Kidder Construction CO #2 and #3 Truck Wash Project 02.01.2021
IA Change Order DocumentG701" - 2017 PROJECT: (Name and address) Public Works Truck Wash Arca improvements for the City of Watcrloo, Iowa. �l OWNER: (Name and address) City of Waterloo 715 Mulberry Street Watcrloo, IA 50703 CONTRACT INFORMATION: Contract For, General Construction Project No, 19-23490 Date: July 30, 2020 ARCHITECT: (Nwne and athfress) [ & S Group, Inc, ([SO) 314 East 4th Street Waterloo, IA 50703 • CHANGE ORDER INFORMATION: Change Order Number: 002 Date: January 13, 2021 CONTRACTOR: (Nacre and address) Kidder Construction, Inc, 6036 Noulk Road POBox2242 Waterloo, IA 50704 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description oldie change and, if applicable, attach or reference specific exhibits, Also include agreed upon adjnstrnenls attributable to executed Construction Change Directives) A. COR 02: For PR 01 - Material , labor & equipment to saw cut a 16" x 12" opening that the existing block wall Add $1,058.00 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $6,689.57 TO $5,631.57. CONTRACT SUM REMAINS UNCHANGED. The original Cantina Stun was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Stun will be unchanged by this Change Order in the amount of The new Contract Sulu Including this Change Orden will be The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be November 30, 2020. 302,574.00 0,00 302,574.00 0.00 302,574.00 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. I & S Group, Inc. ([SG) Kidder Construction, Inc. ARCHITECT (p'ilm name) CONTRA, OR (Finn name SIGNATURE S NAT I RE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE January 13, 2021 DATE Lonnie Kidder City of Waterloo OWNER (Firm iwine) Os ,e,'rki He,r 4 SIGNATURE blecide4 f uentin Hart, Mayor PRINTED NAME AND TITLE /4,5/kt DATE DATE PRINTED NAME AND TITLE 2/1/2021 AIA Document 13701" -- 2017. copyright © 1979,1987, 2000 , 2001 and 2017 by The American Institute of Architects, All rights reserved, The "American Institute of Architects; 'AIA,' the AIA Logo, and 'AIA Contract Documents` are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:08:12 ET on 01/13/2021 under Order No.0114132283 which expires on 07/12/2021, is not for resale, Is licensed for one-11me use only, and may only be used In accordance wllh the AIA Contract Documentst Terms of Service. To roport copyright violations, e-mail copyright@ala.org, Usor Notes: (3B9ADA3A) AM. Document G7Of 2017 Change Order PROJECT: (Name and hddress) Public Works Truck Wash Aron hnprovcments for the City of Waterloo, Iowa, OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 CONTRACT INFORMATION: Conhact For; General Construction Project No. 19-23490 Date: July 30, 2020 ARCHITECT: (Name and udrlress) I & S Group, Inc. (ISG) 314 East 4th Street Waterloo, IA 50703 CHANGE ORDER INFORMATION: Change Order Number; 003 Date: January 13, 2021 CONTRACTOR: (Name and address) Kidder Construction, Jac. 6036 Foulk Road PO Box 2242 Waterloo,.JA 50704 THE CONTRACT IS CHANGED AS FOLLOWS; (Insert a detailed description tithe change and, if applicable, attach or reference specific exhibits. Also include agreed upon ar(/usimenls attributable to executed Construction Change Directives) A: COR 03: Cost to remove Schedule 80 PVC waterline, Reroute and change to a Schedule 40 galvanized waterline Add $2,996.90 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $5,631.57 TO $2,634.67. CONTRACT SUM REMAINS UNCHANGED. The original Contract Sum was $ 302,574.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 302,574.00 The Contract Sum will be unchanged by this Change Order in the atnoun of $ 0.00 The new Contract Sun Including this Change Order will be $ 302,574.00 The Contract Tirne will be unchanged by Zero (0) days. The new date of Substantial Completion will be November 30, 2020. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maxlmutn Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Other and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1 & S Group, Inc. (ISO) • Kidder Construction, Inc. City of Waterloo ARCHITECT (Finn ,name) 'CONTRACTOR (Firm name) SIGNATURE SIGNATURE Nathan Compton, Architect/Project Manager PRINTED NAME AND TITLE January 13, 2021 DATE Lonnie Kidder 3°/esic/Fi, 7`" PRINTED NAME AND TITLE rZek5/2/ DATE OWNER (Flinn name) feleg(t, G&e_ in HAr4 SIGNATURE Quentin Hart, Mayor PRINTED NAME AND TITLE 2/1 /2021 DATE AIA Document G701"-- 2017, Copyright ®1979, 1907, 2000 , 2001 and 2017 by The American Institute of Architects, Alt rights reserved. The "American Institute of Architects,"'AIA; the AIA Logo, end' AIA Contract Documents' are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:24:02 ET on 01/13/2021 undor Ordor No.8114132283 which expires on 07/12/2021, is not for resale, Is licensed for one-time use only, and may only be used In accordance with the AIA Contract Documents° Terrns of Service. To report copyright violations, e-mail copyright@ala.org. User Notes: (3B9ADA37)