 Project No. AECOM 3 Change Order No.