HomeMy WebLinkAboutPeters Construction CO_#4_-_5_Sull_Bros_Exh_Hall_Ceiling_Reno 9.8.2020 , 0-7 OvAIA Document G701 - 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 5 Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:004 Exhibit Hall Ceiling Renovation, Project No: 19-23t88 Waterloo,IA. Date:May 07,2020 Date:September 1,2020 OWNER:(Name and address) ARCHITECT:(Marne and address) CONTRACTOR: (Nance and address) City of Waterloo I&S Group,Inc.(180) Peters Construction Corporation 715 Mulberry Street 314 East 4th Street 901 Black Hawk Road Waterloo,IA 50703 Waterloo,IA 50703 PO Box 2940 Waterloo IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,if applicable, attach or reference specdfrc exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) A. CR 06: To provide(2)30°x 30°general purpose access doors with flange at either end of the exhibition hall to allow access to the existing piping for the hose bibb.......................Add $634.92 REDUCE SPECIFIED GENERAL ALLOWANCE rROM$5,274.00 TO$4,639.08, CONTRACT SUM REMAINS UNCHANGED, The original Contract Sum was $ 939,810.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 939,810,00 The Contract Sun will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 939,810.00 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be September 25,2020. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc. ISG Peters Construction Corporation City Waterloo_ _ ARCHITECT(Firm name) CO TRACTOR(Firm name) OWNER(Firm name) omrtin Hart SIGNATURE 91ONATURE SIGNATURE Nathan Compton,Architect/Project Bradley Best,President Quentin Hart,Mayor Manager PRINTED NAME AND TITLE PRINTEP NAME AND TITLE PRINTED NAME AND TITLE September 1,2020 _ A' 9/8/2020 DATE DAIV DATE AIA Document 0701'—2017.Copyright©1979,1997,2000,2001 and 2017 by 1ho American Institute of Architects.All rights reserved.The"American Institute of Architects,"`AIA,"the AIA Logo,and"AIA Contract Documents"are registered Iradernorks and may not he used without psrrnission.This document was produced by AIA software at 15;32:09 ET on 0 910 112 02 0 under Order No.6114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and moy only be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail copyrightaulo.org. User Notes: (3139ADA317)