Loading...
HomeMy WebLinkAboutMunicipal Pipe Tool Co., FY20 CIP Pipelining, Phase IVA, Cont. No. 1014_ 4.5.2021 AECOM AECOM 319-232-6531 fel 501 Sycamore Street 319-232-0271fax Suite 222 Waterloo,Iowa 50703 www.aecom.com March 10, 2021 Mr. Brian Bowman Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa, 50702 Subject: FY 2020 CIP Pipelining Phase IVA Change Order No. 1 City of Waterloo, Iowa City Contract No. 1014 AECOM#60620183 Dear Mr. Bowman: Attached is Change Order No. 1 for the FY 2020 CIP Pipelining Phase IVA. This change order is to reconcile the final quantities to proceed with final payment. AECOM has reviewed the work described in this change order. We recommend that the City of Waterloo approve Change Order No. 1 for the project deduction of$2,922.67. The total contract will be$770,193.83. Yours sincerely, Christopher G. Oelkers, P.E. Enclosure: Change Order No. 1 Tabulation and Signature Form Change Order No. 1 Tabulation P:\60620183\600_Construction_Support\670_Change-Orders\CO NO.Mat CIPP PH IVA-Change Order No 1 LTR.docx CHANGE ORDER NO. 1 Owner City of Waterloo Date: March 10,2021 Project FY 2020 CIP PIPELINING PHASE IVA Owner's Contract No. 1014 Contractor: Municipal Pipe Tool Co.LLC Date of Contact Start 14-Apr-20 Contract Amount: $ 773,116.50 You are directed to make the following changes in the Contract Documents. Description: ALLI QUANTITY RECONCILIATION $ (2,922.67) TOTAL $ (2,922.67)1 DEDUCTION Reason for Change Order QUANTITY RECONCILIATION-See the attached AECOM Change Order No.1 Tabulation CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 773,116.50 Original Completion Date: 9/25/2020 Previous C.O.s(ADD/DEDUCT) $ - This C.O.(ADD/DEDUCT) $ (2,922.67) Revised Completion Date: 3/10/2021 Contract Price with all approved $ 770,193.83 Change Orders: $ (2,922.67) -0.38%Total Change Order Percentage It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein, including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: 4/5/2021 Owner(Authorized Signature) Date ACCEPTED: BY: �lN wC�A March 10,2021 Contractor(Authorized Signature) Date ACCEPTED: BY: March 10,2021 AECOM Date AECOM 60620183 I 1 Project No. C.O.No. Project Change Order No. 1 FY 2020 CIP PIPELINING PHASE IVA AZCOM City of Waterloo City Contract No.1014 ORIGINAL CONTRACT DATES REVISED CONTRACT DATES AECOM Project No:60604454 ISUBSTANTIAL COMPLETION I NONE SUBSTANTIAL COMPLETION No Change Wednesday,March 10,2021 IFINAL COMPLETTION 09/25/20 IFINAL COMPLETTION 03/10/21 Bitl -Sn Ortler N..1 DESCRIPTION UNIT QUANTITY ODANTITY