Loading...
HomeMy WebLinkAboutMunicipal Pipe and Tool - CO #3 -CIP Pipelining Phase IIIC, Cont No. 962 - 5/18/2020COM May 8, 2020 Mr. Matt Hosford Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: FY 2019 CIP Pipelining Phase IIIC Change Order No. 3 City of Waterloo, Iowa City Contract No. 962 AECOM #60504645 AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Dear Mr. Hosford: Attached is Change Order No. 3 for the FY 2019 CIP Pipelining Phase IIIC project. The purpose of this change order is to reconcile the final quantities. 319-232-6531 tel 319-232-0271 fax AECOM has reviewed the work described in this change order. We recommend that the City of Waterloo approve Change Order No. 3 for the project deduct of $20,451.35. This change order is an overall contract deduction of -6.18% and adjusts the contract to the amount of $353,940.40. Yours sincerely, Christopher G. Oelkers, P.E Enclosure: Change Order No. 3 Tabulation and Signature Form P:\60604454\600_Construction_Support\04-PH IIIC\670_Change-Orders\CO NO 31Wat CIPP PH IIIC - Change Order No 3 LTR.docx CHANGE ORDER NO. 3 Owner City of Waterloo Project FY 2019 CIP PIPELINING PHASE IIIC Date: May 8, 2020 Owner's Contract No. 949 Date of Contact Start February 11, 2019 Contractor: Lodge Construction, Inc. Contract Amount: $ 377,252.75 You are directed to make the following changes in the Contract Documents. Description: 3-1 Bid Item 1 - 8" Diameter CIP Pipe Lining $ 366.95 3-2 Bid Item 2 - 10" Diameter CIP Pipe Lining $ 6.75 3-3 Bid Item 3 - 12" Diameter CIP Pipe Lining $ (61.05) 3-4 Bid Item 5 - Pipe Televising - 8" $ 17.90 Bid Item 6 - Pipe Televising - 10" $ 0.30 3-5 3-6 Bid Item 7 - Pipe Televising - 12" $ (2.20) 3-7 Bid Item 9 - Pipe Cleaning - 8" $ 22.38 3-8 Bid Item 10 - Pipe Cleaning - 10" $ 0.38 3-9 Bid Item 11 - Pipe Cleaning - 12" $ (2.75) 3-10 Bid Item 16 - 3-FT Lateral Grouting $ (20,800.00) TOTAL $ (20,451.35) DEDUCTION Reason for Change Order 3-1 - 3-10 Final Quantity Reconciliation CONTRACT PRICE Original: Previous C.O.s (ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: $ 377,252.75 $ (2,861.00) $ (20,451.35) Original Completion Date: Revised Completion Date: CONTRACT TIME To Substantial To Final Completion Completion 9/27/2019 9/27/2019 5/8/2020 5/8/2020 $ 353,940.40 -6.18% Total Change Order Percentage It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: Owner (Authorized Signature) ACCEPTED: BY : aAa^ boa-cs Date May 8, 2020 Contractor (Authorized Signature) Date ACCEPTED: BY: AECOM May 8, 2020 Date Z :CHRISTOPHER G.. C) W OEI.KERS Z l v 22053 • /4r 11 140 hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the state of Iowa. My license renewal date is December 31, 2019. CHRISTOPHER G. OELKERS, PE License No. 22053 Pages or sheets covered by this seal: Date ALL PAGES AECOM 60604454 3 Project No. C.O. No.