Loading...
HomeMy WebLinkAboutJ. F. Brennan Company - Final Quantity Summary 02.15.21CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: FY 2020 Cedar River Bladder Dam Repairs Date Prepared: October 13, 2020 AMOUNT: $ 1,922 Decrease TO: J.F. Brennan Company, Inc. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 11/18/2019 A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid items. See attached summary. CITY OF WATERLOO BY: Total Net Decrease -$ 1,922.00 2/15/2021 J.F. Brennan Company, Inc. Mayor ATTEST: Date CONTRACTOR Kelley 2/15/2021 City Clerk Date BY: PRINTED NAME: TITLE: 01/26/2021 Date Tina Klinger CFO APPROVED: ity Engineer Date FINAL QUANTITY SUMMARY CEDAR RIVER BLADDER DAM REPAIRS CITY CONTRACT NO. 996 AECOM PROJECT NO. 60612964 Item No. Item Unit Unit Price Contract Quantity Final Quantity Quantity Difference Increase/ Final Amount Decrease 1 3/4" ELBOW, SCH 40, BRASS EA 272.00 5.00 5.00 - - 1,360.0 2 3/4" NPT TO 3/4" HOSE BARB, BRASS EA 272.00 5.00 5.00 - - 1,360.0 3 3/4" WORM DRIVE HOSE CLAMP, STAINLESS EA 68.00 20.00 20.00 - - 1,360.0 4 3/4" HOSE INSERT, STAINLESS. 24" LENGTH EA 272.00 5.00 5.00 - - 1,360.0 5 3/4: HOSE, EDPM, POLYESTER REINFORCED, 26" LENGTH EA 272.00 5.00 5.00 - - 1,360.0 6 3/4" NPT TO 3/4" HOSE BARB, STAINLESS EA 272.00 5.00 4.00 (1.00) (272.00) 1,088.0 7 3/4" DIA X 1" LONG PLASTIC TUBE EA 272.00 5.00 5.00 - - 1,360.0 8 8" WIDE BY 110"+/- RESTRAINING STRAP EA 400.00 10.00 9.38 (0.63) (250.00) 3,750.0 9 BLADDER LEAK REPAIR EA 350.00 5.00 1.00 (4.00) (1,400.00) 350.0 10 AIR PRESSURE TESTING LS 25,000.00 1.00 1.00 - - 25,000.0 14 cMInD.r CBffERDAA4 TON 1,112.^0 9000 (90.00) 42 cO T RnAM PU 4PING K 100;0B0s00 1.OB -4140) 43 CK -1307130 .01.00 14 TRAFFIC CONTROL LS 10,000.00 1.00 - 10,000.0 15 MOBILIZATION LS 112,000.00 1.00 1.00 - - 112,000.0 Original Contract 160,348.00 (1,922.00) Change Orders 44 T^N (9D^n) -A.ao 1-2 ADD DIVE INSPECTION LS 20,000.00 1.00 1.00 - - 20,000.0 1-3 ADD TREE REMOVAL LS 5,000.00 1.00 1.00 - - 5,000.0 k3 -400000:00 - DELETE"OJ+ERDA`-PUMPMJG -24 -(4700) 2-2 t--P'MT'�U QC --200.00 2-3 DAM ACCESS LS 10,000.00 1.00 1.00 - - 10,000.0 2-4 ADD BAY 1 AND 2 INSPECTION IS 25,000.00 1.00 1.00 - - 25,000.0 2-5 BID BOND CREDIT LS (21000.00) 1.00 1.00 - - (2,000.0) TOTAL (1,922.00) 218,348.00 Pay Estimate tt1 Pay Estimate #2 Total All Payments Original Contract Amount Change Order#1 Change Order ill Increase/Decrease Change Order Final Contract Amount 207,430.60 10,917.40 218,348.00 388,350.00 (75,0B0.00) (93,000.00) (1,922.00) 218,398.00