Loading...
HomeMy WebLinkAboutWoodruff Construction-Change Order No. 10-12-Lincoln Park-5/4/2020M AN GE URDER © Mark Kidper, R ITLAND IX U111HR C7 ❑ Nate Goetsch, wouchil WConstruction ❑ ❑ Quentin (tart, MayoroflVuterloo, Town ❑ ❑ CI PROJECT: Lincoln 1'ai U'PVNER: Ciiy of Waterloo, io�va P,•Y, 2019 4973 TU: Nate Gootsch Woodruff Construction 1717 Falls Avenue Waterloo, CA 50701 ( AKI1111 ,W11 1 f' ID�i TE OF TS�;iJA1�(� I,: I I/5/2019 RiTLAND+I(UTPER Landscape Architects 501 Sycamore Street, Me7Za11it1e.A Waterloo, Iowa 50703 •You ate ciireeked to make the follo4ving changos in this Contract: I. Credit for dte >Jlectrica! Cabinet 71d- eotleirte base 7'U'I'AT, (1J>G�UCT) TO CONTRACT ($1,90?„00) AttaClln1t;11ts: 20i 9. 11.05 Estimate fio111 Woodt2lff Construction Not valid uatit signed by both file Ownet• and Architect• Slgtiattuc of ttic Contramor indicates his agreement hctcvvl I including any atijushnertt in the Coltract stun or Contract time. The original Cantrarf. StJltl was.........................................................•..,..,,,.....,.......... $734,330.30 Net change by previously authorized Change Orders.,,..,•...,,.,..•.........................•..,.....,..., $166188633 The Contract Sum prior to this Change Order was........................................................... $901,217.03 rho Conb'act Sum wlII be, (decreased) by this Change Order, . W 4 a 1 9 1 9 a * V 0 M 4 L I * r V 4 4 * 1 0 1 4 t 4 t I A 0 k P & I 1 1 4 4 0 8 1 ($I5902.00) 'file new Contract Sum including this Change Order will be, u 9 a 6 a 6 it 0 4 A 0 v 01 0 4 v I I a 0 a a a 6 41 2 1 0 a a 6 1 0 0 4 v 1 0 0 9 1 ff $8991315.03 `1'lle Contract Time will be (unchanged) zero ( 0) nays IZITLAND�-1(Ull'I_,.R Landscape Archikects ARCHITECT ,y signatme Mark Kuiper, ASLA, LEED AP Woodruff Construction CON'I'aACTOk City of Waterloo otuNntz Signature signature Nate Goetsch Mayor Quentin I -Tart 1717 Falls Avenue Wark rino, 1�15u/U'I Ph; (319) 233-3349 Fax: (319) 233-3369 November 5, 2019 RE: Waterloo 2019 Lincoln Parl<lmprovements SUBJ; Ct'edit for L'lectrical Cabinefi #4 Concrete t3ase To whom it may coalcern, The following is our pricing to credit- the Electrical Cabinet• #4 concrete base from our contracfi: Cast Breakdown Kruse Concrete insurance Bond Total Our total price to perform the changed worfc is a bEDUCT of 1 90Z,00. Sincerely, WOODRUFF CONS I RUC I ION, LLC Nate 6oetsch, Project Manager CHANGE ORDER in Mark Kuiper, RITLAND+KUIPER ❑ ❑ Nale Gocisch, woodniffConsiniction ❑ ❑ Quentin Hari, Mayororwalerloo, Iowa ❑ ❑ ❑ PROJECT: Lincoln Park OWNER; City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotscli Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 C® No.: 11 DAT>C Or ISSUANCE: I/24/2020 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Credit for t� using zinc coating anchor bolts in lieu of stainless steel anchor bolts Nb 01 TOTAL (DEDUCT) TO CONTRACT Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum of Contract tinie. ............................................ Net change by previously authorized Change Orders........................................................ $1641984.73 The Contract Sum prior to this Change Order was.... 0 00 ol 6 m I I site so as a 9 6 9 so@ footoom go a @Sol I a go &*to oto d 0 0 Not $89%315.03 The Contract Stun will be (decreased) by this Change Order.... . I @#to 6 to* OV0694#0 $1 0 00 0 oto akdo of . a 0000 $ beef ($1,350.00) The new Contract Sum including this Change Order will be ............................................... $897,965.03 The Contract Time will be (unchanged) zero ( 0) Days RITLAND+KUIPER Landscape Architects ARCHITECT Signature Mark Kuiper, ASLA, LEED AP Woodruff Construction CONTRACTOR City of Waterloo owNER Signature Signature Nate Goetsch Mayor Quentin Hart CHANGE ORDER ® Mark Kuiper, RITLAND+KUIPER ❑ ❑ Nate Goetsch, Woodruff Construction ❑ ❑ Quentin Hart, Mayor