Loading...
HomeMy WebLinkAboutAECOM-WRH, Inc. - Wet Well Rehab Cont No. 907 - 4/1/2019Please return this copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com March 19, 2019 Mr. Steve Hoambrecker Waste Management Services 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Change Order No. 2 Satellite Wet Well Rehabilitation Waterloo, Iowa City Contract No. 907 AECOM #60488465 Dear Mr. Hoambrecker: 319-232-6531 tel 319-232-0271 fax Enclosed please find Change Order No. 2 for the above -referenced project. This change order is in regard to the discovery of an existing rubberized liner on the interior of the Digester Wet Well. The existing liner needed to be removed for the Contractor to complete the concrete surface restoration on the Digester Wet Well walls as part of the project. This work required an additional 36.5 labor hours to complete. It is recommended to move forward with this Change Order No. 2 in the amount of $4,104.00. If you have any questions or need additional information, please let us know. Thank you. Yours sincerely, Ross A. Hillsman, PE Enclosure: As Noted c: Boomerang Corporation P:\60488465\600_Construction_Support\620_Correspondence12019.3-19 Trnsmtl to SH for Waterloo Satellite - CO #2.docx CHAN J F ORDER NO. 2 Owner City of Waterloo Date: March 19, 2019 Project: Satellite Wet Well Rehabilitation Owner's Contract No.: 907 Contractor: WRH, Inc. Date of Contract Start: $ Original Contract: $1,839,380.00 You are directed to make the following changes in the Contract Documents. Description: Remove existing coating discovered during concrete surface preparation activities for the Digester Wet Well. An additional 36.5 labor hours was needed to complete the work. NET ADD $4,1 04.00 Reason for Change Order: During surface preparation activities on the Digester Wet Well, an existing rubberized coating was discovered on the walls that required additional labor to remove. It took the Contractor's subcontractor (Spectrum) an additional 36.5 labor hours to remove the coating to sound concrete. This was required prior to the new coatings being applied to the surfaces as part of the wet well rehabilitation. CONTRACT PRICE Original: $ 1,839,380.00 Original: Previous C.O.s (ADD/DEDUCT): $ 38,000.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DEDUCT): $ 4,104.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,881,484.00 REVISED: Original Completion Date: Revised Completion Date: CONTRACT TIMES (Calendar Days) To Substantial To Final Completion Completion October 1, 2019 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED: By: -Ca City of Waterloo (Authorized Signature) ACCEPTED: By: WRH, Inc. (Authorized Signature) March 19, 2019 " // `Zd ! 1 Date: March 19, 2019 Date: 60488465 Project No. Page 1 of 1 AECOM 1 Change Order No. P:\60488465\600_Construction_Support\670_Change-Orders\2019-3-19 CO#2 - Satellite Wet Well - WRH.doc