HomeMy WebLinkAboutTerracon Consultants, Inc. - Supplemental Agmnt to PSA - 5/4/2020lierracon
April 30, 2020
Waste Management Services
City of Waterloo
3505 Easton Ave
Waterloo, IA 50702
Attn: Mr. Brian Bowman
P: (319) 291-4553
E: brian.bowman@waterloo-la-org
Re: Proposal for Construction Observation and Materials Testing Services
Waterloo WWTP Biosolids Modifications
Waterloo, Iowa
Terracon Proposal No. P13191008R
Dear Mr. Bowman:
As requested, Terracon Consultants, Inc. (Terracon) is submitting this proposal for completion of
construction observation and materials testing services for the Waterloo WWTP Biosolids
Modifications project. This proposal outlines our understanding of the project and scope of
services, provides a fee schedule and estimated cost for our services, and presents our
Agreement for Services.
Terracon provided geotechnical engineering services for the project in 2019 (Terracon
Project No. 13195025). As such, we believe our experience, work on the project as the
Geotechnical Engineer, and commitment to responsive quality service will continue to make
Terracon a valuable asset to the project.
1.0 PROJECT INFORMATION
Project information available for review at the time of this proposal includes:
- Civil, structural and architectural plans dated 12-16-2019
- Project specifications dated 12-16-2019
- Email with revised scope of services dated 4-29-20
We understand the project consists of:
This project is an upgrade to the biosolids processes at the City of Waterloo Wastewater
Treatment Plant. This Work includes construction of a new centrate equalization tank,
Terracon Consultants, Inc. 3105 Capital Way, Suite 5 Cedar Falls.. lA 50613
P 1319] 277 4016 F [319] 277 4321 terracon.com
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, Iowa
April 30, 2020 ^ Terracon Proposal No. P13201008R
1Ferracan
construction of new biosolids truck loading bays, and a construction of a new chemical
storage building along with other plant modifications.
The structural framing will be comprised of:
Steel columns, beams, joists and/or trusses
- Metal deck and roof
- Structural masonry walls
- Reinforced concrete
- Precast structural concrete
Also included as part of the construction will be
Underground utilities
- Asphalt drives and parking lots
Site grading fill placement
- Cast in -place concrete retaining walls
2.0 SCOPE OF SERVICES
2.1 Field and Laboratory Services
Terracon will provide appropriately trained employees equipped to respond to the materials
testing and construction observation needs of this project as scheduled by the Client or your
designated representative. Based on our review of the information provided above, we
understand the scope of the on -call services includes:
Earthwork observation and testing:
Site preparation
- Site grading fill placement
- Foundation wall backfill
- Utility trench backfill
Floor slab and pavement subgrade preparation
Laboratory soil/aggregate testing
- Standard Proctors
- Atterberg Limits
- Aggregate gradations
Shallow foundation bearing soil observation and testing
Responsive Resourceful Reliable 2
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, Iowa
April 30, 2020 = Terracon Proposal No. P13201008R
lrerracon
- Foundation soil conditions will be compared to information contained in the geotechnical
report for this project to determine if suitable bearing conditions exist
If authorizes, structural steel observation of field -made connections
- Review welder certifications
- Perform periodic visual observations of structural welded connections including primary
framing members
• Observations of ancillary framing such as for rooftop units, curtain walls, brick ledges
and cold -formed light gauge steel framing is not a part of this scope.
- Visual observation of bolted connections
• We assume bolted connections will either be snug -tight or tension control bolts will
be utilized if full pre -tensioning is required. Observations of other methods of pre -
tensioning can be performed, but may require additional time and cost.
Structural masonry testing
- Material sampling
• Measure grout flow/slump and temperature and cast 3" x 6" grout prisms. For
estimating purposes, we assume that cardboard grout sample boxes will be allowed
due to the low cost and convenience. However, they are not recognized as an
approved mold by ASTM. If the client wishes grout prisms to be formed in general
accordance with ASTM C1019, we will need access to forming materials and a
protected space onsite to make the samples, and additional costs will apply.
