HomeMy WebLinkAboutWoodruff Construction - CO#1 - Hangar 4 - 8.17;.2020 WOODRUFF CONSTRUCTION, LLC 1717 Falls Avenue I Waterloo,IA 50701 Ph:(319)233-3349 Fax:(319)233-3369 August 11,2020 RE: Waterloo Regional Airport—Hangar No.4Improvements SUBJ: Potential Change Order#1:Additional Asbestos Removal To whom it may concern, The following is our pricing per Potential Change Order#1 and enclosed clarifications: Cost Breakdown ADD to ref. item 3 (quote attached) = $865.00 DEDUCT to ref. item 7 = -$193.00 Mark-up on subs(10%) = $86.50 Insurance = $6.83 Bond = $14.41 Our total price to perform the changed work is an ADD of$779.74 Sincerely, WOODRUFF CONSTRUCTION, LLC Will McAllister, Project Manager Y Proposal � .4 Proposal Submitted To: Woodruff Companies =_,. Attn: Will McAllister ENVIRONMENTAL ' I!`.I IMC[i hN()Rllhit M3.Nr. 111e'. -. 1717 Falls Avenue Waterloo, IA 50701 Project&Address: Asbestos removal- black floor mastic 803 Ricker St Waterloo Airport- Hanger#4- NE Office floor Waterloo, IA 50703 200 West 4th Street Phone:319-287-4447 Waterloo, IA 50701 Fax:319-287-4449 Phone:319-233-3349 Date:08/10/2020 Email:willm@woodruff.build WE HEREBY PROPOSE to furnish all the materials,equipment and perform all labor for the completion of: Removal&disposal of the acm black mastic under carpeting in NE office of Waterloo Airport Hanger#4. PROPOSAL INCLUDES:(1)Daily OSHA required personal&excursion air monitoring State of Iowa requires a ten(10)working day notification by the contractor prior to commencement of work. MISC.ACKNOWLEDGMENTS(initials required on all lines): ) Is price is good if work is completed at the same time as the original project(saves setting up an extra containment) WE PROPOSE to furnish material and labor,complete in accordance with the above specifications for the sum of: Eight Hundred Sixty Five Dollars($865.00) TERMS:Net 10 days All work is guaranteed to be as specified.All work to be completed in a workmanlike Respectfully Submitted, manner according to specified practices.Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge above the estimate.All agreements contingent upon strikes, ADVANCED ENVIRONMENTAL TESTING AND accidents or delays beyond our control.owner to carry fire,tornado,and other necessary ABATEMENT INC Insurance.We carry general liability Insurance and our workers are fully covered by r workers compensation insurance. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. Jay Llewellyn ACCEPTANCE OF PROPOSAL The price,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Payment(s)will be made as outlined above. Signature: Q-LQNL(S� tt ,, -- / 11 11 Date: 17/2-e 2-6Name&Title(PRINT): IXUI1�111 i tom✓ , 1�1 ` - Y Keith Kaspari From: Hughes, David (Des Moines) <David.Hughes@aecom.com> Sent: Thursday,August 13, 2020 8:52 AM To: Keith Kaspari Cc: Schindel, Doug Subject: FW:Waterloo Airport Hangar 4 PCO#1 Attachments: PCO#1 Asbestos Removal.pdf,Asbestos Report Hangar 4.pdf Keith, Attached is the Asbestos report that Woodruff completed for Hangar No.4 as part of their OSHA requirements. Additional floor the and black mastic found under the carpet in the manager's office area. They have proposed a Change Order in the amount of$779.74 to complete this additional asbestos removals. The CSVI Grant currently has$228.25 remain,so this Change Order would require$551.49 of local funding to complete. I will give you a call later this morning to discuss. David B. Hughes, P.E. Department Manager 515-323-7919 From:Will McAllister<willm@wood ruff.build> Sent:Wednesday,August 12, 2020 4:30 PM To: Hughes, David (Des Moines)<David.Hughes@aecom.com> Subject: [EXTERNAL)Waterloo Airport Hangar 4 PCO#1 David, Attached is the PCO for the additional asbestos removal, along with the asbestos report.There were a few other spots where asbestos was located, but I don't believe those would affect our work.We are mainly concerned with the asbestos under the carpet in the NE office.This was the only location we had Advanced Environmental quote us. Let me know if there are any questions.We would like to be able to remove all at once if possible,so not to incur the extra mobilization fee that Jay has listed out on his quote. He would like to start Monday if possible. Thanks, Will McAllister [ Project Manager Intern Woodruff Construction, LLC 319-233-3349 x104 V.1000r+UFt-GQNSTa UGTtQN www.woodruff.build This email,including all attachments,is confidential information and belongs to the sender and/or the senders company.This information maybe legally privileged.If you are not the intended recipient,you are hereby notified that any distribution,disclosure,copying,or taking of any action regarding the contents of this 1