Loading...
HomeMy WebLinkAboutWoodruff Construction_CO#13 - Lincoln Park Improvements Cont. No. 973 - 7.20.2020CHANGE ORDER ® Mark Kuiper, RTTLAND+KUIPER ❑ Nate Gaetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No..: 13 DATE OF ISSUANCE: 4/23/2020 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Elimination of all joint sealant on the project. This includes all caulking of isolation joints as noted on the plans. TOTAL (DEDUCT) TO CONTRACT Attachments: 2020.04.07. Estimate from Woodruff Construction S1,543.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was ... $734,330.30 Net change by previously authorized Change Orders $164,984.73 The Contract Sum prior to this Change Order was $899,315.03 The Contract Sum will be (increased) by this Change Order ($1,543.00) The new Contract Sum including this Change Order will be $897,772.03 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects Woodruff Construction City of Waterloo ARCHITECT CONTRACTOR Signatur Mark Kuiper, ASLA, LEED AP Signature Nate Goetsch OWNER QMYl{irt Hat Signature Mayor Quentin Hart WOODRUFF CONSTRUCTION, LLC 60 YEARS April 7, 2020 RE: Waterloo 2019 Lincoln Park Improvements SUBJ: Proposal Request #15 — Elimination of Joint Sealants To whom it may concern, The following is our pricing per Pricing Request #15. Cost Breakdown Kruse Concrete (quote enclosed) = ($1,500.00) Insurance = ($14.00) Bond = ($29.00) Our total price to perform the changed work is a DEDUCT of $1,543.00 Sincerely, WOODRUFF CONSTRUCTION, LLC Nate Goetsch, Project Manager 1717 Falls Avenue (Waterloo, IA 50701 Ph: [319] 233-3349 Fax: (319) 233-3369 Il PROPOSAL REQUEST PROJECT: Lincoln Park PROPOSAL REQUEST NO.: 15 Waterloo, Iowa OWNER: City of Waterloo, Iowa DATE: March 24, 2020 F.Y. 2019 #973 TO: Woodruff Construction, LLC 1717 Falls Avenue Waterloo, IA 50701 Please submit an itemized quotation for changes to the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. All conditions of the Contract shall apply to this Change unless specifically stated otherwise. The monetary and time compensation provided by this Change fully compensate the CONSTRUCTOR for the work covered by the change and for the accumulated affect that this change has on the entire scope of the work. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. The general contractor shall provide a deduct for the following: 1. Elimination of all joint sealant on the project. This includes all caulking of isolation joints as noted on the plans. Nate Goetsch From: Travis Kruse <tkruse564@gmail.com> Sent: Tuesday, March 24, 2020 12:20 PM To: Nate Goetsch Subject: Re: FW: PR-15 Elimination of Joint Sealant Attachments: image001.png Deduct $1500 $500 for materials $1000 for labor. Travis Kruse Kruse Concrete LLC 408 1st St SE Tripoli, IA 50676 319-239-1359 tkruse564@gmail.com On Tue, Mar 24, 2020, 10:26 AM Nate Goetsch <nateg@woodruff.build> wrote: Travis, See below and attached request. Please submit pricing for their review and approval. Thanks, Nate Goetsch I Project Manager Woodruff Construction, LLC (319) 233-3349 x101 www.woodruff.build This email, including all attachments, is confidential information and belongs to the sender and/or the senders company. This information may be legally privileged. If you are not the intended recipient, you are hereby notified that any distribution, disclosure, copying, or taking of any action regarding the contents of this electronically transmitted information is strictly prohibited. If you are not the Intended recipient, please reply to the sender if you have received this message in error, and then please delete. Thank you.- Woodruff Construction 1