Loading...
HomeMy WebLinkAboutKW Electric, CO#1 IDOT Proj No CS-TSF-8155(762)--85-07_11.23.2020&IOWADOT Fomi 831240 (08-18) Accounting ID No. (5-digit number): Contract Work Type: Contractor:KW Electric Inc CHANGE ORDER For Local Public Agency Projects No.: One Non-Substantia Substantial: n Administering Office Concurrence Date Project Number; CS-TSF-8155(762) 85 07 Local Public Agency: City of Waterloo Date Prepared; October 2, 2020 You are hereby authorized to make the following changes to the contract documents, A - Description of change to be made: I. Delete asphalt wedge; 2. Modify Lump Sum Signalization a. Replace the specified camera detection camera with an ITS camera; b. Delete painting of signal poles; c, Delete mast arm signing; d. Delete traffic signal loops; e. Delete two (2) loop handholes; f Add three (3) LED Red Bill Melt Smarts; 3. Delete pavement markings; 4. Delete Pavement Markings Removal. B - Reason for change: 1. This asphalt wedge was to provide transition from new pavement to greyhound pavement. However, Greyhound has been contracted to be overlaid at the same time as out project. The contractors have coordinated then' work. The wedge is no longer needed as the overlay will meet our project's new pavement. 2,a, '1'o improve detection and reduce unnecessary loop detectors. The specified detection system is a dome coiner -mounted single camera video detection. It can detect only 300 feet from the interscction. Dilemma zone advance detectors are placed farther than 300 feet. Using the dome camera requites installing detector loops to cover advance detection needs. The donne is not good at detecting a far lane when the near lane has a truck in it. Possible future adaptive operation requires detection at each individual lane. Mast arm pole mounted detection cameras to replace the single donne camera will have the ability to detect much farther back eliminating the need for loops. 2 b. Water loo poles are normally not painted. Waterloo uses painted poles within special enhancement corridors and in the downtown area. Paint was inadvertently left in the specifications from a previous project. 2.c. Mast arm signing can be done in-house to reduce project costs. The City a modern sign shop and can make all types of signs. 2.d. With new video detection system loops no longer needed, 2.c, Loop handholes not needed when loops are eliminated 2.f Three (3) snow melt LED red single solid ball signal heads (1 towards each approach) with snow/ice melt capability is a safety impt ovement 3. Markings can be done in-house to save project costs. Late fall/early winter and cold/wet weather pavement markings normally do not survive the winter. The City will probably have to redo the markings in the spring anyway. 4. Markings removal can be done in-house to save project costs. 5. Delete Item No, 15, Storm Sewer Manhole, SW-401, 48 in. and replace with two (2) 15" RCP prefabricated storm sewer bends. C - Settlement for cost(s) of change as follows with items addressed in Sections F and/or G: I. Delete asphalt wedge: Deduct $4,770.00 2.a. Replace specified camera detection: Deduct Lump Sum $10,000.00 2.b. Delete paint on signal poles: Deduct Lump Sum $5,000.00. Page 1 of 4 2.c, Delete Mast arm signing: Deduct lump sum cost of$1,000,00 Accounting ID No.(5-digit number): 2.d, Delete traffic signal loops: Deduct lump sum cost of $6,400.00 Change Order No.: 2.e. Delete 2 loop hand holes: Deduct lump sum cost of $1,500.00 2.f. Add three (3) LED led ball Melt Smaits: Add $900.00 3. Delete pavement markings: Deduct $21 14.00 4. Delete pavement markings removal Deduct $940,00 5. Delete Item No. 15, Storm Sewer Manhole, SW-401, 48 in., 2 each at $4,750.00/each and add two (2) 15" RCP prefabricated bends at a cost of $2,025.00/each D - Justification for cost(s) (See I.M. 3.805, Attachment D, Chapter 2.36, for acceptable justification): E - Contract time adjustment: Justification for selection: No Working Days added I Working Days added: I I Unknown al this time Page 2 of 4 eIOWA DOT rorm 831240 (08 18) F - Items included in contract: Accounting ID No.(5-digit number): Change Order No.: Participating For deductions "-x enter as xx" Federal- aid State- aid Number Line Item Description Unit .xx Price Quantity .xxx Amount .xx X 8 HOT (INCLUDES MIX ASPHALT ASPHALT MIXTURE, BINDER), COMMERCIAL AS PER PLAN MIX $2b5,00 -18.000 $4,770.00 X 15 STORM SEWER MANHOLE, SW-401, 48 IN. $4,750.00 -2 000 -$9,500.00 X 19 REPLACE CAMERA SPECIFIED WITH ITS CAMERA CAMERA DETECTION $10,000.00 -1.000 $10,000.00 X 19 PAINTING OF SIGNAL POLES $5,000.00 -1.000 -$5,000.00 X 19 MAST ARM SIGNING $1,000.00 -1.000 -$1,000.00 X 19 TRAFFIC SIGNAL LOOPS $6,400.00 -1.000 -$6,400.00 X 19 LOOP HAND HOLES $750.00 -2.000 -$1,500.00 X 20 PAINTED PAVEMENT MARKINGS $140.00 -15.100 -$2,114.00 X 21 PAVEMENT MARKINGS REMOVED $420.00 -2,200 -$924,00 TOTAL -$41,208.00 I Add Row ,; Delete:'Row„;:` G - Items not included in contract: ParticipatingFor deductions enter as "-x xx" Federal- aid State- aid Change Number Item Description Unit .xx Price Quantity .xxx Amount .xx Item Number X 1 2599-9999005 15' BENDS RCP PREFABRICATED $2 227 50 2,000 $4,455.00 X 1 19 SNOW HEAD MELT RED SIGNAL $300,00 3.000 $900.00 5,355 $5,355.00 ;i:.'Ad d Rpy!.:'::) ;;D eleteRow.. TOTAL Page 3 of 4 H. Signatures 14): ct.E1T Ht"FiKalk)b.; 4SSOC Approved by council 11/23/2020 CONTRACTOR PROJECT ENGINEER CITY OF WATERLOO Page 4 of 4