HomeMy WebLinkAboutHR Green Supp Amnt #4 FY21 Shaulis Rd Reconstruction, Cont No. 1020 12.21.2020HRrn.1.
HR GREEN, INC.
PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 5
THIS AMENDMENT, made this 14th day of December 2020 by and between, City of Waterloo the
CLIENT, and HR GREEN, INC. (hereafter "COMPANY"), for professional services concerning:
Shaulis Road Additional Design Effort.
hereby amends the original Professional Services Agreement dated April 6, 2020 as follows:
The CLIENT and COMPANY agree to amend the Scope of Services of the original Professional
Services Agreement and previous amendments as follows:
See Attachment A
COMPANY Project Number: 190428.02
The CLIENT and COMPANY agree to amend other provisions of the original Professional Services
Agreement and previous amendments as follows:
N/A
In consideration for these services, the CLIENT AGREES to adjust the payment for services performed
by COMPANY on the following basis:
Per current rate schedule with the maximum fee to be increased by forty thousand Dollars ($
34,960.00)
The total authorized compensation after this Amendment, including the original Professional Services
Agreement and all previous Amendments, is seven hundred twenty-six thousand, seven hundred
twenty Dollars and seventy-five Cents ($ 726,720.75)
THIS AMENDMENT is subject to all provisions of the original Professional Services Agreement.
THIS AMENDMENT, together with the original Professional Services Agreement and all previous
amendments represents the entire and integrated AGREEMENT between the CLIENT and COMPANY.
THIS AMENDMENT executed the day and year written above.
City of Waterloo, Iowa HR GREEN, INC.
VC✓2iltiil Hc.r'T
Digitally signed by James E. Halverson
DN:C=US,Sdcom,al=Green,James C. Halverson
Inc.", OU=G,. Midwest, CN=James E. Halverson Date: 2020.12.14 20:10:57-06'00'
By: Quentin Hart, Mayor By: James E. Halverson, Vice President
December 14, 2020
Date: 12/21/2020 Date:
Version2.0 12172018
\\hrg reen.com\H RG\Data\2019\190428.02\Admi n\Contract\Client\Amend05\sa5-201209-WaterlooShau lisAdd itional Effort.docx
Contract Amendment 5 Attachments
Shaulis Road Preliminary and Final Design
HR Green #190428.02
Page 1 of 2
ATTACHMENT A - SCOPE OF SERVICES
The following tasks will be added to the Scope of Services to be performed by the COMPANY:
Due to funding obligations the need for the roundabout redesign for funding approval was identified, the following
task will accomplish this goal.
Task Y — ADDITIONAL DESIGN EFFORT
Perform the redesign of the roundabout (RAB) at the intersection of Shaulis Road and Hess Road.
Revised Final Design
The COMPANY will develop Final Plans for the project based on the Iowa DOT's On -Call Roundabout Review
Consultant's input and direction. This includes:
• Coordination with the Iowa DOT's On -Call Roundabout Review Consultant.
• Rework of the RAB approach legs in accordance with revised guidelines.
• Adjusting the width of the approach legs.
• Redesign of the bypass lane on the east leg of the RAB.
• Adjusting curb lines and islands.
• Updating the fastest path and turning movements throughout the RAB.
• Refine the modeling of the RAB and approach legs.
• Updating the trail alignment and ADA crossings through the approach legs.
• Update the grading limits and modify right of way takings and easements.
• Updating corresponding plan sheet information associated with the RAB redesign:
o B Sheets — Typical Sections
o C Sheets — Estimated Project Quantities
o D Sheets — E. Shaulis Road Plan and Profile
o E Sheets — Side Street Plan and Profile
o H Sheets — Right of Way and Easement Layout
o K Sheets — Roundabout Geometric Layout Plan
o L Sheets — Jointing and Staking Layout Plan
o M Sheets — Drainage Layout
o NP Sheets — Pavement Marking Layout Plan
o S Sheets — Sidewalk and ADA Curb Ramps (including compliance tables)
o T Sheets — Earthwork Quantity
o W Sheets — Mainline Cross -Sections
o X Sheets — Sideroad Cross -Sections
DELIVERABLES:
• Revised Final Plans
A-1
Contract Amendment 5 Attachments
Shaulis Road Preliminary and Final Design
HR Green #190428.02
Page 2 of 2
ATTACHMENT B - FEE AND SCHEDULE
PROFESSIONAL SERVICES FEE:
TASK Y: ADDITIONAL DESIGN EFFORT
HRG Labor HRG Expenses Subconsultants Extension
$34,960 $ 0.00 $0.00 $34,960.00
$ 34,960.00 $0 .00
$0.00 $34,960.00
A-2