Peters Construction - CO#2 - 5 Sullivan Bros Hall Ceiling Reno - 8.3.2020
AIA Document G701" - 2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center Exhibit Hall Ceiling Renovation, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 19-23188 Date: May 07, 2020 ARCHITECT: (Name and address) I & S Group, Inc. (ISG) 314 East 4th Street Waterloo, [A 50703 CHANGE ORDER INFORMATION: Change Order NumbeQ02 Date: July 29, 2020 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. PR 02: Cost for NE and NW corners to add drywall and framing to the North wall where chase was removed; SE and SW corners add drywall and framing where the chase was removed Add $4,962,90 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $25,000.00 TO $20,037.10. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of' The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be August 7, 2020. $ 939,810.00 $ 0.00 $ 939,8 10.00 $ 0.00 $ 939,810.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & S Group, Inc. (ISO) ARCFECT (Firm Harrel SIGNATURE Peters Construction Corporation City of Waterloo CO RAGTOR (Ins name) OWNER (Finn name) Quentin Hart SIGNATURE SIGNATURE Nathan Compton, Architect/Project Bradley Best, President Manager PRINTED NAME AND TITLE July 29, 2020 DATE PRINTED NAME AND TITLE [ i21fpLr� DATE Quentin Hart, Mayor PRINTED NAME AND TITLE 8/3/2020 DATE AIA Document G701' — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American institute of Architects. All rights reserved. "I he "American Institute of Architects," "AlA," the AIA Logo, and "AIA Contract Documents" are vegistered trademarks and may not he used without permission. This document was produced by AIA software at 10:07:22 ET on 07/29/2020 under Order No.8114132283 which expires on 07/12/2021, is not for resale, is licensed for one -lime use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3139ADA3F) 1 Page 122 of 141