HomeMy WebLinkAboutAddendum No. 1 ADDENDUM NO. 1
TO THE
BIDDING DOCUMENTS
F.Y.2016 SIDEWALK REPAIR ASSESSMENT PROGRAM—ZONE 5
CONTRACT NO. 892
CITY OF WATERLOO, IOWA
DATE: August 31,2015
LETTING DATE& TIME: September 3, 2015; 1:00 P.M., Local Time(Current Bid Date)
September 10,2015; 1:00 P.M.,Local Time(New Bid Date)
TO ALL BIDDERS ON THE ABOVE PROJECT:
All Bidders submitting a bid on the above contract shall carefully read this Addendum and give it
consideration in the preparation of their bid.
TO ALL BIDDERS ON THE ABOVE PROJECT:
1. Corrected Notice of Public Hearing:
Current Bid Due Date&Time: Thursday, September 3, 2015; 1:00 PM
New Bid Due Date&Time: Thursday,September 10,2015; 1:00 PM
Current Public Hearing Date& Time: Tuesday, September 8, 2015; 5:30 PM
New Public Hearing Date& Time: Monday,September 14,2015; 5:30 PM
Any revisions to any of the Contract Documents made by this Addendum shall be considered as the same
revision to any and all related areas of the Contract Documents not specifically called out in this
Addendum.
The bidder shall acknowledge receipt of this Addendum by inserting the number and date in the spaces
provided in the Form of Bid or Proposal, Item 9,Page 2 of 3.
ayne astle,PLS,PE
Associate Engineer
City of Waterloo, Iowa
Department of Engineering
ADDENDUM NO. 1 F.Y.2016 SIDEWALK REPAIR ASSESSMENT PROGRAM—ZONE 5 Page 1 of 1
ADDENDUM NO. 1
NOTICE OF PUBLIC HEARING
On Proposed Plans, Specifications, Form of Contract,
And Estimate of Cost and the
NOTICE TO BIDDERS
For the Taking of Construction Bids
For the
F.Y. 2016 SIDEWALK REPAIR ASSESSMENT PROGRAM —ZONE 5
In the City of Waterloo, Iowa
CONTRACT NO. 892
RECEIVING OF BIDS
Sealed proposals will be received by the City Clerk of the City of Waterloo, Iowa, at her
office in the City Hall of the said City on the 10th day of September, 2015, until 1:00 p.m.
for the construction of the F.Y. 2016 SIDEWALK REPAIR ASSESSMENT PROGRAM
— ZONE 5, Contract No. 892, as described in detail in the plans and specifications now
on file in the Office of the City Clerk.
OPENING OF BIDS
All proposals received will be opened in the First Floor Conference Room at City Hall, in
the City of Waterloo, Iowa, on the 10th day of September, 2015, at 1:00 p.m., and the
proposals will be acted upon at such later time and place as may then be fixed by the
City Council.
PUBLIC HEARING
Notice is hereby given that the Council of said City will conduct a public hearing on the
proposed plans, specifications, form of contract, and estimate of cost for the
construction of the above-described improvement project at 5:30 p.m. on September 14,
2015 said hearing to be held in the Harold E. Getty Council Chambers in City Hall in
said City. The proposed plans, specifications, form of contract, and estimate of cost for
said improvements heretofore prepared by the City Engineer of the City of Waterloo are
now on file in the office of the City Clerk for public examination, and any person
interested therein may file written objection thereto with the City Clerk before the date
set for said hearing, or appear and make objection thereto with the City Clerk before the
date set for said hearing, or appear and make objection thereto at the meeting above
set forth.
SCOPE OF WORK
This project consists of removing and replacing PCC sidewalk of various widths and
thicknesses, drainage structure repair, and water valve repair within Zone 5 of the City
of Waterloo's Sidewalk Repair Program. This project is generally located in an area
bound by:
NOTICE OF HEARING CONTRACT NO. 892—ADDENDUM NO. 1 Page 1 of 5
Highway 63 —West Ridgeway— East Ridgeway— East City Limits —
South City Limits — Highway 63 and at some locations outside of Zone 5.
BEGINNING AND COMPLETION DATES
The work under the proposed contract shall be commenced within ten (10) working
days after receipt of "Notice to Proceed" and all items shall be completed on or before
December 4, 2015, weather permitting.
