Loading...
HomeMy WebLinkAboutWoodruff Construction Amendment No. 1 - 5_Bros_Skywalk 12.7.20201-.:AIA Document G701 = 2017 Change Order PROJECT: (Nacre and address) 5 Sullivan Brothers Convention Center 2020 Skywalk improvements, Waterloo, IA. OWNER: (Name and address) City of Waterloo 715 Mulbeny Street Waterloo, IA 50703 CONTRACT INFORMATION; Contract For: General Construction Project No: 19-23770 CHANGE ORDER INFORMATION: Change Order Number: 002 Date: May 07, 2020 Date: November 24, 2020 ARCHITECT: (Nacre and address) 1 & S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CONTRACTOR: (Name and address) Woodruff Construction, LLC 1717 Falls Avenue Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS; (Insert a detailed description of the change and, if -applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. PR 06: Cost to replace the flashing at the underside where damage has occurred on both sides of the Skywalk. Replace with prefinished metal flashing the entire length of the Skywalk Add $14,195.00 REDUCE REMAINING BALANCE OF GENERAL ALLOWANCE FROM $1,151.00 TO ZERO. ADD TO (INCREASE) CONTRACT SUM THE REMAINING BALANCE OF $ 13,044.00. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be August 21, 2020. $ 199,890.00 $ 0.00 $ 199,890.00 $ 13,044.00 $ 212,934.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1 & S Group, Inc. (ISO) ARCHITECT (Finn name) SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE November 24, 2020 DATE Woodruff Construction, LLC CONTRACT City of Waterloo te) OWNER (Firin name) He,r^-II SIGNATURE SIGNATURE John Mallen, Project Manager PRINTED NAME AND TITLE November 24, 2020 Quentin hart, Mayor PRINTED NAME AND TITLE 12/7/2020 DATE DATE AIA Document G701" — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permtssron, This docnmeni was produced by AIA software at 14:55139 ET on 11/24/2020 under Order No.8114132283 which expires on 07/12/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA44) WOODRUFF CONSTRUCTION LLC 6 YEARS 1717 Falls Avenue $ Water,loo, IA 50701 Ph: (319) 233-3349 Fax: (319) 233-3369 November 17, 2020 RE: 5 Sullivan Brothers Convention Center Skywalk Improvements SUBJ: Proposal Request #6 — Commercial St. Lower Fascia Sheet Metal Replacement To whom it may concern, The following is our pricing per Pricing Request #6 and enclosed clarifications: Cost Breakdown D&G Metal replacement (quote & scope attached) = $11,950.00 Traffic Control = $ 600.00 Markup (10%) = $ 1,255.00 Insurance/Bond = $ 390.00 Subtotal = $14,195.00 Our total price to perform the changed work is an ADD of $14,195.00. Sincerely, WOODRUFF CONSTRUCTION, LLC Will McAllister, Project Manager Phone: 319-233-1920 November 4, 2020 Woodruff Construction ATTN: Will 0& G Meta! Works, Inc. Quotation: Five Sullivan Brothers Skywalk Fax: 319-233-1927 We propose to furnish material and labor for fabrication and installation of Roof related Sheet Metal as specified below: General notes: 1. Quotation includes Skinning over the Existing Fascia with New Fascia on Both sides at the bottom edge of the Skywalk installation and materials. Based upon approximately 300' of Fascia to Replace. 2. Quotation includes Removing the Caulk at the Windows and Re -Caulking the New Fascia installation and materials. 3. Quotation excludes any other sheet metal work not listed above. 4. Quotation includes taxes. Total Price for above specified sheet metal: Base Bid: Respectfully Submitted By, Doug DuBois Manager/ Estimator D & G Metal Works 2524 Wagner Road Waterloo, IA 50703 Ph: (319)233-1920 Fax: (319) 233-1927 Eleven Thousand Nine Hundred Fifty Dollars. $11,950.00 *ACCEPTANCE: C-Z,e4-I-;,1 DATE: 12/7/2020 *Subject to standard D&G Metal Works, Inc terms and conditions of sale. TERMS: NET PAYMENT DUE UPON DELIVERY, NET30 WITH APPROVED CREDIT, OR PRE-ARRAIN0ED CONTRACT AGREEMENT HAS BEEN EXECUTED. INTEREST PENALTY OF 1-1/2% PER MONTH TO ACCRUE ON AU. LATE PAYMENTS, OR MAXIMUM ALLOWED BY LAW. THIS PROPOSAL 15 VALID FORA PERIOD OF 30 DAYS FROM TILE ABOVE DATE AND SHALL BE NULL AND VOID AFTER THAT TIME. 2624 WAGNER ROAD WATERLOO, IA 60703 ARCHITECTURAL SHEET METAL FABRICATION R. INSTALLATION