• Sample mortar and cast 2" x 4" cylinders.
- Laboratory testing
• Compressive strength of grout
It should be noted, Helical Pier observation has not been requested for this project but can be
provided upon request at additional cost.
Project Management
- Attendance at pre -construction and project meetings at Client's request
Technical consulting at Client's request
Supervision of laboratory and field services
- Preparation and review of project reports and invoices
If we have misunderstood any aspect of the proposed project, please advise us at once so we
can evaluate the scope of services and make any necessary adjustments prior to finalizing the
contract. Once the project is underway, you can request additional services. We will confirm your
request by sending you a short supplemental agreement form that states the additional services,
making them part of the original agreement
Responsive Resourceful Reliable 3
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, Iowa
April 30, 2020 Terracon Proposal No. P13201008R
2.2 Scheduling
1 rerracon
Terracon's services will be performed on an as -requested basis with scheduling by the Client or
the client's designated representative. Terracon will not be responsible for scheduling our
services and will not be responsible for tests or observations that are not performed due to failure
to schedule our services on the project. Since our personnel will not be at the site on a resident
basis, it will be imperative that we be advised when work is in progress. Services should be
scheduled a minimum of 24 hours in advance. Scheduling personnel will be on an as -available
basis which may require changes in personnel assigned to the project. For instances of short -
notice requests, personnel may have to be utilized which have a higher rate than those normally
assigned and this higher cost may be passed on to the client.
All requests for services should be submitted to the Cedar Falls, Iowa office at the following phone
number: (319) 277-4016. Services should not be scheduled through our field personnel.
We recommend the scope of work described in this proposal be provided to the person(s)
responsible for scheduling our services so they are aware of the services that are proposed.
2.3 Data Collection and Reporting
All field technicians are responsible to provide a daily report identifying what work was found to
be in compliance with the project specifications and drawings and report any non -conformances.
The field technicians are required to immediately communicate any non -conformances to the site
superintendent and our Project Manager. Effective and timely communication is essential for
non -conforming items. Our Project Manager will be responsible for reviewing each technician's
reports, keeping non-conformance lists up-to-date, and communicating test results in a timely
manner.
To ensure our project manager and field personnel meet the goals we have set for report
turnaround, we have developed report tracking software to evaluate the status of any test result
or report within our system. This allows us to achieve better communication, more consistency,
and faster turnaround of reporting on the project. Data, observations, and other testing and
inspection information are easily entered into the system and reports are auto -generated allowing
for immediate availability of test results.
Terracon will maintain non-conformance logs and lists for all testing types performed by us. The
list will be maintained electronically in our database and can be updated and e-mailed or printed
at any time.
Responsive > Resourceful Reliable 4
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, lowa
April 30, 2020 Terracon Proposal No. P13201008R
1[erracon
2.3.1 CMELMSTM' Management System
In order to provide our clients with real-time field and laboratory data management and reporting,
Terracon developed and maintains an automated application that we call CMELMS. The acronym
stands for Construction Materials Engineering Laboratory Management System and is
utilized by construction materials engineering and testing operations in our offices.
CMELMS is a complete and comprehensive field and laboratory testing data and results
management system. The application can manage an unlimited number of reports and data for
ease of reporting and documentation purposes. Features in the application include accessing
and distributing test results and field observation reports by a push of a button.
CMELMS automates the delivery of our testing and inspection information and can be used
anywhere with an Internet connection or through a wireless device. Data (test results and
inspections) can be entered into the application right from the project site so that project managers
and engineering staff have real-time access to the field data. Final Client Reports are produced
in the same application, which allows us to achieve better communication, more consistency, and
faster turnaround of reports on the project.
