HomeMy WebLinkAboutPeters Construction Co CO#1 Revised - 5 Bros Exhibit Hall Reno - 7.13.2020AIA Document GM' — 2017 Change Order PROJECT: (Name and address) 5 Sullivan Brothers Convention Center Exhibit Hall Ceiling Renovation, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Contract For: General Construction Project No: 19-23188 CHANGE ORDER INFORMATION: Change Order Nutnbcr: 001-Revised Date: May 07, 2020 Date: July 29, 2020 ARCHITECT: (Name and address) I & S Group, Inc. (ISO) 314 East 4th Street Waterloo, IA 50703 CONTRACTOR: (Name and address) Peters Construction Corporation 901. Black Hawk Road PO Box 2940 Waterloo, IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. CR 05: Cost for demobilization and remobilization, temporary lighting, temporary cooling and life safety for the duration of event in the Exhibit Hall that is scheduled July 13th thru 27th. Also, new substantial completion date of September 25th due to project delay from chiller project truss reinforcement and shutdown for auction. Pricing does not include moving materials off site. City has stated they would get the AC unit operational for the event so that pricing as been removed Add $10,892.75 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $20,037.10 TO $9,144.35. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Forty -Nine (49) days. The new date of Substantial Completion will be September 25, 2020. 939,810.00 0.00 $ 939,810.00 $ 0.00 $ 939,810.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & S Group, Inc. (ISG) ARCHITECT (Firer name) SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE July 29, 2020 DATE Peters Construction Corporation City of Waterloo CONJRACTOR (Firm name) SIGNATURE Bradley Best, President PRINTED NAME AND TITLE 1a°I 1 DATE DATE OWNER (Fern name) Oueniin Hart SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 7/13/2020 AIA Document G7O1'" —DM. Copyright 01979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architect;;," "AIA," the AIA Logo, and "AIA Contract Doan -nerds" are registered trademarks and may not he used without permission, This document was produced by AIA software at 14:55:01 ET on 07/29/2020 under Order No.8114132283 which expires on 07/12/2021, is not for resale, Is licensed for one-time use only. and may only be used In accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (389ADA43)