of Waterloo, Iowa ❑ ❑ ❑ PROJECT: Lincoln Park OWNER: City of Watel•loo, Iowa F.Y. 2019 4973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO NO.: 12 DATE OF ISSUANCE: 4/23/2020 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract; 1. Elimination of all joint sealant on the pI•oject. This includes all caulking of isolation joints as noted on the plans. TOTAL (DEDUCT) TO CONTRACT Attachments: 2020.04.07. Estimate from Woodt•uff Constl•uction $1,543.00 Not valid until signed by both the Owner and Architect. Signattue of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The oI•iginal Contract Sum was.................................................................................. $734,330.30 Net change by previously authorized Change Orders. . $164,984.73 The Contract Sum prior to this Change Order was. i o % * m 0 8 1 0 0 0 001 &to qK9210 01041466* **Tom@ Gates $89%315,03 The Contract Sum will be (increased) by this Change Order ................................................ ($1,543000) The new Contract Sum including this Change Order will be......... oil 02440164600 $897,772.03 The Contract Time will be (unchanged) zero ( 0) Days RITLAND+KUIPER Landscape Architects ARCHITECT Signatur Marls Kuiper, ASLA, LEED AP Woodruff Construction CONTRACTOR Signature Nate Goetsch City of Waterloo OWNER Signature Mayor Quentin Hart 1717 Falls Avenue Waterloo, IA 50701 Ph: (319) 233-3349 Fax: (319) 233-3369 April 7, 2020 RE: Waterloo 2019 Lincoln Parl< Improvements SUBJ: Proposal Request #15 —Elimination of Joint Sealants To whom it may concern, The following is our pricing per Pricing Request #15. Cost Breakdown Kruse Concrete (quote enclosed) _ ($1,500.00) Insurance = ($14.00) Bond = ($29.00) Our total price to perform the changed work is a DEDUCT of 1 543.00 Sincerely, WUODRUFF CONSTRUCTION, LLC Nate Goetsch, Project Manager PROJECT: Lincoln Park Waterloo, Iowa OWNER: City of Waterloo, Iowa F.Y. 2019 ##973 TO: Woodruff Construction, LLC 1717 Falls Avenue Waterloo, IA 50701 PROPOSAL REQUEST NO.: 15 DATE: March 24, 2020 Please submit an itemized quotation for changes to the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. All conditions of the Contract shall apply to this Change unless specifically stated otherwise. The monetary and time compensation provided by this Change fully compensate the CONSTRUCTOR for the work covered by the change and for the accumulated affect that this change has on the entire scope of the work. THIS 1S NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. The general contractor shall provide a deduct for the fallowing: 1. Elimination of all joint sealant an the project. This includes all caulking of isalation joints as noted on the plans. Nate Goetsch From: Travis Kruse <tkruse564@gmail.com> Sent; Tuesday, March 24, 2020 12:20 PM To: Nate Goetsch Subject: Re: FW: PR-15 Elimination of Joint Sealant Attachments: image001.png Deduct $1500 $500 for materials $1000 for labor. Travis Kruse Kruse Concrete LLC 408 1st St SE Tripoli, IA 50676 319-2394359 tkruse564@gmail.com On Tue, Mar 24, 2020, 10:26 AM Nate Goetsch <nateg@woodruff.build> wrote: Travis, See below and attached request. Please submit pricing for their review and approval. Thanks, Nate Goetsch � Project Manager Woodruff Construction, LLC (319) 233-3349 x101 0 www.woodruff.bulld Tlrls email, Including all attaclrrnents, is confidential Information and belongs to the sender and/or the senders company. This Information may be legally privileged. If you are not tits Intended recipient, you are hereby notified that any distribution, disclosure, copying, or taking of any action regarding the contents of this electronically transmitted information Is strictly prohibited. If you are not the Intended recipient, please reply to the sender if you have received lids message in error, and then please delete. Thank you.- Woodruff Construction 1