Loading...
HomeMy WebLinkAboutAECOM - PSA FY21 E. Shaulis Rd Trail Extension, Cont. No. 1012 - 12.14.2020AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO, IOWA E. SHAULIS ROAD TRAIL EXTENSION, PHASE II TAP-U-8155(766)--8I-07 SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client), 715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street, Suite 222, Waterloo, Iowa, dated February 17, 2020, for construction of a 0.7-mile shared use path along either side of Shaulis Road from Cedar Terrace Drive to the Cedar Valley Nature Trail; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for construction - related services. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. Project Description This project includes the construction of a 0.7-mile shared use path along either side of Shaulis Road from Cedar Terrace Drive to the Cedar Valley Nature Trail. This 10' wide PCC shared use path will include a crossing of Foulk Road, culvert extensions, driveway modifications and erosion control. The project is anticipated to be constructed in the 2021 construction season. II. Scope of Services The Scope of Services will encompass and include detailed work, services, materials, equipment, personnel and supplies necessary to provide construction -related services for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Stakes for Temporary Easements at 100-foot Intervals b. Set Slope Stakes or Grading Stakes at 50-Foot Intervals c. Set Stakes for Drainage Structures d. Set Stakes at 25-Foot Intervals for Sidewalk/Trail e. Set Stakes for Sidewalk Compliance f. Set Stakes for Driveways g. Set Stakes for Removal and Replacement of Fence h. Set Stakes for Location of Signs Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare bi-monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. AECOM Page 2 Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Provide weekly SWPPP reviews along with City of Waterloo and contractor personnel, as required by Iowa DNR and City of Waterloo. Task 10. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 11. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 12. Facilitate bi-weekly construction progress meetings of project and complete minutes for each meeting. Task 13. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 14. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 15. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 16. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 17. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement. The estimated fee is Fifty -Nine Thousand Five Hundred Dollars ($59,500.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated February 17, 2020. AECOM Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By Date December 8, 2020 Douglas W. Schindel, P.E. Associate Vice President APPROVED FOR CLIENT: By: uCV2 �i l Ha r� O:\Administration\AGREE\SUPPLE\SA1 Wat Shaulis Rd Trail Ph II CRS.docx Date 12/14/2020