Loading...
HomeMy WebLinkAboutCouncil Packet - 3/21/2011BUILDING & GROUNDS COMMITTEE March 21, 2011 4:40 p.m. Council Chambers Roll Ca11: Members: Chairperson Harold Getty Ron Welper Bob Greenwood Approval of Agenda, as proposed. NEW BUSINESS 1. Approval of bid from Service Roofing in the amount of $21,543.00 to install a new fully adhered 60-mill EPDM rubber roof system on the Police Training Building located at 348 N. Elk Run Road and an additional amount of $800.00 for Waterloo Building Maintenance to remove the rooftop units — Submitted by Craig Clark, Building Official/Maintenance Administrator. ADJOURNMENT Suzy Schares City Clerk CITY OF WATERLOO Committee Communication Building & Grounds Committee Meeting: March 21. 2011 Prepared: March 16. 2011 Dept. Head Signature: # of Attachments: 4 SUBJECT: New Roof on Police Training Building Submitted by: Craig Clark, Building Official/Maint. Admin. Recommended City Council Action: Approve Service Roofing to install a new fully adhered 60- mill EPDM rubber roof system on Police Training Building at 348 N. Elk Run Road, Waterloo. Summary Statement The roof at this location has been leaking for a number of years and needs to be replaced to avoid further damage to the interior of the building. Expenditure Required $22,343.00 Source of Funds 410-22-8800-2152 Policy Issue Alternative Background Information: Bid from Service Roofing is 21,543.00 and $800 additional for crane rental for Waterloo Maintenance to remove rooftop units. "EXPERIENCE MATTERS" 123 Arizona Street ERVICE Po Box 818 Waterloo, Iowa 50704 Phone: 319.232.4535 OOFING CO. Fax: 319.234.7728 Website: www.serviceroofang.net Since 1936 February 24, 2011 City of Waterloo Attn: Craig Clark 715 Mulberry Street Waterloo, IA 50703 RE: City of Waterloo Gun Range Building SERVICE ROOFING COMPANY, hereafter called the "contractor" proposes to furnish material and labor necessary to install, construct, and place the improvements described herein on the Gun Range building located in Waterloo, Iowa. • Purchase a building permit from the city of Waterloo. • Tear -off and dispose of the existing roof. • City to disconnect and remove the abandon HVAC units on the roof. • Any deteriorated roof deck encountered will be replaced as an addition to the contract price. • Install a layer of Y." primed Dens Deck over the roof deck. • Install a fully adhered 60-mil EPDM rubber roof system. • Install new perimeter edge metal. • We will issue a two-year Midwest Roofing Contractor Workmanship warranty and a fifteen -year Firestone Red Shield warranty upon completion. Service Roofing Company proposes to complete this work for the sum of: JS21,543.001 Twentv-one thousand five hundred fortv-three and 00/100 dollars plus any roof deck replacement needed This agreement shall become binding only upon contractor's written acceptance hereof or upon the contractors commencing performance and upon such acceptance or commencement of performance. This shall constitute the entire contract and be binding upon the parties hereto, there being no covenants, promises, or agreements written or oral except as herein set forth. It is further understood that: The contractor shall not be responsible for damage or delay due to strikes, fires, accidents, or others causes beyond his reason- able control. This proposal is limited to 30 days acceptance from date hereof. The purchaser is dealing with the contractor as principal and that the contractor is not acting hereunder as the agent or representative of any person, firm or corporation. Invoice due upon receipt. 1 Y:%interest per month will be charged after 30 days. Contractor reserves the right to invoice monthly or when the materials are ordered for the project. Please sign and retgrn one copy. Date Accepted: Andy Miller, President MEMBERS OF: National Roofing Contractors Association Midwest Roofing Contractors Association Iowa Roofing Contractors Association (Certified Contractor) Miler CERTIFIED RCOO�FI WATERLOO BUILDING MAINTENANCE A DIVISION OF RESTORATION SERVICES, INC. 1722 COMMERCIAL STREET, WATERLOO, IOWA 50702 (319)232-7079 March 4, 2011 City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 ATTN: CRAIG CLARK Below is the specification we will follow to install a new roof system on the Gun Range Building. 1. Obtain necessary building permit. 2. Tear off and properly dispose of existing roof system. 3. Disconnect and removal of abandoned HVAC units by owner. 4. Inspect roof substrate and repair any deteriorated areas on a time and materials basis. Cost to be an add to the stated price. 5. Install %" primed Dens Deck cover board over roof deck. 6. Install fully adhered 60 mil EPDM roof system. 7. Install new pre -finished metal roof edge. 8. Thoroughly clean area upon completion. 9. Issue 2 year workmanship warranty upon final completion. PRICE: Thank you, Jonathan W. Barz Project Manager $24,130.00 plus item No. 4 as necessary MID -WEST ROOFING COMPANY 225 18'° Street South East Mason City, Iowa 50401 (ph) 641-424-4114 (fax) 641-424-4116 vA rovw�'. n�id»estroutinuompanvxem mwroof wntchsi.com Subject: Low sloped roof installation Waterloo Gun Range Building Roof Replacement Waterloo, IA Date March 01, 2011 City of Waterloo, C/O Craig Clark: We propose to furnish labor and materials required to properly apply Fully Adhered Roofing in strict accordance with Firestone Systems Specifications to the roof deck on the above -mentioned building. Scope of Work: 1) Remove the existing roofing and properly recycle and/or dispose of as required. 2) Install new '/" Dens Deck Prime cover board mechanically attached to the roof deck using Firestone Fasteners and 3" insulation plates. Fastening rate is recommended at the rate of 1 faster for 2 sq. ft. for proper wind uplift. 3) Install new Firestone 60-mil membrane roofing fully adhered to the insulation cover board using Firestone bonding adhesive at the manufactures required application rate of 1 gal. per 50 sq. it. All membrane and base wall flashings to be fully bonded to the substrate. 4) Properly flash existing roof top penetrations removing unused projections as directed. HVAC to be disconnected as required by others. 5) Fabricate and install new Firestone 24-gauge pre -finished coping metal flashings to properly terminate the new membrane at the parapet walls. 6) Furnish the contractors 15-year warranty on defects in materials and workmanship. For the total sum of $26.850.00 NOTE 1: We do not include the cost associated for furnishing, replacing or repairing any of the following. If required this will be an extra to the contract, Replacement or repair of existing rotten or deteriorated wooden edge blocking, roof insulation or roof decking if discovered during the roof replacement process Repair of any rotten or deteriorated brick, block or masonry wall if discovered. HVAC or mechanical unit disconnection's, including plumbing, electrical or gas services. Pg. 1 of 2 MID -WEST ROOFING COMPANY 225 18th Street South East Mason City, Iowa 50401 (ph) 641-424-4114 (fax) 641-424-4116 w»vv.to Isestroofingcompanv.com ntwroof"aimehsi.com Respectfully Submitted; Mid -West Roofing Company Accepted Scott AwGiersow Date Scott Anderson - Vice President (Proposal valid for 30 days. Please sign, date and return an acceptable proposal, approve any alternates if applicable)