HomeMy WebLinkAboutIDOT-4/11/2016Form 830240wd 04-08 Iowa Department of Transportation NNW Change Order No. 19 Non - Part Part Non -Substantial: ® ❑ Substantial: ❑ 0 Contract Accounting ID No.: 29528 County Black Hawk Project No: STP -U-8155(711)-70--07 Concurrence Date Kind of Work: PCC Paving Date Prepared: November 17, 2015 Contractor: Croell & Subsidiary You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: 7003 - Increase Item 0050 for "Compaction w/ Moisture & Density Control" from 16745,00 CY to 17024.65 CY 7004 - Increase Item 0060 for "Modified Subbase" from 6772.000 CY to 6804.705 CY. 7005 - Increase Item 0080 for "Shoulder Construction, Earth" from 108.10 Sta. to 216.20 Sta. 7006 - Increase Item 0090 for "Standard or Slipform PCC Pavement, Class C Class 2 Durability, 8 In," from 33,198.000 SY to 33,445.040 SY 7007 - Increase Item 0160 for "Excavation CL 20" from 475.000 CY to 735.000 CY 7008 - Increase Item 0210 for "Aprons, Concrete, 36 IN. DIA." from 10,0 EA to 12.0 EA 7009 - Reduce Item 0310 for "Flowable Mortar" from 64.000 CY to 52.500 CY B — Reason for change or extra work: 7003 - Item increased because the quantity was mis-calculated in the original contract. 7004 - Item Increased because the quantity was mis-calculated in the original contract. 7005 - Item Increased because the original quantity did not include both side of the road in accordance with the typical section. 7006 - Item increased because the quantity was mis-calculated in the original contract. 7007 - Item increased because the quantity was mis-calculated in the original contract. 7008 - Item increased because the quantity was mis-calculated in the original contract, 7009 - Item decreased because the quantity was mis-calculated in the original contract. Approved (Continued on reverse side) Approved District Construction Engineer Date City of Waterloo Project Engineer Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration Date Z —r6— /c Date actor !� By oc �//� -16-4 Date Approved Assistant Construction Engineer Date DISTRIBUTION: Project Engineer— Forward original to District. District—Nonsubstantiai— Forward original and one copy to the Office of Construction and two copies back to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. C-1 -Settlement for cost of work to be made as follows: 7003 - 459.65 CY x $0.30 = $137.89 7004 - 32.705 CY x $31.40 = $1026.94 7005 -108.1 STA x $120.00 = $12,972.00 7006 - 247.040 SY x $25.89 = $6395.87 7007 - 260.000 CY x $5.00 = $1300.00 7008 - 2.0 EA x $665.00 = $1330.00 7009 - (11.5 CY) x $85.00 = ($977.50) C-2 - Justification for cost(s) All Items: Contract Unit Prices D - ITEMS INCLUDED IN CONTRACT Accounting ID No. 1 2 1 9 1 5 1 2 8 1 1 2 3 4 5 6 Change Order No. 1 If Credit Change No. Line Item Number • Una Price .xxx Quantity .xxx Amount .xx 7 003 0050 - Compaction w/ Moisture & Density Control $0.30 459.65 $137.89 7 004 0060 - Modified Subbase $31.40 32.705 $1026.94 7 005 0080 - Shoulder Construction, Earth $120.00 108.1 $12,972.00 7 006 0090 - Standard or Slip Form PCC Pavement, Class C, Class 2 Durability, 8 In. $25.89 247.040 $6395.87 7 007 0160 - Excavation, CL 20 $5.00 260,000 $1300.00 7 008 0210 - Aprons, Concrete, 36 IN. DIA. $665.00 2.0 $1330.00 7 009 0310 - Flowable Mortar $85.00 -11,500 -3977.50 E - ITEMS NOT INCLUDED IN CONTRAC TOTAL $22,185.20 If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8 8 8 8 8 8 8 TOTAL