Loading...
HomeMy WebLinkAboutWoodruff Construction, CO#1 Carpet Replacement ALO - 7.20.2020CHANGE ORDER NO. 1 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date July 14, 2020 Project Terminal Building Carpet — Terminal Improvements Owner's Contract No. IDOT CSVI 9I190AL0200, Contract 20601 Contractor Woodruff Construction Date of Contract Start You are directed to make the following changes in the Contract Documents. Description: Item Description Unit Est. Quantity Unit Price Extended Price 5A Office Area 1- Materials and Labor EA 1 ($ 5,981.00) ($ 5,981.00) 5B Office Area 2 — Mobilization EA 1 $ 2,300.00 $ 2,300.00 BID ALTERNATE NO.1 1 Business Center SFT 363 $ 5.35 $ 1,942.05 2 FAA Office SFT 423 $ 5.30 $ 2,241.90 SUBTOTAL $ 502.95 Reason for Change Order: The purpose of this change order is to delete carpet from Office Area 1, Line Item 5, included in the base bid for the Terminal Building Carpet Improvements. The Contractor included items related to Mobilization and General Conditions cost in this item which are costs incurred since there was not a bid item included for Mobilization and General Conditions. Line Item 5 Materials and Labor costs have been removed and costs included for Mobilization and General Conditions. The change order also allows for executing Bid Alternate No. 1 for Carpet in the Business Center and FAA Office. Terminal Building Carpet CO-1 Project No — 60600098 1 CONTRACT PRICE Original: $ Previous C.O.s (ADD): $ This C.O. (ADD): $ Contract Price with all approved Change Orders: $ 82,384.20 81,881.25 Original: CONTRACT TIMES (Contract Completion) To substantial To final completion completion 0.00 Previous C.O.s (ADD): 502.95 This C.O. (ADD): REVISED: 11/01/2020 0 0 11/01/2020 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: 3 • l� Engineer (Authorized Signature) APPROVED: By: Quentin Hart Owner (Authorized Signature) ACCEPTED: By: Contractor (Authorized Signature) July 15, 2020 Date July 20 2020 Date Date Terminal Building Carpet CO-1 Project No — 60600098 2