CITY OF WATERLOO, IOWA
CEDAR RIVER MARINA DISTRICT
PHASE II - FINAL DESIGN AND SITE DEVELOPMENT
SUPPLEMENTAL AGREEMENT NO. 1
WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo (Client),
715 Mulberry Street, Waterloo, Iowa, and AECOM Technical Services, Inc. (ATS), 501 Sycamore Street,
Suite 222, Waterloo, Iowa, dated May 20, 2019, for redevelopment of the area between River Road, West
Commercial Street and the Cedar River as the Cedar River Marina District; and
WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for final design,
preparation of construction documents, and bidding services for completion of the project and continued
site development work for the Cedar River Marina District.
NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows:
I. PROJECT DESCRIPTION
The project includes redevelopment of the area between River Road, West Commercial Street and
the Cedar River as the Cedar River Marina District. It is anticipated this project will include several
commercial and/or residential buildings, parking areas, river docking areas and amenities to create
new and unique downtown lifestyle opportunities and improved river access for downtown
Waterloo. The project will include connections to the recreational trail system in addition to
coordinating with the Black Hawk County Water Trail Master Plan.
Services to be provided under this agreement include final design and bidding services for
completion of Iowa DOT Project TAP-U-8155(768)--81-07 and continued site development work for
the Cedar River Marina District. Future phases would include required design services to complete
final plans and specifications for additional construction packages and construction-related
services, which will be determined at the time the services are needed.
II. SCOPE OF SERVICES
The Scope of Services for Phase 11 of the Cedar River Marina includes final design of the sidewalks
and multi-use path along River Road and continuing down the Cedar River Levee providing access
to the river. This project also includes construction of kayak docking system in the Cedar River,
along with channel excavation to provide access to the docking area. In addition, final design of
colored pavement infill, parking lot and sidewalk lighting, landscaping and a small parking lot area
will be completed. These items will be included in a bid package for an Iowa DOT letting, and will
be funded in part by the TAP funds obtained by the City. This Scope of Services also includes
continuation of conceptual design of the Cedar River Marina District in anticipation of private
development in the area. The Scope of Services is further defined by the following tasks:
Final Design of TAP Project
Task 1 - Sidewalk and Multi-Use Path Design. This task will include design of new sidewalk and
multi-use path along River Road and along the Cedar River Levee, extending to the river's edge.
This will include a decorative plaza area at the junction of the existing trails and the new connection
to the Cedar River. This will also include design of colored concrete in-fill between the existing
shared-use path and River Road. A portion of this work will be completed by Ritland+Kuiper
Landscape Architects.
�L=C0m Page 2
Task 2 - Stairwell Design. This task includes design of stairs and handrails connecting the new
plaza area to the trail connecting to the river's edge.
Task 3 - Combined Sidewalk and Retaining Wall. This task includes design of the combined
sidewalk and retaining wall system that will be used to construct the trail to the river along the
existing Cedar River flood protection levee.
Task 4-Concrete Docking Area. This task includes design of concrete structure to be constructed
at the base of the existing Cedar River Levee, and provide for a kayak and canoe launching area,
as well as mooring points for motorboats on the Cedar River.
Task 5 - Kayak/Canoe Launches. This task includes selection of commercially available
kayak/canoe launch systems to be installed within the concrete docking area. These launch
systems will be reviewed with city staff to determine the features to be included. The desired
system will be specified in the plans and included to be installed as part of the bid package.
Task 6 - Channel Excavation. This task includes design for excavation of a channel in the Cedar
River to allow for an approximately 50' wide x 4' deep channel for boaters to access the proposed
docking area.
Task 7 - River Modeling. This task includes hydraulic modelling of the proposed improvements
and submittal of a no-rise determination using the existing Cedar River HEC2 model to verify the
proposed improvements can be constructed within the floodway of the Cedar River. The planned
improvements will be modeled and adjusted as needed to confirm a no-rise can be achieved.
Task 8- Parking Lot. Included in this task is the design of concrete parking area for approximately
15 vehicles and associated service drives.
Task 9-Street and Pedestrian Lighting. This task includes design of pedestrian lights along River
Road and parking lot lighting for proposed parking area.
Task 10- Permitting and Coordination. This task includes coordination and submittal of permits for
construction of the project. Section 404 and 408 permits are anticipated to be required from the
U.S. Army Corps of Engineers (USACE) and a Flood Plain Permit will be required from the Iowa
Department of Natural Resources (IDNR).
