SHAUUS ROAD TRAIL EXTENSION, PHASE 1
WATERLOO, IOWA
SUPPLEMENTAL AGREEMENT NO. 1
WHEREAS, a Professional Services Agreement was entered into by the City of Waterloo, Iowa
(City), and AECOM Technical Services, Inc. (Consultant), of Waterloo, Iowa, dated September 2,
2014, for the preliminary design, final design and construction review for the Shaulis Road Trail
Extension, Phase 1, from IA 21 to IsIe and Capri Boulevards, Waterloo, Iowa; and
WHEREAS, the City and Consultant desire to amend the previous agreement to include
engineering services during the construction phase of the Shaulis Road Trail Extension, Phase 1,
construction project.
NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement
as foliows:
SCOPE OF SERVICES
Services to be provided under this supplemental agreement include the construction
staking, field review, material testing and contract administration for the construction of the
Shaulis Road Trail Extension, Phase 1, construction project from IA 21 to IsIe of Capri
Boulevard. The scope of services is further defined by the foliowing tasks:
Task 1 - Preconstruction Conference. Assist the City with conducting the preconstruction
conference and have appropriate representative staif attend. This task includes conducting
the meeting and preparing minutes.
Task 2 - Construction Stakinq. Provide horizontal and vertical control, including the
foliowing items:
• Project Control
• Stake Construction Limits at 100 -Foot Intervals, PIus Break Points
• Set Siope Stakes ar Grading Stakes at 50 -Foot Intervals
• Set Stakes for Drainage Structures
• Set Stakes for Intakes and Utihty Accesses
• Set Stakes for Retaining Wall
• Set Stakes at 25 -Foot Intervals for Sidewalk/Trail
• Set Stakes for Driveway Locations
• Set Stakes at 100 -Foot Intervals for Fence From 175+90 to 183+00
• Set Stakes for Lighting and Signals
Task 3 - Interpret Plans and Specifications. Interpret the intent of the plans and
specifications for general compliance with the construction contract. The Consultant will
not, however, guarantee the performance of any contractor.
Task 4 - Shop Drawinq Review. Review work drawings, samples and other submittals of
the contractor only for general conformance to the design concept of the project and for
general compliance with the construction contract. Article 1105.03, Iowa DOT Standard
Specifications for Highway and Bridge Construction, will apply.
Task 5 - Proqress and Qualitv of Construction. Maintain direct contact with the Gity's
representative or his authorized representative to the extent necessary to inform the Citys
AXOM
representative of the progress and quality of construction work performed. Provide the
necessary qualified staff at the job site to act under the authority of the Citys
representative, and observe and review the work in progress and determine whether the
work is in general conformity with the contract plans and specifications. Construction field
review staff shall be responsible for required construction documentation, including
maintaining project dairies and quantity records as required by Iowa DOT federal -aid
project standards. It is understood that responsibility for the correctness of every detail of
construction is beyond the scope of this agreement. The Consultant shall not assume
management or direction of the contractor's operations or any utility companys operations.
Nothirig in this agreement shall be construed as giving the Consultant the responsibility or
authority to direct or supervise construction methods, means, techniques, procedures or
safety methods used by the contractor, subcontractors, or utihty companies performing the
actual construction work. Neither observations by the Consultant nor inspections, tests or
approvats, shall relieve the contractor, subcontractors or utility companies from their
obligation to perform the work in accordance with the requirements of the contract
documents.
The contractor has ultimate responsibility to monitor all his work to ensure proper quality,
safety and completion within the contract time, as do the utility companies invotved in this
project.
Task 6 - Testinq. Consultant will complete necessary earthwork, density and P.C.C.
verification testing for the project as required by Iowa DaT's Materials Department
Instruction Memorandurns and Iowa DOT's Construction ManuaL The contractor shall be
responsible for certified plant inspection in accordance with the standard specifications.
Task 7 - Reports. Prepare and submit daily, weekly and monthly reports as required by
Iowa DOT's Materials Department Instruction Memorandums and Iowa DOT's Construction
Manual. AIso includes preparation and submittal of change and extra work orders,
subcontract requests and other forms as are normally utilized by the Iowa DOT on
construction projects. Reports are to be submitted per Iowa DOT Standards for reporting,
and copies of reports are to be subniitted to the City.
Task 8 - Estimates. Make monthly or bi-monthly reports to the City's representative, or his
authorized representative, of the estimated amount of materials furnished and delivered
and the work performed. Review and approve estimates for progress and final payment.
Task 9 - Pav Quantities. Measure and document construction pay quantities and perform
functions necessary to assist with funding reimbursement for the project.
Task 10 - Claims. Consider and evaluate contractor's suggestions for modifications and
report them with recommendation to the City. Prepare and assist the City and contractor in
processing contract change orders.
