Amendment to the Professional Services Agreement
PROJECT: (frame and address) AGREEMENT INFORMATION: AMENDMENT INFORMATION:
Five Sullivan Brothers Renovation of Date:January 26,2021 Amendment Number:001
the Second Floor Meeting Rooms& (original contract date)
Adjacent Lobby Space project No: 20-24695
Date:March 31,2021
OWNER:(name and address) ARCHITECT:(name and address)
City of Waterloo I&S Group, Inc.(ISG)
715 Mulberry Street 314 East 4th Street
Waterloo,IA 50703 Waterloo,1A 50703
The Owner and Architect amend the Agreement as follows:
Construction Cost Estimate=$560,000
To add an Alternate for additional HVAC work including an additional Chilter.
The Architect's compensation and schedule shall be adjusted as follows:
Compensation Adjustment:
Proposed Professional Design Tee to add Alternate for HVAC and Chiller work is: $46,000
Schedule Adjustment:
Work to coincide with the Phase 3 Improvements:Addition and Lobby Renovation of the Second Floor Meeting Rooms
&Adjacent Lobby Space.
SIGNATURES:
I&S Group,Inc.(ISG) City of Waterloo
ARCHITECT(Firm name) OWNER
II(Firm1 nalnte)
SIGNATURE SIGNATURE
Nathan Compton,Architect/Project
Manager Quentin Hart,Mayor
PRINTED NAME AND TITLE PRINTED NAME AND TITLE
March 31,2021 4/19/2021
DATE DATE
AIA Document G802"--2017.Copyright®2000,2007 and 2017 by The American Institute of Architects,All rights reserved.The"American Institute of
Architects,'"AIA:'the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was
produced by AIA software at 11:19:48 ET on 03/31/2021 under Order No.8114132283 which expires on 0 711 212 02 1,is not for resale,is licensed far one-time use
only,and may only be used in accordance with the AIA Contract Documents')Terms of Service.To report copyright violations,e-mail copyright@aia.org.
User Notes: (3139ADA43)