Task 11 —Landscaping. This task includes preparation of final landscaping plans and streetscaping
layouts for the proposed project. A portion of this work will be completed by Ritland+Kuiper
Landscape Architects.
Task 12- Utility Modification. This task includes review of existing utilities and developing removal
or relocation plans to accommodate the proposed plans. This task will also include review of
potential modifications to the utilities that could be made during this stage of work to accommodate
future development of the area.
Task 13 - Environmental Compliance. This task includes development of a Soil Groundwater
Management Plan to ensure the proposed project is completed in accordance with current EPA
requirements and the existing covenant restricting activities on this site. A portion of this work will
be completed by Terracon Consultants, Inc.
Task 14 - Soil Borings. This task includes soil borings and geotechnical analysis of the site to
provide recommendations for subgrade treatment. A portion of this work will be completed by
Terracon Consultants, Inc.
Task 15 - Final Plans and Specifications. Final plans for the project will be completed in a format
suitable for an Iowa DOT letting.
�L=C0m Page 3
Task 16- Cost Estimates. This task includes preparation of cost estimates for the project.
Task 17 - Quality Control. This task consists of a quality control review of the plans by senior staff
engineers prior to submittal to the City.
Site Development - Marina District
Tasks 18-24 - Conceptual Design. This task will include continued conceptual site design for the
project development area. Previously developed concepts developed for the project along with
new conceptual layouts will be incorporated into this work to develop a plan for use of this space.
This work will be completed in conjunction with the City of Waterloo and their consultant,
Vandewalle and Associates. A portion of this work will be completed by Ritland+Kuiper Landscape
Architects. Specific elements of this conceptual design include:
Task 18 Proposed buildings will be shown within the development areas.
Task 19 Proposed parking areas and access points will be developed in accordance with City
zoning requirements and as needed for development of area.
Task 20 Proposed sidewalks, trails and plaza areas will be shown. Designs will be completed
in accordance with City and ADA requirements.
Task 21 Proposed streetscaping and landscaping conceptual design will be developed.
Portions of this work will be completed by RKLA.
Task 22 Pedestrian lighting concepts and electrical services for plaza areas will be developed.
Task 23 Proposed utility connections will be shown for proposed buildings.
Task 24 Storm Water Management. Conceptual design for storm water management will be
completed for the development area. This task will include review of best management
practices for storm water detention and treatment of storm water on-site prior to
release. This task will include project reviews with City staff to ensure compliance with
applicable City standards.
Task 25 - Environmental Constraints. Conceptual designs for development in this area will be
reviewed based on current EPA regulations and the existing Environmental Covenant that restricts
activities in this area. Portions of this task will be completed by Terracon Consultants, Inc.
Task 26- Presentation Graphics and Grant Assistance. Presentation graphics will be prepared for
use in grant applications and presentations to local groups. Assistance will be provided in the
preparation of funding grants for project, including cost estimating.
Task 27- Proiect Meetings. This task includes project meetings and presentations, as required.
Task 28 - Proiect Administration. This task includes project administration, coordination and
internal meetings throughout the project development.
Exclusions
The following tasks are specifically excluded from the Scope of Services, but may be added by
supplemental agreement, if desired:
• Building Design
• Utility Service Sizing
• Environmental Testing
• Final Construction Documents other than TAP Project
• Construction-Related Services
�L=C0m Page 4
III. COMPENSATION
Compensation for the above services will be on an hourly basis in accordance with Part VI of the
original agreement and shall be integrated with the fees in the original agreement. The estimated
fee is One Hundred Twenty-Nine Thousand Eight Hundred Dollars ($129,800.00) as shown below:
Final Design of TAP Project $ 81,400.00
Site Development Marina District 48,400.00
Total $129,800.00
IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in
the Professional Services Agreement dated May 20, 2019.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the
dates shown below:
AECOM TECHNICAL SERVICES, INC.
Byv Date February 3, 2021
'InDouglas W. Scgl '�al
el, P.E.
Associate Vice President
APPROVED FOR CLIENT:
By: 0" 14'^ H-4 Date 2/15/2021
0:\Administration\AGREE\SUPPLE\SA1 Wat Cedar River Marina Ph Il.docx