HomeMy WebLinkAboutWoodruff Construction, CO#1 Carpet Replacement ALO - 7.20.2020CHANGE ORDER NO. 1
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date July 14, 2020
Project Terminal Building Carpet — Terminal Improvements
Owner's Contract No. IDOT CSVI 9I190AL0200, Contract 20601 Contractor Woodruff Construction
Date of Contract Start
You are directed to make the following changes in the Contract Documents.
Description:
Item
Description
Unit
Est.
Quantity
Unit Price
Extended Price
5A
Office Area 1- Materials and Labor
EA
1
($ 5,981.00)
($ 5,981.00)
5B
Office Area 2 — Mobilization
EA
1
$ 2,300.00
$ 2,300.00
BID ALTERNATE NO.1
1
Business Center
SFT
363
$ 5.35
$ 1,942.05
2
FAA Office
SFT
423
$ 5.30
$ 2,241.90
SUBTOTAL $ 502.95
Reason for Change Order:
The purpose of this change order is to delete carpet from Office Area 1, Line Item 5, included in the base bid for
the Terminal Building Carpet Improvements. The Contractor included items related to Mobilization and General
Conditions cost in this item which are costs incurred since there was not a bid item included for Mobilization and
General Conditions. Line Item 5 Materials and Labor costs have been removed and costs included for
Mobilization and General Conditions.
The change order also allows for executing Bid Alternate No. 1 for Carpet in the Business Center and FAA
Office.
Terminal Building Carpet
CO-1 Project No — 60600098
1
CONTRACT PRICE
Original: $
Previous C.O.s (ADD): $
This C.O. (ADD): $
Contract Price with all
approved Change Orders: $ 82,384.20
81,881.25 Original:
CONTRACT TIMES (Contract Completion)
To substantial To final
completion completion
0.00 Previous C.O.s (ADD):
502.95 This C.O. (ADD):
REVISED:
11/01/2020
0
0
11/01/2020
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: 3 • l�
Engineer (Authorized Signature)
APPROVED:
By: Quentin Hart
Owner (Authorized Signature)
ACCEPTED:
By:
Contractor (Authorized Signature)
July 15, 2020
Date
July 20 2020
Date
Date
Terminal Building Carpet
CO-1 Project No — 60600098
2