Loading...
HomeMy WebLinkAboutAECOM Sup. Agmnt #1 - FY21 ALO Water Main Improvements, Cont No. 1033 - 10.19.2020 _ AECOM 319-232-6531 tel C0m Suite Sycamore Street 319-232-0271 fax Suite 222 Waterloo,Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA WATER MAIN IMPROVEMENTS - PHASE I WATERLOO REGIONAL AIRPORT CONSTRUCTION-RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated May 4, 2020, for design of the Waterloo Regional Airport Water Main Improvements, and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for providing construction-related services for Phase I of the project. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. Project Description The City of Waterloo is planning to install water main improvements at the Waterloo Regional Airport (ALO) to provide redundancy to the water system, enhance fire protection and to provide water for future development. The City is also planning to provide water service to the proposed Corporate Aircraft Hangar at ALO directly north of Betsworth Drive. Existing water lines in this part of the airport are undersized to properly provide fire flows. The proposed water main will tie into the existing 12-inch line on Midport Boulevard on the south and extend to the north past the new hangar to tie into an existing water main as part of the Phase I project. The purpose of this supplemental agreement is to provide construction-related services for the Phase I project. II. Scope of Services The Scope of Services will encompass and include detailed work, services, materials, equipment, personnel and supplies necessary to provide construction-related services. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Project Control b. Set Stakes for Construction Limits C. Set Stakes for Water Main Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. �L=C0m Page 2 Task 5. Prepare monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Provide weekly SWPPP reviews along with City of Waterloo and contractor personnel, as required by Iowa DNR and City of Waterloo. Task 10. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 11. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 12. Facilitate bi-weekly construction progress meetings of project and complete minutes for each meeting. Task 13. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 14. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 15. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project-related documents. Task 16. Provide the Client with a copy of revised drawings of the construction plans (record drawings)for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 17. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement. The estimated fee is Twenty-Nine Thousand Five Hundred Dollars ($29,500.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated May 4, 2020. �L=C0m Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES, IN By Date October 14, 2020 Douglas W. S hin el, P.E. Associate Vic resident APPROVED FOR CLIENT: By: ow tin -fart Mayor Date October 19, 2020 0:\Administration\AGREE\SUPPLE\SA1 ALO Water Main Impr CRS.docx