Loading...
HomeMy WebLinkAboutMunicipal Pipe and Tool Completion of Project, Cont No. 962 - 5.26.2020 A COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo,Iowa 50703 www.aecom.com May 19, 2020 Mr. Matt Hosford Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 Subject: FY 2019 CIP Pipelining Phase IIIC Pay Estimate No. 6 City of Waterloo, Iowa City Contract No. 962 AECOM #60604454 Dear Mr. Hosford: Attached is Pay Estimate No. 6 submitted by Municipal Pipe Tool Co., LLC (MPT), for the FY 2019 CIP Pipelining Phase IIIC project. This Pay Estimate covers the retainage release. The Project is approximately 100% complete. AECOM recommends the City of Waterloo release the project retainage of $17,697.02 to Municipal Pipe Tool Co., LLC. Yours sincerely, Christopher G. Oelkers, PE Enclosure: Pay Estimate Tabulation Completion Statement P:\60604454\600_Construction_Support\04-PH IIIC\660_Pay Applications\PE No.6-Final Payment\Wat CIPP PH IIIC-Pay Estimate No 6 LTR.docx AXOM AECOM 319-232- 1 tel 501 Sycamore Street 319-232-027027 1 fax Suite 222 Waterloo,Iowa 50703 www.aecom.com May 19, 2020 Mr. Matt Hosford Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 Subject: FY 2019 CIP Pipelining Phase IIIC Completion Statement City of Waterloo, Iowa City Contract No. 962 AECOM #60604454 Dear Mr. Hoambrecker: By this letter, we hereby state: 1. A final review of the above-referenced project was held, and the project is considered complete as of May 19, 2020. 2. To the best of our knowledge and belief, based on observations of AECOM staff during construction, the contractor, Municipal Pipe Tool Co., LLC, has performed the work in accordance with the plans, specifications and contract documents in effect for the above-referenced project. 3. The total cost of the completed work is$353,940.40. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Q Professional Engineer under the laws of the state of Iowa. �C c' :CHRISTOPHER G.'. w OELKERS z = L) 22053 m 05/19/2020 CHRISTOPHER G. OELKERS, P.E. Date 0 W'A License No. 22053 My license renewal date is December 31, 2021. Pages or sheets covered by this seal: All Pages P:\60604454\600_Construction_Support\04-PH IIIC\660_Pay Applications\PE No.6-Final Payment\20200515 Wat CIPP PH IIIC-Completion Statement.docx PAY ESTIMATE FOR FY 2019 CIP PIPELINING PHASE IIIC A=COM CITY OF WATERLOO WATERLOO,IOWA AECOM Project No.60604454 Period Ending:05/15/20 Estimate No.:6 Contractor:Municipal Pipe Tool Co.LLC CONTRACT PROJECT TOTAL TO DATE CURRENT PERIOD NO. DESCRIPTION UNIT UNIT PRICE TOTAL QUANTITY AMOUNT INSTALLED TOTAL INSTALLED AMOUNT %COMP QUANTITY QUANTITY 1 8"Diameter CIP Pipe Lining LF $ 20.50 8,224.9 $ 168,610.45 8,224.90 $ 168,610.45 $ - 100.00% 2 10"Diameter CIP Pipe Lining LF $ 22.50 694.3 $ 15,621.75 694.30 $ 15,621.75 $ - 100.00% 3 12'Diameter CIP Pipe Lining LF $ 27.75 1,249.8 $ 34,681.95 1,249.80 $ 34,681.95 $ - 100.00% 4 15'Diameter CIP Pipe Lining LF $ 43.00 0.0 $ - 0.00 $ - $ - REMOVED 5 Pipe Televising-8" LF $ 0.50 17,445.8 $ 8,722.90 17,445.80 $ 8,722.90 $ - 100.00% 6 Pipe Televising-10" LF $ 0.50 1,388.6 $ 694.30 1,388.60 $ 694.30 $ - 100.00% 7 Pipe Televising-12" LF $ 0.50 2,499.6 $ 1,249.80 2,499.60 $ 1,249.80 $ - 100.00% 8 Pipe Televising-15" LF $ 0.50 0.0 $ - 0.00 $ - $ - REMOVED 9 Pipe Cleaning-8" LF $ 1.25 9,220.9 $ 11,526.13 9,220.90 $ 11,526.13 $ - 100.00% 10 Pipe Cleaning-10" LF $ 1.25 694.3 $ 867.88 694.30 $ 867.88 $ - 100.00% 11 Pipe Cleaning-12" LF $ 1.25 1,249.8 $ 1,562.25 1,249.80 $ 1,562.25 $ - 100.00% 12 Pipe Cleaning-15" LF $ 1.75 0.0 $ - 0.00 $ - $ - REMOVED 13 Type C Root Removal-8"-10" LF $ 2.50 8,603.0 $ 21,507.50 8,603.00 $ 21,507.50 $ - 100.00% 14 Type C Root Removal-12"-15' LF $ 3.00 721.0 $ 2,163.00 721.00 $ 2,163.00 $ - 100.00% 15 Lateral Reinstatement EA $ 75.00 240.0 $ 18,000.00 240.00 $ 18,000.00 $ - 100.00% 16 3-FT Lateral Grouting EA $ 260.00 202.0 $ 52,520.00 202.00 $ 52,520.00 $ - 100.00% 17 Protuding Tap Removal EA $ 250.00 34.0 $ 8,500.00 34.00 $ 8,500.00 $ - 100.00% 18 EXTRA WORK-MH 12-21 to 12-20-Valley Drive HR $ 575.00 2.5 $ 1,437.50 2.50 $ 1,437.50 $ - 100.00% 19 EXTRA WORK-MH 24-08-01 to 24-08-Byron Avenue LS $ 4,850.00 1.0 $ 4,650.00 1.00 $ 4,650.00 $ - 100.00% 20 EXTRA WORK-MH 10-15 to 10-16-Prospect Boulevard HR $ 475.00 3.0 $ 1,425.00 3.00 $ 1,425.00 $ - 100.00% CONTRACT TOTAL SUBMITTED TO DATE CURRENT PERIOD Is 353,940.40 Is 353,940.40 Is - 100.00% CHANGE ORDERS NO. DESCRIPTION Item Number CHANGE ORDER AMOUNT ORIGINAL CONTRACT $ 377,252.75 CHANGE ORDER NO.1 1,5,9,11,13,14,17 $ 32,664.35 CHANGE ORDER NO.2 ALL except 16 $ (35,525.35) CHANGE ORDER NO.3 1-3.5-7,9-11,16 $ (20,451.35) CONTRACT TOTAL Is 353,940.40 THIS PAY PERIOD Pay Estimate No.6 $ - Stored Materials This Period $ - Subtotal $ - Retainage This Period 5.00% $ - REQUESTED PAYMENT-PAY ESTIMATE NO. 6 $ - PROJECT TO DATE Pay Estimate No.1 $ 83,595.70 Pay Estimate No.2 $ 207,721.40 Pay Estimate No.3 $ 9,754.65 Pay Estimate No.4 $ 19,848.65 Pay Estimate No.5 $ 33,020.00 Pay Estimate No.6 $ - WORK COMPLETED TO DATE $ 353,940.40 TOTAL STORED MATERIALS TO DATE $ - TOTAL REQUESTED PAYMENT TO DATE $ 353,940.40 Retainage to Date 000% $ - TOTAL REQUESTED PAYMENT TO DATE LESS RETAINAGE $ 353,940.40 PREVIOUS PAYMENTS Pay Estimate No.1 $ 79,415.92 Pay Estimate No.2 $ 197,335.33 Pay Estimate No.3 $ 9,266.92 Pay Estimate No.4 $ 18,856.22 Pay Estimate No.5 $ 31,369.00 ;7= Previous Payment Subtotal $ 336,243.38 �Q� /REQUESTED PAYMENT-PAY ESTIMATE NO. 6 $ 17,697.02 05/15/20 Municipal Pipe Tool Co.LLC Date 05/15/20 Christopher G.Oelkers,AECOM,Project Engineer Date Q"tin Hat 5/26/2020 CITY OF WATERLOO Date P:\60604454\600_Construction_Support\04-PH IIIC\660_Pay Applications\PE No.6-Final Payment\IWAT CIPP PH IIIC-Pay Estimate No 6.xlsx]Pay Estimate 06