METHOD OF PAYMENT TO CONTRACTOR
The Contractor will be paid against bi-monthly estimates in cash on the basis of ninety-
five percent (95%) of the work as it is completed and materials delivered and work
approved. Final payment will be made thirty-one (31) days after completion of the work
and acceptance by the Council. Before final payment is made, vouchers showing that
all subcontractors and workmen and all persons furnishing materials have been fully
paid for such materials and labor will be required unless the City is satisfied that
material, men and laborers have been paid.
The Contractor is hereby notified that if the City does not have cash on hand to pay
monthly pay estimates, according to Chapter 384.57 of the Code of Iowa, payment may
be made by anticipatory warrants issued bearing a rate of interest not exceeding that
permitted by Chapter 74A, Code of Iowa.
PLANS AND SPECIFICATIONS
Plans and Specifications governing the construction of the proposed improvements
have been prepared by the City Engineer, which plans and specifications and also the
prior proceedings of the City Council referring to and defining said proposed
improvements are hereby made a part of this notice, and the proposed contract by
reference shall be executed in compliance therewith.
Plans and Specifications are available from the City Engineer upon the City's receipt of
a $25.00 refundable deposit. Deposits will be refunded if the plans are returned in
usable condition (i.e. generally free of highlights, ink markings, tears, stickers, water
stains and soiling) to the Engineer's Office by the end of the 14th consecutive day after
the project has been awarded. No deposits will be refunded for any requests or plans
received after the 14th consecutive day, which includes plans returned via mail service.
Plan holders are responsible for ascertaining when the project has been awarded. . If
the plan holder is the prime contractor or a subcontractor or supplier of the prime
contractor that has been awarded the project, Plans and Specifications do not need to
be returned to receive the deposit. The prime contractor must submit a list of his
subcontractors and suppliers for the City to verify eligibility for the refundable deposit.
Upon award of project, the prime contractor, his subcontractors and suppliers shall be
supplied with the needed number of plans and specifications at no additional cost.
CONTRACT AWARD
NOTICE OF HEARING CONTRACT NO. 892—ADDENDUM NO. 1 Page 2 of 5
A contract will be awarded for each division of the contract to the qualified bidder
submitting the lowest bid.
The City reserves the right to reject any or all bids, re-advertise for new bids, and to
waive informalities in the bids submitted that might be in the best interest of the City.
Bids may be held by the City of Waterloo, Iowa, for a period not to exceed thirty (30)
days from the day of the opening of bids for the purpose of reviewing the bids and
investigating the qualifications of bidders, prior to awarding the contract.
By virtue of statutory authority, a preference will be given to products and provisions
grown and coal produced with the State of Iowa and preference will be given to local
domestic labor in the construction of the improvement.
PROPOSALS SUBMITTED
The bidder shall submit bids on the items listed in the proposal. The bidder shall clearly
write or type the unit bid price and the bid item extension (Unit Price x Estimated Qty) in
numerals on the blanks provided. Should there be any discrepancy between the unit
bid price and extension, the City of Waterloo shall consider the unit bid price as being
the valid unit bid price.
The bidder has the option to submit a computer-generated spreadsheet in lieu of the
portion of the Form of Bid or Proposal, which includes the Bid Item Number,
Description, Unit, Estimated Quantity, Unit Bid Price, Total Bid Price and Total Bid. The
computer-generated spreadsheet shall include all of the information listed in that portion
of the Form of Bid or Proposal as well as bear the signature of the Prime Contractor
submitting the bid. For the bidders who submit a computer-generated spreadsheet, the
TOTAL BID (with alternates, if applicable) shall also be indicated in the space(s)
provided on the Form of Bid or Proposal.
BID SECURITY REQUIRED
All bids must be accompanied in a separate envelope by a certified or cashier's check
drawn on an Iowa bank, or a bank chartered under the laws of the United States, a
certified share draft drawn on a credit union in Iowa or chartered under the laws of the
United States, or bid bond, (on the form furnished by the City) payable to the City of
Waterloo, Iowa, in the sum of not less than five percent (5%) of the bid submitted, which
certified check, certified share draft or bid bond will be held as security that the Bidder
will enter into a Contract for the construction of the work and will furnish the required
bonds, and in case the successful Bidder shall fail or refuse to enter into the Contract
and furnish the required bonds, his bid security may be retained by said City as agreed
upon liquidated damages. If bid bond is used, it must be signed by both the Bidder and
the surety or surety's agent. Signature of surety's agent must be supported by
accompanying Power of Attorney.
