HomeMy WebLinkAboutBoulder Contracting - FY2020 Rip Rap Cont. No.999 Final_Qty_Summary - 6.22.2020CITY OF WATERLOO. IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2020 RIP SAP REPAIRS ALONG LEVEE SYSTEM CONTRACT NO. 999 Date Prepared: June 9, 202Q AMOUNT:. $24.56 DECREASE TO: BOULDER CONTRACTING LLB ,contractor You are hereby ordered to perform the following extra work on your contract dated December 2, 2019. A. Description of extra work to be done: Adjust original construction quantifies to actual construction quantities. B. Reason for ordering extra work: As -built quantities varied for some bid items G. Settlement for cost of extra work to be made as follows: Compensation already made to contractor through bid items. See attached summary_ BY_ Quentin Mayor ATTEST: Kellee/c/ile 6/22/2020 TOTAL DECREASE $246.56 ftQULDERCONTRACTINI LLC Date CONTRACTOR 6/22/2020 City Clerk Date TITLE: Pfeerfa itiAvvitgag APPROVED: eft er-P City Engineer Final Quantity Adjustment Cont #999 Sheet 1 of 2 FY 0 0 RlP VIP REPAIRS ALONG LEVEE SYSTEM FINAL CONTRACT NO. 999 ITEM BI I E I I TI 1 DESCRIPTION UNITORIGINAL BO FII L DIFFERENCE QUANTITY BOULDER UNIT PRICE BOULDER PRICE EXTENDED UNIT INCREASE DECREASE 1 MOBILIZATION LS 1 1.0 0.0 7,500.00 7,500.00 CLASS D REVETMENT T TN 3 329.0 226.83 38.00 $ 1261502.00 8,581.54 SUDAS -10 -E- _ RECP TYPE 2 MATTING F 21085.0 0 .00 - 0.00 0.7 $ 1,563.75 (45.00) SUDAS TRAFFIC CONTROL. LS .00 0.00 750.00 753.00 - 1001 9040-108-J-0 CLASS D F RIVER ROAD TN1 100.08 - . 7 45.00 4 500.00 (417.15) 1 ■ -69.56 . 03 12 600.00 (4,382.28) 1003 8 11.90 50.00 1,000.00 595.00 0 8 - A- BEND TN 150.0 -86.39 53.00 S 7,950.00 $ (4,578.67) 1005 UD i 1.0 0.00 750.00 S 750.00 - 100 u • : CIO BILI TIO - E TH IJ ELS 1.0 1.0 0.00 750.00 750.00 S - 1007 SUDAS 11020-108-A-0 OBILI TIO - PED P TH1LS 1.0 1.0 0.00 250.00 0.00 S - 1008 LS 1.0 '[ . 0.00 750.00 5 7 0_00 - 100 i TF FFIE 1TI L RIVEF ILS 1.01.0.00 $ 800,00 S 300.00 1010 ` TF FFIE 1TI L - TH I ELS 1.01.00,0CF $ 300.00 800.D0 - 1011 i TF FFI 1TI L-PED I TH fLS 1.01.Q0,00 $ 100.00 100.00 S - 1012 SUDAS 8030-108-A TRAFFIC CONTROL - CEDAR BEND LS 1.0 1.0 0.00 $ 200.00 200.00 S - TOTAL 165,76 .75 (246.56) #999 PAY ESTIMATES.xlsx FINAL TOTAL PAY ESTIMATE #1 94 341.17 PAY ESTIMATE 42 I 59,0 8.DO PAY ESTIMATE #3 ,224_06 RET I NA E 8,275.96 TOTAL PAYMENTS 165,519.19 CHANGE ORDER #1 CHANGE ORDER TOTAL ORDER TOTAL 291450.00 29,450.00 136 15.75 ORIGINAL CONTRACT AMOUNT CHANGE ORDER TOTAL 9 450.00 165/765.75 REVISED CONTRACT AMOUNT FINAL QUANTITY SUMMARY (46 6) FINAL CONTRACT AMOUNT 16S#51 .19 6/9/2020 SHEET 2 OF 2