HomeMy WebLinkAboutPeters Construction CO#5 - 5_Sull Bros Conv Cntr Exh Hall Ceiling 9.21.20 z bAIA Document G701 - — 2017
Change Order
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFOR TIONi
5 Sullivan Brothers Convention Center Contract For:General Construction Change Order Num er;005
Exhibit Hall Ceiling Renovation, Project No: 19-23188
Waterloo,IA.
Date:May 07,2020 Date:September 15,2020
OWNER:(Name and address) ARCHITECT:(Nance and address) CONTRACTOR:()Vame and address)
City of Waterloo I&S Group,Inc.(ISG) Peters Construction Corporation
715 Mulberry Street 314 East 4th Street 901 Black Hawk Road
Waterloo,IA 50703 Waterloo,IA 50703 PO Box 2940
Waterloo,IA 50704
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and,if applicable,attach or reference specific exhibits.Also include agreed upon adjustments
attributable to executed Construction Change Directives.)
A. CR 07: Cost to make the following changes: Provide and install(4) 120-volt,6.6 fpm,
10001b electric winches;install(4) 120-volt outlets in ceiling from panel P 1.
Each outlet on dedicated circuit;install(4)control stations in crows nest..........................Add$16,376.41
REDUCE SPECIFIED GENERAL ALLOWANCE FROM$4,639.08 TO ZERO.
INCREASE CONTRACT SUM BY$11,737.33.
The original Contract Sum was $ 939,810.00
The net change by previously authorized Change Orders $ 0.00
The Contract Stun prior to this Change Order was $ 939,810.00
The Contract Sum will be increased by this Change Order in the amount of $ 11,737.33
The new Contract Sum including this Change Order will be $ 951,547.33
The Contract Time will be unchanged by Zero(0)days.
The new date of Substantial Completion wilt be September 25,2020.
NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract
Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
I&S Group,Inc.(ISG) Peters Construction Corporation City of Waterloo
ARC ITECT(Firm name) CO RACTOR(Firm name) OWNER(Firm name)
Oy6nbn Hots
SIGNATURE SIGNATURE SIGNATURE
Nathan Compton,Architect/Project Bradley Best,President Quentin Hart,Mayor
Manager
PRINTED NAME AND TITLE PRINTED N ME AND TITLE PRINTED NAME AND TITLE
September 15,2020 ct bs-/-2o 2w 9/21/2020
DATE DATE DATE
AIA Document G7011'—2017.Copyright @ 1979,1967,2000,2001 and 2017 by The American institute of Architects.All rights reserved.The'Ameriran
Inslituto of Architects:"AIA,"the AIA Logo,and"AIA(intrad imutvnenw'are registered trademarks and may stet be used without permission.This document �
was produced by AIA software at 11:50:44 CT on 0911512020 under Order No.0114132283 which expires on 07/1212021,is not for resale,Is licensed for one-time
use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@sia.org.
User Notes: (3B9ADA3F)