HomeMy WebLinkAboutFY20 Wastewater Treatment DIgester #3, Cont No. 1021 *** Proof of Publication ***
Courier Communications NOTICE OF PUBLIC HEARING
ON PROPOSED PLANS, SPECIFICA-
100 East 4th Street, Waterloo, Iowa 50703 TIONS, FORM OF CONTRACT AND
ESTIMATE OF COST FOR THE F.Y.
Black Hawk County 2020 PLANT ASTE A ENO.TB TREATMENT
COVER
MODIFICATIONS, IN THE CITY OF
WATERLOO, IOWA, CITY CONTRACT
NO,1021.
RECEIVING OF BIDS
Sealed proposals will be received by the
hero
iry Clerk of the City of Watedoo,Iowa,at
I do solemnly swear that the annexed copy of notice was published in her otiioe in the City Hall of the said Cr
on the 14th day of 2020,until 1 P tvi.
May
the WATERLOO/CEDAR FALLS COURIER, a daily newspaper for the construction of the F.V. 2020
printed in WATERLOO, Black Hawk County, Iowa, and that the 3 Wastewater
nte ateTreatment
Tre t Modifications, Contract No.
annexed rate of advertising is the regular legal rate of said 1021 as described in detail in theplans
and specifications now on file in the Office
newspaper, and that the following is a correct bill for publishing said at the OPENING ler
OF BIDS
notice. All proposals received will be opened in
the Harold E.Getty Council Chambers at
City Hall,in the City of Waterloo,Iowa,on
the 14th day of May 2020,at 1 P.M.,and
Waterloo, City of- Legals the proposals will be acted upon at such
later time and place as may then be fixed
by the City Council.
PUBLIC HEARING
Notice is hereby given that the Council of
715 MULBERRY ST. said City will conduct a public hearing on
the proposed plans, specifications, form
he
WATERLOO IA 50703 of contract,and estimate cost for tt
construction of the above-described
escribed he
provement project at 5:30 P.M. on the
18th day of May 2020,said hearing to be
held in the Harold E. Gaily Council
Chambers in City Hall in said City. The
ORDER NUMBER 181025 proposed plans, specifications, form of
contract, and estimate of cost for said
improvements heretofore prepared by the
City Engineering Department are now on
file in the office of the City Clerk for public
n examination, and any person interested
therein may file written objection thereto
V ✓l with the City Clerk before the date set for
G� said hearing, or appear and make
objection thereto with the City Clerk
g before the date set for said hearing, or
Signed appear and make objection thereto at the
meeting above set forth.
The City of Waterloo will continue to hold
Subscrib nd sworn to before me this 5—day of ' 2Q:) city council meetings as scheduled,
however in response COVID-19,
elected officials and city staff will
participate via videoconferencing with
elected officials and city staff dialing in to
the meeting participate.
The public is
invited to speak on public
hearing items in the following ways.Call
y
Notary P llc the City Clerk's Office at confer 1-4323 by
4:45 p.m. to l obtain conference call
information.Alternatively,you may email
your comments to comments water-
Received of loo-ia.org and they will be read during the
public hearing. Please state the public
hearing item on which you wish 10 speak.
SCOPE OF WORK
the sum of Dollars in full The work shall include the following
items:
for publication of the above invoice. This projectis rehabilitation of an existing
anaerobic digester at the City of Waterloo
Wastewater Treatment Plant. Work in.
Notary Seal: JODI E MCKINST digest rehabilitation and reinstallation of
*'"" digester cover on anaerobic Digester f .a
e* e3;concrete tank wall and surface repairs;
C.OI9WI S90ft1 Pl0.762b13 root slab removal and replacement;
♦ MYs architectural finish repairs; spray foam
io�t• insulation replacement;installation of new
Section: Legals pipe support hangers to support existing
process piping;rehabilitation and reinstal-
lation of three cover mounted draft tube
Category: 950 Legal Notice mixers; start-up testing; and miscellane-
ous metals, painting, piping, electrical,
PUBLISHED ON: 05/04/2020 eve demolition
of the Council of the City of
Waterloo this 20th day of April,2020.
Kelley Felchle,City Clerk
CITY OF WATERLOO,IOWA
TOTAL AD COST: 45.12
FILED ON: 5/5/2020