HomeMy WebLinkAboutWoodruff Construction_CO#13 - Lincoln Park Improvements Cont. No. 973 - 7.20.2020CHANGE ORDER
® Mark Kuiper, RTTLAND+KUIPER
❑ Nate Gaetsch, Woodruff Construction
❑ Quentin Hart, Mayor of Waterloo, Iowa
PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 2019 #973
TO: Nate Geotsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO No..: 13
DATE OF ISSUANCE: 4/23/2020
FROM:
RITLAND+KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Elimination of all joint sealant on the project. This includes all caulking of isolation joints as noted on the
plans.
TOTAL (DEDUCT) TO CONTRACT
Attachments: 2020.04.07. Estimate from Woodruff Construction
S1,543.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time.
The original Contract Sum was ... $734,330.30
Net change by previously authorized Change Orders $164,984.73
The Contract Sum prior to this Change Order was $899,315.03
The Contract Sum will be (increased) by this Change Order ($1,543.00)
The new Contract Sum including this Change Order will be $897,772.03
The Contract Time will be (unchanged) zero ( 0 ) Days
RITLAND+KUIPER
Landscape Architects Woodruff Construction City of Waterloo
ARCHITECT CONTRACTOR
Signatur
Mark Kuiper, ASLA, LEED AP
Signature
Nate Goetsch
OWNER
QMYl{irt Hat
Signature
Mayor Quentin Hart
WOODRUFF CONSTRUCTION, LLC
60
YEARS
April 7, 2020
RE: Waterloo 2019 Lincoln Park Improvements
SUBJ: Proposal Request #15 — Elimination of Joint Sealants
To whom it may concern,
The following is our pricing per Pricing Request #15.
Cost Breakdown
Kruse Concrete (quote enclosed) = ($1,500.00)
Insurance = ($14.00)
Bond = ($29.00)
Our total price to perform the changed work is a DEDUCT of $1,543.00
Sincerely,
WOODRUFF CONSTRUCTION, LLC
Nate Goetsch, Project Manager
1717 Falls Avenue (Waterloo, IA 50701
Ph: [319] 233-3349 Fax: (319) 233-3369
Il
PROPOSAL
REQUEST
PROJECT: Lincoln Park PROPOSAL REQUEST NO.: 15
Waterloo, Iowa
OWNER: City of Waterloo, Iowa DATE: March 24, 2020
F.Y. 2019 #973
TO:
Woodruff Construction, LLC
1717 Falls Avenue
Waterloo, IA 50701
Please submit an itemized quotation for changes to the Contract Sum and/or Time incidental to proposed
modifications to the Contract Documents described herein. All conditions of the Contract shall apply to
this Change unless specifically stated otherwise. The monetary and time compensation provided by this
Change fully compensate the CONSTRUCTOR for the work covered by the change and for the
accumulated affect that this change has on the entire scope of the work. THIS IS NOT A CHANGE
ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
The general contractor shall provide a deduct for the following:
1. Elimination of all joint sealant on the project. This includes all caulking of isolation joints as
noted on the plans.
Nate Goetsch
From: Travis Kruse <tkruse564@gmail.com>
Sent: Tuesday, March 24, 2020 12:20 PM
To: Nate Goetsch
Subject: Re: FW: PR-15 Elimination of Joint Sealant
Attachments: image001.png
Deduct $1500 $500 for materials $1000 for labor.
Travis Kruse
Kruse Concrete LLC
408 1st St SE
Tripoli, IA 50676
319-239-1359
tkruse564@gmail.com
On Tue, Mar 24, 2020, 10:26 AM Nate Goetsch <nateg@woodruff.build> wrote:
Travis, See below and attached request. Please submit pricing for their review and approval.
Thanks,
Nate Goetsch I Project Manager
Woodruff Construction, LLC
(319) 233-3349 x101
www.woodruff.build
This email, including all attachments, is confidential information and belongs to the sender and/or the senders company. This information may be legally
privileged. If you are not the intended recipient, you are hereby notified that any distribution, disclosure, copying, or taking of any action regarding the contents of
this electronically transmitted information is strictly prohibited. If you are not the Intended recipient, please reply to the sender if you have received this message in
error, and then please delete. Thank you.- Woodruff Construction
1