Loading...
HomeMy WebLinkAboutPeterson Contractors CO#1 Cont. No. 979 02.15.21 jesiw CITY OF WATERLOO,IOWA CHANGE ORDER NO. 1 PROJECT: Airline Highway Sanitary Sewer Extension CONTRACT NO. 979 Date Prepared: 1/25/2020 AMOUNT: Increase $19,211.50 TO: PCI Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated 1/1812020. A. Description of change to be made or extra work to be done: Add Item CO 1.1:8" Wattle Installation Add Item CO 1.18" Wattle Maintenance Add Item CO 1.3:8" Wattle Removal Add Item CO 1.4:Recycled Special Backfill Add Item CO 1.5:1.8" RCP B. Reason for ordering change or extra work: All items will be paid per unit cost as measured in the field. Items 1-3 have been included to provide site erosion control devices. Item 4 has been included in order to facilitate compaction under an existing driveway which also includes multiple utility crossings, Item 5 has been added for a field access culvert. C. Settlement for cost of work to be made as follows: Add Itern CD 1.1:8"Wattle Installation x 800 LF at$3.60/LF=+$2,880.00 Add Item CO 1.2:8" Wattle Maintenance x 800 LF at$4.15/LF= +$3,320.00 Add Item CO 1.3:8" Wattle Removal x 800 LF at$0.55/LF=+$440.00 Add Item CO 1.4; Recycled Special Backfill x 518 TN at$19.25/TN=+$9,971.50 Add Item CO 1.5:18" RCI'x 40 LF at$65.00/LF=+$2,600.00 Total Net Increase $19,211,50 CITY OF WATERLOO, IOWA BY: 0,e, ;^ 2/15/2021 fir!e rso n Conira Ctu r s Inc Mayor Date COJT� BYc(, Date ATTEST: Kelley �elchle 2/15/2021 PRINTED NAME: Cardel 4 Q P{fit Soh City Cleric Date TITLE: presiderit APPROVED: ity Engineer Vate