Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cardinal Construction CO#2 - 5 Bros Addition Reno 02.01.2021
-ter DocuiU£nvird� , Cj,701 — 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:002 Addition and Renovation,Waterloo,IA. Project No:20-23943 Date:September 08,2020 Date:January 11,2021 OWNER:(Name and address) ARCHITECT:(Nance and address) CONTRACTOR:(Nati:e and address) City of Waterloo 1&S Group,Inc.(ISG) Cardinal Construction,Inc. 715 Mulberry Street 314 East 4th Street 1246 Martin Road Waterloo,IA 50703 Waterloo,IA 50703 Waterloo, IA 50701 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,if applicable,attach or reference specific exhibiu.Also include agreed upon adjustments attributable to executed Constnrction Change Directives.) A, CR 02: Per revised structural drawings;additional steel members at each corner of the existing roof framing........................................................................................................... ..Add $7,615.00 TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$7,615.00. The original Contract Sum was $ 5,516,300.00 The net change by previously authorized Change Orders $ 12,939.00 The Contract Sum prior to this Change Order was $ 5,529,239.00 The Contract Sum will be increased by this Change Order in the amount of $ 7,615.00 The new Contract Sum including this Change Order will be $ 5,536,854.00 The Contract Time will be unchanged by Zero(0)days. The new date of Substantial Completion will be August 13,2021. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc.ISG) IC". inal Construction,Inc. City of Waterloo ARCHITECT(Firer name) CTOR(Finn name) OWNER ffinn name) 51GNATURE SIGN URE SIGNATURE Nathan Compton,Architect/Project Katy Susong,President Quentin Hart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE January It,2021 January 11, 2021 2/1/2021 DATE DATE DATE AIA Document G701"—2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.Ail rights reserved.7 he'American Institute of Architects,""AIA,"Die AIA Logo,and"AIA Contract Documents"are registered trademarks and may riot be used without permission,This document was produced by AIA software al 13:20:18 B7 on 01/11/2021 under Order No.8114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3B9ADA34)