PERFORMANCE & PAYMENT BONDS
NOTICE OF HEARING CONTRACT NO. 892—ADDENDUM NO. 1 Page 3 of 5
The successful bidder will be required to furnish a "Performance Bond" and a "Payment
Bond" within ten (10) days after forms are presented to him in an amount equal to one
hundred percent (100%) of the contract price, said bond to be issued by a responsible
surety approved by the City Council and shall guarantee the faithful performance of the
contract and the terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the City from
claims of any kind caused by the operations of the contractor.
MAINTENANCE BOND
Before the Contractor shall be entitled to receive final payment for work done under this
contract, it shall execute and file a bond in the penal sum of not less than 100% of the
total amount of the contract, same to be known as "Maintenance Bond," and which bond
must be approved by the City Council, and which bond is in addition to the bond given
by the Contractor to guarantee the completion of the work.
CONTRACT COMPLIANCE PROGRAM / SUBCONTRACTING
The program proposes numerical projections regarding utilization of Minority Business
Enterprise (MBE) and Women Business Enterprise (WBE) as Subcontractors, vendors
and suppliers in the performance of Contracts awarded by the City of Waterloo, Iowa.
A goal of at least ten percent (10%) for MBE participation on all City funded construction
projects that are estimated at $50,000.00 or more. A goal of at least two percent (2%)
for WBE participation on all City funded construction projects that are estimated at
$50,000.00 or more. Any project funded in part or in total with federal funds shall follow
the respective agencies contract compliance program and goals. The
Prime Contractor shall make "good-faith efforts" to meet the Contract Compliance
MBE/WBE goals. The MBE/WBE subcontractors, suppliers or vendors must provide
the Prime Contractor a reasonably competitive price for the service being rendered or
the Contractor is not required to accept their bid.
LIQUIDATED DAMAGES
Time is an essential element of this contract. It is important that the work be diligently
pursued to completion. If the work is not completed within the specified contract period,
plus authorized extensions, the contractor shall pay to the City Liquidated Damages in
the amount of five hundred dollars ($500.00) per day, for each day, as further described
herein, in excess of the authorized time.
Days beyond the specified completion date for which Liquidated Damages will be
charged will be working days that the contractor does, or could have worked, from
Monday through Saturday. Sundays will be counted only if work is performed. Partial
working days will be considered as a full working day. Days not chargeable for
Liquidated Damages will include rain days, Sunday if no work is done, and legal
holidays.
Working days will cease to be charged when only punch list items remain to be
completed. Punch list items do not include contract bid items or approved change/extra
work orders.
NOTICE OF HEARING CONTRACT NO. 892 -ADDENDUM NO. 1 Page 4 of 5
When the Contractor believes the project to be substantially completed, a written notice
stating the same shall be submitted to the Engineer and a request made for a Punch
List. If the work under the Contract extends beyond the normal construction season for
such work the Contractor shall submit to the Engineer in writing a request that working
days counted toward the project be suspended until work is resumed the following
construction season.
This amount is not construed as a penalty. These damages are for the cost to the City
of providing the required additional inspection, engineering and contract administration.
PRE-CONSTRUCTION CONFERENCE
Before the work is commenced on this contract, a conference shall be held for the
purpose of discussing the contract. The conference shall be attended by the prime
contractor, subcontractors and City Officials.
RESIDENT BIDDER/NON-RESIDENT BIDDER
Attention of bidders is called to compliance with the provisions of the Resident
Bidder/Non-Resident Bidder requirements.
Each bidder submitting a bid shall execute and include with the bid, a Resident Bidder
Certification or a Non-Resident Bidder Certification in the form(s) herein provided.
SALES TAX EXEMPTION CERTIFICATES
Contractors and approved subcontractors will be provided a Sales Tax Exemption
Certification to purchase building materials or supplies in the performance of
construction contracts let by the City of Waterloo.
Published pursuant to the provisions of Chapter 26 of the City Code of Iowa and upon
order to the City Council of said Waterloo, Iowa, on the e)4/' day of
sce lce/ 2015.
CITY OF WATERLOO, IOWA
BY:
`Suzy Shares
City Clerk
NOTICE OF HEARING CONTRACT NO..892—ADDENDUM NO. 1 Page 5 of 5