Loading...
HomeMy WebLinkAboutHuff Contracting, Inc. CO#1 Gates Maintenance Building 11.16.2020ttt� AIA Document G7OITM - 2001 Change Order PROJECT: (Name and address) CHANGE ORDER NUMBER: 01 Gates Park Maintenance Building TO CONTRACTOR: (Name and address) Huff Contracting Inc. 1310 Grandview Waterloo, IA 50703 DATE: June 2, 2020 ARCHITECT'S PROJECTNUMBER: 2019-0022 CONTRACT DATE: May 6, 2019 CONTRACT FOR: Waterloo Leisure Services City of Waterloo OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) The cost of over excavation/pad prep is $114.00 The original (Contract Sum) (G aranteed4xi xt-VtiEe) was The net change by previously authorized Change Orders $' 279,191 .00 $ 0 The (Contract Sum) teed_i x4 um-P-4i ) prior to this Change Order was $ 279,191 .00 The (Contract Sum) (Gttaraateed Maxix »t-Ii ) will be (increased) ( sr-Gased)-(rxashertge4) by this Change Order in the amount of $ 114.00 The new (Contract Sum) (fruazd Maxit tt t}, including this Change Order, will be $ 279, 305.00 The Contract Time will be (t;ase-,d)-(dccrreasg4) (unchanged) by The date of Substantial Completion as of the date of this Change Order, therefore, is June 2, 2020 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. ( 0 ) days. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Align Architecture Huff Contracting, & Planning ARCHITECT (Firm name) 327 E. 4th St.Ste. 204 Waterloo, IA 50703 ADDRESS ADDRESS Inc. B gnature) Larry Kurtz (Typed name) i i 4 - .ozb CONTRACTOR (Firm name) 1310 Grandview Waterloo, IA 50703 Jason Huff (Typed name) /--02� DATE DATE Waterloo Leisure Services City of Waterloo OWNER (Firm name) 715 Mullberry St. Waterloo, IA 50703:' ADDRESS ��ven^r�n Hr4 BY (Signature) Quentin Hart (Mayor) and/or Kelly Felchle (City Clerk) (Typed name) 11/16/2020 DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701TM — 2001. Copyright 31979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ton (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. 010711Ac444