HomeMy WebLinkAboutCardinal Construction - CO#1 5 Sullivan Bros. - 3.15.2021 ,titrAIA Document 6701Pv 2017
Change Order
PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
Five Sullivan Brothers Convention Center Contract For:General Construction Change Order Number:005
Addition and Renovation,Waterloo,IA. Project No:20-23943
Date:September 08,2020 Date:March 2,2021
OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address)
City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc.
715 Mulberry Street 314 Bast 4th Street 1246 Martin Road
Waterloo,IA 50703 Waterloo,IA 50703 Waterloo,fA 50701
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the charge and,ij'applicable,attach or reference specifle exhlhitr.Also include agreed rrpon adjrrstmrents
attributable to executed Construction Change Directives)
A. COR 03: Cost for additional framing/drywall at stairs to enclose..........................................Add $ 185.50
B. COR 04: Credit to Owner to change soffit panels in Concourse 118 to
Designer White plastic laminate in lieu of Solieor due to availability..................Deduct ($3,559.44)
C. COR 05: Per the Owner's request,door hardware changes.....................................................Arid $3,815.00
TOTAL ADD $ 441.06
TOTAL AMOUNT OF THIS CHANGE ORDER,ADD TO CONTRACT SUM$441.06.
The original Contract Sum was $ 5,516,300.00
The net change by previously authorized Change Orders $ 110,188.00
The Contract Sum prior to this Change Order was $ 5,626,488.00
The Contract Sum will be increased by this Change Order in the amount of $ 441.06
The new Contract Sum including this Change Order will be $ 5,626,929.06
The Contract Time will be unchanged by Zero(0)days.
The new date of Substantial Completion will be August 13,2021.
NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract
Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
I&S Group,Inc.(ISG) Cardinal Construction,Inc. City of Waterloo
ARCHITECT(Finn nanre) C ACTOR(Firer name) OWNER(Firirr name)
IAI
/V
SIGNATURE SIG ATURE SIGNATURE
Nathan Compton,Architect Katy Susong,President Queutin Marl,Mayor
PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE
March 2,2021 March 2,2021 3/15/2021
DATE DATE DATE
AIA Document 0701"—2017.Copyright®1979,1987,2000,2001 and 2017 by The American Institute of Architocts.All rights reserved.The"American
Institute of Architects,"A1A,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may riot be used without permission.This document
was produced by AIA software at 12:01:42 ET on 03102!2021 under Order No.8114132283 which expires on 07/1212021,is not for resale,is licensed for one-time
use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org.
User Notes: (3139ADA31)