HomeMy WebLinkAboutCardinal Construction CO#1 - 5_Bros_Addition-Reno 12.21.2020Document G701 - 2017
Change Order
PROJECT: (Name and address)
Five Sullivan Brothers Convention Center
Addition and Renovation, Waterloo, IA.
OWNER: (Name and address)
City of Waterloo
715 Mulberry Street
Waterloo, IA 50703
CONTRACT INFORMATION:
Contract For: General Construction
Project No: 20-23943
Date: September 08, 2020
ARCHITECT: (Name and address)
I & S Group, Inc. (ISO)
314 East 4th Street
Waterloo, IA 50703
CHANGE ORDER INFORMATION:
Change Order Number: 001
Date: November 23, 2020
CONTRACTOR: (Name and address)
Cardinal Construction, Inc.
1246 Martin Road
Waterloo, IA 50701
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, camel: or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction Change Directives)
A. CR 01: Structural changes due to a difference of support at the existing structural overhang Add $12,939.00
TOTAL AMOUNT OF THIS CHANGE ORDER, ADD TO CONTRACT SUM $12,939.00.
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be unchanged by Zero (0) days.
The new date of Substantial Completion will be August 13, 2021
$ 5,516,300.00
$ 0.00
$ 5,516,300.00
$ 12,939.00
$ 5,529,239.00
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
1 & S Group, Inc, (ISO) Cardi al onstruction, Inc. City of Waterloo
T
.4
SIGNATURE SIGNATURE
Nathan Compton, Architect/Project Katy Susong, President
Manager
ARCHITECT (Firm name)
SIGNATURE
PRINTED NAME AND TITLE
November 23, 2020
DATE
CON
OR (Firm name)
OWNER (Firm name)
VCtie/i��/1 Her"-F 1,T.
Quentin Bart, Mayor
PRINTED NAME AND TITLE PRINTED NAME AND TITLE
November 24, 2020 12/21/2020
DATE DATE
AIA Document G701" —2017. Copyright O 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American
Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document
was produced by AIA software at 11:13:06 ET on 11/24/2020 under Order No.6114132283 which expires on 0711212021, is not for resale, is licensed for one-time
use only, and may only be used In accordance with the AIA Contract Documents"' Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (389ADA35)