Task 11 - Final Construction Review. Conduct the final construction review with
representatives of the Iowa DOT and City at completion of the project. The Consultant shall
state his opinion as to whether the project was completed in substantial conformance with
the Plans and Specifications and recommend acceptance thereof.
Task 12 - Record Drawinqs. Prepare record drawings conforming to the construction
records provided to the Consultant by the contractor during the construction process.
AECOM
Task 13 - Proiect Close -Out. Complete construction and materials audits in compliance
with Iowa DOT standards. Prepare final acceptance documents, as required by Iowa DOT.
Task 14 - Proiect Administration. Attend periodic construction meetings and conduct
intraoffice administration and coordination of the project. These meetings shall include
utility coordination meetings, as needed, during execution of construction.
II. COMPENSATION
The Consultant shall be reimbursed for the actual costs incurred in accordance with
Article 3 of the original agreement. For this agreement (construction and administrative
services), the City shall retain from each monthly payment 3 percent of the amount due.
Final payment shall not be made to Consultant until after receiving approval from the Iowa
DOT.
The estimated actual costs, fixed fee, contingency and maximum amount payable for this
supplemental agreement, as stated below and as shown in Attachment A, are to be
segregated from those covered under the original agreement.
Estimated Actual Costs $102,070.00
Fixed Fee 12,810,00
Contingency 5,100.00
Maximum Amount Payable $119,980.00
III. In all other respects, the obligations of the City and Consultant shall remain as specified in
the Professional Services Agreement dated September 2, 2014.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as
of the dates shown below:
AECOM TECHNICAL SERVICES, INC.
By 41 Za Date January 22 2016
a
Douglas indel, P.E.
Associate Vice President
CITY OF WATERLOO, IOWA
By ` - - " kr-Cc'� Date
Quentin Hart, Mayor
IOWA DEPARTMENT OF TRANSPORTATION
ACCEPTED FOR AUTHORIZATION
By
Date 2,
O:Wdminitr io GREE\SUPPLEISA1WatShaulisRdTrailExtPhl.docx
Shaulis Road Trail Extension, Phase 1
IA 21 to lsIe of Capri Boulevard
City of Waterloo, Iowa
Construction Review Services
Cost Analysis
Dfrect Labor Cost (AECOM Technical Services)
Cateqory Hours Rate/Hour Amount
Senior Professional 0 $77.30 $0.00
Project Professional 72 $54.65 $3,93480
Staff Professional 146 $43.35 $6,329.10
Professional 0 $34.40 $0.00
CADD Operator 11 12 $33.10 $397.20
CADD Operator 1 0 $23.40 $0.00
SeniorTechnician 712 $33.80 $24,065.60
Technician 164 $24.85 $4,075.40
Project Support 76 $29.15 $2,215.40
1182
Attachment A
$41 01750
11. Payroll Burden and Overhead Costs 140.16% $57490.13
111. Direct Project Expenses
Cateqory Units Rate/Unit Amount
Mileage 2750 0575 1581.25
Per Diem 0 45.00 0.00
Lodging 0 90.00 0.00
B/W Copies 1000 0.06 60.00
Color Copies 500 0.22 110.00
EDM Equipment 105 12.50 1,312.50
GPS Equipment 0 25.00 0.00
Miscellaneous, Other 500.00
IV. AECOM Estimated Actual Costs (1+11+111)
Rounded
$3,563.75
$102,071.38
$1 02,070.00
V. FixedFee $12,810.00
VI. Contingency
AECOMTechnical Services $5,100.00 $5,100.00
Vil. Subcontract Expense
$0.00 $0.00
Vill. Maximum Amount Payable (IV+V+VI+VII) $1 19,980.00
Attac h ment A
Shaulis Road TraiI Extension, Phase 1
IA 21 to ide ofCapri Boulevard
City ofWaterloo, Iowa
Conslruction Review Services
Staif ilour Estimate
Description ot Work
Senior
Prof,
Project
Frof.
Staif
Prof.
Prof.
CADD
ap. 11
CADD
Op. 1
Sonior
Tech
Tech
Project
Supporl
Totot
1 Preconstnjction Conforence
2 Conslnjctlon Staking
3 nterpret Plans and Specilicalions
4 Shop Drawing Review
2
2
6
8
16
8
5 Progress and Quality of Constnjction
6 Testin0
24
164
164
8
16
336
24
380
7 Repotls
64
24
8
8 Estimates
9 Pav Quantilies
10 Claims
11 Final Conslruction Review
12 Record Drawings
13 Projoct Closo-Out
14 Projoct Administration
4
20
4
4
16
4
4
40
20
6
4
8
12
4
40
32
16
40
16
34
404
64
32
32
40
36
16
20
24
112
TOTAL HOURS
0
12
146
0
12
0
112
164
76
1,182