HomeMy WebLinkAboutVeith Construction Cont. No. 988 Final Qty Summary 1.19.21 CITY OF WATERLOO,IOWA
FINAL.QUANTIY SUMMARY
PROJECT: C.Y.2020 CARDINAL DR. DONALD ST, I.MUD LN,MAR'11N RD DRAINAGE IMPROVEMEN %
CONTRACT NO. 'q
Date Prepared:f anuary 5,2021 AMOUNT: $ 19 398.51 Decrease
TO: Vieth Construction Corp. Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform the
following extra work on your contract dated Se ternber 162019.
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering change or extra work:
As-built quantities varied for some bid items.
C. Settlement for cost of work to be made as follows:
Compensation already made to contractor through original bid items.
See attached summary,
Total Net Decrease $19,398.51
CITY OF WATERLOO
BY: G2„e F, , H"4 1/19/2021 Vieth Construction Corp.
Mayor Date CONTRACTOR }
BY:
Date
ATTEST: /�/ '
PRINTED NAME: /d^."7 I/!�
Kelle �elchle ( 1/19/2021
City Clerk Data
TITLE:
APPROVED:
ity Engineer Date
LYN
HOUR Wnm lVAURNIMMI
IRA H AN D OP. vIG'UMNaic5 QUAN1IfY
IIIJ4 J}ESGpO9ta1 mr •+ AumY MAMITy � IF DRIENDWI INL'DIVR
EARTHWORK, SUINURADF,AND SUBBASE
SINADNINCNEz .101111 • I+ nxif)
FA�VAVURXIAIPA 10 CY 41 MOO A 21 IS
INZ&VAINK CAP IS 10 DOIDOW CY 61 ON Ir US) 670) 1 (2 M 103
a xlcYCID)AMI IM,I ME SY is JIM s lam -Ma s 02")DPRSIOI N aSEWERS AND DRAINS
ORMSEWR
9 Ka"ARACH IF 14 low I 52M law
11 HIRE URDKH IT "I 234W 360 law I 4XIOG
Iz IF 416 4NOM a 420
13 NMII1 ., IxlNO1l is R A am s T]MMIS KCPAPRMIZIMII IA 1 2.0 1 Box
16 11CPAPROODINCH Ism i 672M
14
PIPECUILVERTS
CA I I'M • YIfW
DRDAI NS AND FOOD NO DRAIN CON V CTORS
IS IRRORMINOUnEaRINCII FA 5 SUN 5 low
M xl.ngvl.nN OIMSION 6.STYcfOREZ FOR SANITARY AND STORM SEWERS IF fD a" f +Sm .IM z OUR)
pOCTOACIFORSANNPRYANDSSORMSEWRS
21 MOMMOVERMANHOME,51M461 IA H 40f
IN f 4.10400
LAVISORNANDCOMENTCON RETEIPAVEMEM ANO pERTEDWDRR
24 MCPAWMIR111.61NICH IS 42" 1100) No 1 3161.00
37 MCPAVINIM71NOi ;y IN 16140 9 93W -lam S OMaaf
2A KCPAVEPWNM.FI,UMV,71MII IN 9A 940 S WIN
xr MCCURRANDOUTTRHOTMIRASPHAEIPANVEMFIIM � 5 Sam am" 5 i}M IM t hS SAME)
30
16 IMUFAVEMENS,5111061 veMaM alxcn
R
p o 11 VW a loom 2910 1 M700
� 1 1100 +a 5 amsY NO f av
11 PAIMEEIX . MAfMS DRRMAnnlnl alxcu MwT 7�
14
AL By SO 25110 A 17M 19.10
35 SY 247 25210 5 010 So 1 760
A, CURRANDGUIFINARL1,10VAL IF 0 pea Ir Ism am I "GO
n MAavALOPERROJIaMI IAAIDIVISIDNx-TMffl[ mXTROE IN Mx Saxm c aM
fz TLIVICRABLYINAMICCONTRIM. LN 1 10 r xuamW
DIVISION 9 .5I1E WORN AND IANDSMINs
SEWING
MUMIDU By IMU 12121 5 250 .132610
av I r IN WNDIND IA ff am IMM Am s (SLA")
EROSION ADD 5EDIMENT COMPROU.
41 TIONOMPLI MV. ECSIORMn1 .21610) 1 fsApW)
43 WAIIIJBrUEMOVAIIF IN loom a 40 100 1 200
46 CIAUDIUC�hItIff IN NPI 5 46M So 5 03 TO
PACHIMMATION
M000
+x 1,1011IMTAx1CM 1a I IM • TOI AI.OU.SMnTlf5 n10kxTMY.nT s Elk}vBSU
I xA WAxIRYnrr�Mr 5 ( }mill)
VnA11 ONSIM 14h
Av
This document was created by an application that Isn't licensed to use nov PD .
Purchase a license to generate PDF files without this notice,. _