Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Kidder Construction - CO #1 Truck Wash 1.19.21
""-AIA Document G701 � — 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION : CHANGE ORDER INFORMATION: Public Works Truck Wash Area Contract For: General Construction Change Order Number: 001 Improvements for the City of Waterloo, Project No: 19-23490 Iowa. Date: July 30, 2020 Date: December 3, 2020 DOWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) City of Waterloo I & S Group, Inc. (ISG) Kidder Construction, Inc. 715 Mulberry Street 314 East 4th Street 6036 Foulk Road Waterloo, IA 50703 Waterloo, IA 50703 PO Box 2242 Waterloo, IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) A. Box roof curb in lieu of rubber boot and clamp...... . .... ......... .. .. ..... ..... . .... ............... .. . . ........ .. .Add $ 1 , 137.93 B. To add a duplex outlet in the Mechanical Room on a separate circuit for future soap tank agitator.,,,,,,,"..... .. .... . ... . ... . $ 230.00 C. Add a hose bib in the Mechanical Room for future soap tank.,,,.,.. 0. .. .a....o'Add $ 240.06 D. Saw cut salt spray trench from 13' as shown on drawings to 23' long back to partition wall. Saw cut and chipped trench for piping..... . . ........... .. . . .. ..... .. . . . .. . . . . . ........ .. .. .....Add $ 462. 15 E. Cut off an existing heavy conduit and PVC piping. Ground surrounding concrete floor and filled holes with pour rock hydraulic cement., . , ot p000***d *4 **otoosood to so o4s000soososAdd $ 280.00 F. Add a hose bib in truck wash bay for area wash down, insulated..... .. ...... .. .. .. . .. .. .. . . ........ .. . ....Add $ 349. 13 G. Additional piping and supports for 14/2" drain line. Existing floor drain was in a different location than what was shown on drawings..... .. .. .......... .............. .. . .. .. .....................Add $ 611 . 16 TOTAL ADD $3,310.43 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $ 101000 TO $6,689,57. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was $ 302,574.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 3029574.00 The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 302,574.00 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be November 30, 2020. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, AIA Document G701 — 2017. Copyright ® 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA; the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document was produced by AIA software at 18:27:18 ET on 12/03/2020 under Order No.8114132283 which expires on 0711212021 , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of service. To report copyright violations, e-mail copydght@ala.org. User Nates: (3139ADA42) NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. 1&S Group, Inc. (ISG) Kidder Construction,Inc. City of Waterloo ARCHITECT(Firm name) CONTRA OR(Firm name) OWNER(Fit-in name) SIGNATURE SIGNATURE SIGNATURE Nathan Compton,Architect/Project Lonnie Kidder Manager Quentin Hart,Mayor 51��� PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE December 3,2020 6e(se/Y ZVZ_ LCJ &20 1/19/2021 DATE DATE DATE AIA Document G701——2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document 2 was produced by AIA software at 18:27:18 ET on 1210312020 under Order No.8114132283 which expires on 07112/2021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract DocumentsOl Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3139ADA42)