2.3.2 Report Turnaround Time
Our Project Managers and/or field technicians will report failing tests or non-conformance items
immediately to the designated parties and will typically have digitally -signed reports distributed by
the end of the next business day. As stated, using our CMELMS software and our field reporting
and communication services and capabilities, the test results and inspection information is quickly
entered into the system and a report produced, Non -deviation reports will typically be digitally
signed and distributed within 5 business days of service. Laboratory test reports will typically be
digitally signed and distributed within 2 business days of the completion of each test. Our reports
can be sent digitally via email, posted to our Client Document Website (CDW), or posted to a
designated ftp website.
2.4 Terracon's Incident and Injury -Free Culture
Employee safety is a core value of Terracon and we are committed to an Incident and Injury -Free
(IIF) workplace. It is our personal and organizational commitment at all levels of the company to
everyone going home safe to their family every day. All employees are expected to perform their
job assignments with safety as a primary objective. Terracon dedicates the time, resources, and
equipment necessary for an IIF environment and no employee will be required to work in unsafe
conditions.
Site Access and Safety. Client shall secure all necessary site related approvals, permits,
licenses, and consents necessary to commence and complete the Services and will execute any
Responsive Resourceful Reliable 5
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, Iowa
April 30, 2020 . Terracon Proposal No. P13201008R
lferracon
necessary site access agreement. Consultant will be responsible for supervision and site safety
measures for its own employees, but shall not be responsible for the supervision or health and
safety precautions for any third parties, including Client's contractors, subcontractors, or other
parties present at the site. In addition, Consultant retains the right to stop work without penalty at
any time Consultant believes it is in the best interests of Consultant's employees or
subcontractors to do so in order to reduce the risk of exposure to the coronavirus. Client agrees
it will respond quickly to all requests for information made by Consultant related to Consultant's
pre -task planning and risk assessment processes. Client acknowledges its responsibility for
notifying Consultant of any circumstances that present a risk of exposure to the coronavirus or
individuals who have tested positive for COVID-19 or are self -quarantining due to exhibiting
symptoms associated with the coronavirus.
3.0 COMPENSATION
Fees for services provided will be based on the attached Unit Rate Schedule. These rates will
apply for the duration of the project.
Based on our review of the above -referenced information, our estimated cost to perform the
proposed scope of services is $20,189.00. A breakdown of our cost is provided in the attached
Cost Estimate. For the purposes of developing this estimate, the quantities were estimated based
on typical means and methods utilized by contractors/subcontractors in this area.
It should be noted the Client would be billed only for the amount of service provided, i.e. Terracon
will not bill for the total budget if the total booked is less than the budget. Please note this is only
a budget estimate and not a not -to -exceed price. Many factors, including those out of our control,
such as weather and the contractor's schedule, responses to requests for information, and how
often we are called to the site, will dictate the final fee for our services. Furthermore, all costs
associated with deviations, re -testing and re -inspections of failing items, on -site standby time,
overtime, and short notice premiums are not included in our estimated cost.
Responsive Resourceful Reliable 6
Proposal for Construction Observation & Materials Testing Services
Waterloo Treatment Plant Biosolids Modifications Waterloo, Iowa
April 30, 2020 Terracon Proposal No. P13201008R
4.0 AUTHORIZATION
1 Terracon
This proposal may be accepted by executing the attached Agreement for Services and returning
it along with this proposal to Terracon. We reserve the right to withhold our reports until the
signed Agreement has been received by Terracon. This Agreement, including the limitations
it contains, shall constitute the exclusive terms, conditions and services to be performed for this
project. This proposal is valid only if authorized within sixty days from the listed proposal date.
We appreciate the opportunity to provide this proposal and look forward to working with you on
this project. Please call the undersigned if you have any questions or would like to review this
proposal.
