Loading...
HomeMy WebLinkAboutIDOT Addendum, Cont. No. 1016 - 8.24.2020 July 2020 IOWA DEPARTMENT OF TRANSPORTATION Addendum to Agreement No. 2-20-STBG-SWAP-018 County Blackhawk City Waterloo Project No. STBG-SWAP-8155(760)--SG-07 Iowa DOT Addendum No. 2-20-STBG-SWAP-018A This Addendum, is entered into by and between the Iowa Department of Transportation, hereinafter designated the "DOT", and City of Waterloo, Iowa, the Recipient, hereafter designated the "Recipient"; The DOT and the Recipient previously entered into the following agreement for the above referenced project: Agreement No. 2-20-STBG-SWAP-018 for Engineering Services and Construction on La Porte Rd/Hess Rd,from Hawthorne Ave to Shaulis Rd. was executed by the Recipient and the DOT on February 24, 2020, and March 12, 2020 respectively; and Subsequent to execution of the above referenced Agreement it was determined that only Preliminary Engineering, Final Design and ROW is to be added to the approved eligible project activities from STBG Federal-aid Swap funds. This Addendum reflects the current concept of this project which is subject to modification by mutual agreement between the Recipient and the DOT. Now, therefore, it is agreed as follows: The Recipient shall receive reimbursement for costs of authorized and approved eligible project activities from STBG Federal-aid Swap funds. The portion of the project costs reimbursed by STBG Federal-aid Swap funds shall be up to $1,480,000 for the following phases of work as stipulated by the Iowa Northland Regional Council of Governments: X Preliminary Engineering Construction Engineering X Right-of-Way Construction Other(please specify) 1. It is the intent of both (all) parties that no third party beneficiaries be created by this Addendum. 2. If any section, provision, or part of this Addendum shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Addendum as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Addendum cannot be fulfilled. 3. All previously executed agreement(s) and or addendum(s) will remain in effect except as amended herein. 4. This Addendum may be executed in two counterparts, each of which so executed will be deemed to be an original. 5. This Addendum, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the Recipient and DOT regarding this project. All previously executed agreements will remain in effect except as amended herein. 1 July 2020 Any subsequent change or modification to the terms of this Addendum will be in the form of a duly executed amendment to this document. IN WITNESS WHEREOF, each of the parties hereto has executed Addendum No. as of the date shown opposite its signature below. CITY OF WATERLOO: By: D wwnt-in H t, Date August 24 — 20 20. Title: Mayor Kelley Felchle Quentin Hart I, , certify that I am the Clerk of the City, and that_,who signed said Agreement for and on behalf of the City was duly authorized to execute the same on the 24 day of August , 20 20 . Signed: k'ellq �'elchl8 City Clerk of Waterloo, Iowa. IOWA DEPARTMENT OF TRANSPORTATION Highway Administration By Date 20 Kent L. Ellis, P.E. Local Systems Field Engineer Eastern Region 2