HomeMy WebLinkAboutKidder Construction, Inc. - CO#4 Truck Wash - 3.15.2021 � r�
Document G701 - 2017
Change Crater
PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION.
Public Works Truck Wash Area Contract For:General Construction Change Order Number:004
Improvements for the City of Waterloo, Project No. 19-23490
Iowa.
Date:July 30,2020 Date:February 24,2021
OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address)
City of Waterloo I&S Group,Inc.JSG) Kidder Construction,Inc.
715 Mulberry Street 314 East 4th Street 6036 Foulk Road
Waterloo,IA 50703 Waterloo,IA 50703 PO Box 2242
Waterloo,1A 50704
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and,if applicable,attach or reference specific exhibi4s.Also include agreed upon adjustments
attributable to executed Construction Change Directives)
A. Credit to Owner for remaining balance of unused General Allowance...................................Deduct ($2,634.67)
TOTAL AMOUNT OF THIS CHANGE ORDER,DEDUCT FROM CONTRACT SUM($2,634.67).
The original Contract Sum was $ 302,574.OU
The net change by previously authorized Change Orders $ 0,00
The Contract Sum prior to this Change Order was $ 302,574.00
The Contract Sum will be decreased by this Change Order in the amount of $ 2,634.67
The new Contract Sum including this Change order will be $ 299,939.33
The Contract Time will be unchanged by Zero(0)days.
The new date of Substantial Completion will be November 30,2020.
NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract
Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER,
I&S Group,Inc.(ISG) Kidder Construction Inc. City of Waterloo
ARCHITECT(Firm name) CONT�5CTOR(Fire:name) OWNER(Firm name)
SIGNATURE SIGNATURE SIGNATURE
;Lathan Compton.ArchitectJProject Lonnie Kidder Quentin Hart,Mayor
Manager A'v S"d"61 _
PRINTED NAME AND TITLE PRINTED NAME AND TITLE � PRINTED NAIVE AND TITLE
February 24,2021 3/15/2021
DATE DATE DATE
AIA Document G701"—2017.Copyright®1979,1987,2000,2001 and 2017 by The American Institute of Architects.Al rights reserved.The"American
Institute of Architect5;"'AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document
was produced by AIA software at 14:50:00 ET an 92124/2921 under order N0.81 14132283 which expires on(17/1212021,is not for resale,is licensed for one-time
use only,and may only be used in accordance with the AIA Contract❑ocumentse Terms of Service.To report capyright violations,e-mail copyright@aia.org.
User Nates: (389ADA34)