Sincerely,
Terracon Consultants, Inc.
r ,n
Wade ammers e` ey ick Loc
Project Manager Principal
Copies to:
Attachments:
Addressee (1 pdf)
Sam Hocevar (1 pdf)
Unit Rate Schedule
Cost Estimate
Supplement to Agreement
Responsive Resourceful Reliable 7
Proposal for Materials Testing and Construction Observation Services
Waterloo WWTP Biosolids Modifications Waterloo, Iowa
April 30, 2020 Terracon Proposal No. P13201008R
Unit Rate Schedule
Rate Unit
PERSONNEL
Administrative Services
Field Technician
Senior Field Technician
Structural Steel Technician
Field Manager
Project Manager
Senior Project Manager
Senior Project Engineer
$65.00 hour
$48.00 hour*
$63.00 hour*
$100.00 hour*
$89.00 hour
$98.00 hour
$118.00 hour
$128.00 hour
LABORATORY TESTING
Standard Proctor (4-inch mold)
Standard Proctor (6-inch mold)
Relative Density
Atterberg Limits (multipoint)
Moisture Determination (oven method)
Sieve Analysis (washed)
Sieve Analysis (unwashed)
#200 Wash
Organic Content Determination
Compressive Strength of Concrete Cylinder (made by Terracon)
Compressive Strength of Concrete Cylinder (made by others)
Flexural Strength of Concrete Beam (includes mold and cleaning charge)
Trimming or Capping of Irregular Surfaces
Compressive Strength of Grout
FIELD EQUIPMENT/MATERIALS
Torque Wrench
Nuclear Density Gauge
Weather Protection (concrete cure box)
Consumables
Safety Equipment (harness, lanyard, etc.)
$120.00 each
$150.00 each
$260.00 each
$125.00 each
$8.00 each
$130.00 each
$65.00 each
$45.00 each
$45.00 each
$13.50 each
$18.00 each
$50.00 each
$8.00 each
$20.00 each
$40.00 day
$30.00 day
$10.00 day
Cost + 15%
$10.00 day
TRIP CHARGE
Trip Charge (Cost inludes vehicle and milage)
$20.00 trip
*Overtime is defined as all hours in excess of eight (8) per day, outside of the normal hours of
7:OOAM to 5:OOPM Monday through Friday, and all hours worked on Saturdays, Sundays. and
holidays. Overtime rates will be 1.5 times the hourly rate quoted (2 times the hourly rate for Sundays
and holidays).
A one -hour minimum charge per task is applicable to all site visits.
You will be invoiced on a periodic basis for services actually performed as authorized or requested
by you or your designated representative.
Responsive Resourceful Reliable
Proposal for Materials Testing and Construction Observation Services
Waterloo WWTP Biosolids Modifications Waterloo, Iowa
April 30, 2020 Terracon Proposal No. P13201008R
COST ESTIMATE
Service Type
l Ferracon
No. of Hr(s)./
Services service Rate Unit Cost
EARTHWORK OBSERVATION AND TESTING
Field Technician
Site Grading Fill Placement
Foundation Wall Backfill Placement
Utility Trench Backfill Placement
Pavement & Floor Slab Subgrade Preparation
Senior Field Technician
Subgrade Observation/Proofroll
Trip Charge*
Technician
Field Equipment
Nuclear Density Gauge
30 2.00 $48.00 hour $2,880.00
15 2.00 $48.00 hour $1,440.00
15 2.00 $48.00 hour $1,440.00
6 2.00 $48.00 hour $576.00
6 2.00 $63.00 hour $756.00
72 $20.00 visit $1,440.00
66 $30.00 day $1,980.00
Subtotal = $10,512.00
LABORATORY SOIL 1 AGGREGATE TESTING
Standard Proctor (4-inch mold)
Standard Proctor (6-inch mold)
Atterberg Limits (multipoint)
Sieve Analysis (washed)
3
1
1
1
$120.00 each
$150.00 each
$125.00 each
$130.00 each
$360.00
$150.00
$125.00
$130.00
Subtotal = $765.00
FOUNDATION EXCAVATION OBSERVATION AND TESTING
Senior Field Technician
Observation & Testing of Footing Excavations
Trip Charge`
Technician
6 2.00 $63.00 hour $756.00
6
$20.00 visit $120.00
Subtotal = $876.00
STRUCTURAL STEEL OBSERVATION
Structural Steel Technician
Visual Observation of Welded Connections
Visual Observation and/or Testing of Bolted
Trip Charge*
Technician
Safety Equipment (harness. lanyard, etc.)
