Peters Construction - CO#3 - 5 Sullivan Bros Hall Ceiling Reno - 8.3.2020
AIA Document G701' - 2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center Exhibit Hall Ceiling Renovation, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 19-23188 CHANGE ORDER INFORMATION: Change Order Numbe4! 003 / Date: May 07, 2020 Date: July 29, 2020 ARCHITECT: (Name and address) I & S Group, inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. CR 03: To move the transformer to the east of the double doors in lieu of in front double doors. Includes additional costs associated with relocating existing conduit and receptacles and piping Add $1,016.I0 B. CR 04: At the three outside windows, to demolish the existing rolling shutters to allow for the installation of the new bulkhead Add $2,854.25 TOTAL ADD $3,870.35 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $9,144.35 TO $5,274.00. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be September 25, 2020. 939,810.00 $ 0,00 939,810.00 $ 0.00 939, 810,00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ! & S Group, Inc. ([SO) ARC TECT (Firm name) Peters Construction Corporation CONT ACTOi a -epitome) mine) SIGNATURE SIGNATURE Nathan Compton, Architect/Project Bradley Best, President Manager PRINTED NAME AND TITLE July 29, 2020 DATE PRINTED NAME AND TITLE 112'r�. DAT DATE City of Waterloo OWNER (Firm name) Quentin }-(art SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 8/3/2020 AIA Document 6701" — 2017. Copyright ©1979, 1987, 2000 , 2001 end 2017 by The American Institute of Architects. All rights reserved. "rhe "Americana Institute of Architects," "AIA," AAIA Logo, and 'NA Contract Documents' are registered trademarks and may not be used without permission. This document was produced by AIA software at 15:14:42 ET on 07/29/2020 under Order No.8114132283 which expires on 07/12(2021, is not for resale, is licensed for ono -time use only. and may only be used in accordance with the NA Contract Documents® Terms of Service. To report copyright violations, email copyrightiala.org. User Notes: (3B9ADA44) 1 Page 124 of 141