UNIT PRICE AhIOUNT BASE BID LlnmgLF 0 6 $ 3 $ e 8 114 525 DD vlpe ening 350A $ 22.00 8 $ 0 8 PPlpa UNM LF 9750 $ 28.00 8 $ 28.00 $ 36640 P Pipe Lining 1 5740 $ 47.00 $ 2697800 57D 71 $ 67.00 $ 2,623.37 1560 $ 40.06 8 194.60 $ 60.06 $ 7,766.00 b ting EA 1560 $ 30000 8 $ 30000 $ 40,200.06 ehE-V' $ 0.75 8 $ 0.75 $ 9,543.75 laing-t0' $ 0.75 8 $ 0.75 $ 3,413.10 lamg-- LF 9 $ 0.75 $ $ 0.75 $ 1,460.10 lamg-18' ,ieeo $ 0.75 $ $ 0.75 $ 956.05 11 ryp Ae1Rpe Cleaning-B" LF 33870 $ 225 8 $ 225 $ 14,39325 T­A Rpe Cleaning-10' LF 3500 $ 225 8 $ 225 $ 5,170.50 TypaA Pi C-Mg-12 LF 9750 $ 225 $ $ 225 $ -o600 Typa A Pipa C-Mg-18' LF 5740 $ 27$ a 1 r57.50 00 $ 27$ $ 1,59225 IS Typa C Ram Removal-e^ LF 4r368 0 $ 1 DD 11 4 36800 1'- $ 1 DD $ 1.066.00 A Typa c Rpm Removal-10 $ 1e s NI TypaC Rpm-.11-12-16° LF 0 $ 1 48700 o $ 1e s 17 Typa C Rpm Remolal-18 $ 1 28700 o $ 1e s Type D wmba k-V'-10' LF 4 368 $ 1 D0 5 $ 0 $ 4,17200 BA type D wmba k-V'-10' 1, 1,472 D3 $ 1e 5 1,47200 T­D wmba k-12-16' 1 $ 1 DD s $ 1e $ 980.00 rype D wmba k-18' LF 2870 $ 1 De s $ 1e 5 32800 21 meing Tape Removal EA 1000 $ 6 8 $ e 5 322.00 mney Seal EA 0 $ 315 O6 8 $ 315 Oe $ 16,380.06 -J.ht EA 29U $ 6 8 $ e $ 13280.06 �e 280 $ o $ 32 56 23 DO $ o $ 26, 600 120 $ e 8 $ 367 5e $ 4,41000 EA 40 $ 0 8 $ 0 8 ALTERNATEBID NO.1 ming 881 00 $ e 5 $ e $ gl a2' LF 1,76200 $ 0 8 1 $ 0 $ 28394 .4 .60 2 ryp Ae1Rpe viainCleaning-a2' 88100 $ 0 $ 8]400 $ 5. $ 4,37060 3 rype C Rpm Removal-a2 LF 22030 $ 6 8 450.00 $ 1D DO 5 4,50066 w rype D wmba k-a2 LF 22030 $ 1 D UD 8 n600 $ e 5 7,750.00 By-Paaa PumpingLF 100 $ 25,060.06 $ 2500000 1.00 $ 25 GOO DO 5 25,000.00 1.oe $ 11D00.0. a 1.0o $ o s BID ALTERNATE NO.2 Oh- mingLF 7580 $ 66.06 E 48r512 00 3]]29 $ e E 24 14P 56 IP81pz Lmm' 5E 275 7� $ 73.00 8 $ 730D $PIP amg 1 $ 0.75 a $ U7 a 03 T­Ae1Rpe Cleaning-16'-21" $ 225 8 U $ 22S 8 2 5P3 DD w Typa c Rpm Removal-1d'11'' 164?. $ "Do $ o.00 $ 5 U. $ 08 Typa D L-ba k-1 -zr• LF loon $ 60. E s0000 o..o $ 5 U. $ $ 773,116.50 ORIGINAL CONTRACT $ 773,116.50 CO N0.1 $ (2.922.6]) ALL CHANGE ORDERS $ (2,922.6]) REVISED CONTRACT $ ]]0,193.83 PROJECT CONTRACT CHANGE -0.38% (AJ 0f3"`"-t'-&' �saa a�aesaw�al a aeru�aernala..a Ntne mdalwre. a y„d pe o�aspe aw�ana lnatle o oiazl 1-: 7911111 7 ,a` ivll ^I.Pim eap Mpapre Ppa Tpo C.,LLC as say l��aaaa m�eaa aam a0e�ameerel zpzl o'.. ._ ulnarzl Ov1az1 Cnri-pner G.Oelkers,AECOM,Project EnP-r Oe1e -R-EN..-ERS PEL....a2.. Dae G21,e���„ Hu�� � P.geapranemarmam4b,mlasaal. �LLPA�Es J oa Qty cpntmm rvo.1014 Dale- P18056z3TT60._Cpna d.,,SupppM6]0 h.a -Drtlam\CO NO.1