Responsive Resourceful Reliable
3 3.00 $100.00 hour $900.00
3 3.00 $100.00 hour $900.00
6 $20.00 visit $120.00
6 $10.00 day $60.00
Subtotal = $1,980.00
Proposal for Materials Testing and Construction Observation Services
Waterloo WWTP Biosolids Modifications Waterloo, Iowa
April 30, 2020 Terracon Proposal No. P13201008R
Service Type
COST ESTIMATE
No. of Hr(s)./
Services service Rate Unit Cost
n
STRUCTURAL MASONRY TESTING
Estimated quantities are based on the following: Obtain samples as needed, one set of four grout samples to
be obtained. One set of samples for each 5,000 square feet of wall.
Senior Field Technician
Sample Preparation
Sample Pickup/Login
Trip Charge*
Technician
Laboratory Testing
Compressive Strength of Grout
10 1.50 $63.00 hour $945.00
10 1.50 $48.00 hour $720.00
20 $20.00 visit $400.00
40 $20.00 each $800.00
Subtotal = $2,865.00
PROJECT MANAGEMENT
Project Administration
Administrative Services
Project Manager
Senior Project Manager
Senior Project Engineer
15 $65.00 hour $975.00
20 $98.00 hour $1,960.00
1 $128.00 hour $128.00
1 $128.00 hour $128.00
Subtotal = $3,191.00
ESTIMATED OBSERVATION AND TESTING FEE
ESTIMATED TOTAL = $20,189.00
'We anticipate providing multiple services during some trips; therefore, the quantity of services estimated may
not equal the quantity of trips estimated.
It should be noted the client is billed only for the amount of service provided, i.e. Terracon will not bill for the
total Cost Estimate if the total booked is less than the estimate. The number of tests, trips, and hours on -site
are primarily controlled by the contractor's schedule. We recommend the contractor review our estimated
number of tests, trips, and duration of on -site time to determine if our estimate is compatible with their
production. The estimated cost can then be revised if necessary.
Responsive Resourceful Reliable
lferracon
Reference Number: P13201008
SUPPLEMENT TO AGREEMENT FOR SERVICES
CHANGE TO
SCOPE OF SERVICES AND FEES
This SUPPLEMENT to AGREEMENT FOR SERVICES to the original Agreement for Services (original Agreement dated 03/18/2019, Agreement
reference number 13195025) is between City of Waterloo IA ("Client") and Terracon Consultants, Inc. ("Consultant") for additional or changed Services to be
provided by Consultant for Client on the Project, as described in the Agreement for Services. This Supplement is incorporated into and part of the
Agreement for Services.
1. Scope of Services. The scope of the additional or changed Services are described in the Scope of Services section of the Consultant's
Supplemental Proposal, unless Services are otherwise described below or in Exhibit B to this Supplement (which section or exhibit are incorporated
into the Supplement).
See rvised proposal dated 4-30-2020
2. Compensation. Client shall pay compensation for the additional or changed Services performed at the fees stated in the Supplemental Proposal
unless fees are otherwise stated below or in Exhibit C to this Supplement (which section or exhibit are incorporated into the Supplement).
See revised cost estimate dated 4-30-2020
All terms and conditions of the Agreement for Services shall continue in full force and effect. This Supplement is accepted and Consultant is
authorized to proceed.
Consultant T con nsttf nts, 1 Client: City of Waterloo IA
By: i , • . -: 5/18/2020 By: rY- Date: ,-Y! 2p
Name/Title: c rd rt / • ce Manager 11 Name/Title: Quentin Hart / Mayor
Address: 3105 Capital Way, Ste 5 Address: 715 Mulberry St
Cedar Falls, IA 50613-7030 Waterloo, IA 50703-5714
Phone: (319) 277-4016 Fax: (319) 277-4320 Phone: (319) 291.4301 Fax:
Email: Rick-Lockharteterracon.com Email: MayorlWATERLOO.IA.org
Page 1 of 1 Rev. 8-12