Cardinal Construction CO#8 5 Sullivan Bros Penthouse Chiller - 4.19.2021
�. Document G701 2017 Change Order PROJECT:fNane and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 5 Sulln an Brothers Convention Center Contract For:General Construction Change Order Number:008 Penthouse Chiller for the City of Project No. 19-23141 Waterloo,IA. Date:March 27,2020 Date:April 6,2021 OWNER:(Nance and address) ARCHITECT:(Name and address) CONTRACTOR:(Nance and address) City of Waterloo I&S Group,Inc.(ISG) Cardinal Construction,Inc. 715 Mulberry Street 314 East 4th Street 1246 Martin Road Waterloo,IA 50703 Waterloo,LA 50703 Waterloo,1A 50701 THE CONTRACT IS CHANGED AS FOLLOW& (Insert a detailed description of the change and,ifapplicable,attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives) A. CR 09: Cost to add approx.25'to the length of conduit and cabling required to hook up the two new chillers.......................................................................................Add S5,040.78 REDUCE SPECIFIED ROOF ASBESTOS ABATEMENT ALLOWANCE FROM 56,653.70'l'O$1,612.92 CONTRACT SUM REMAINS UNCHANGED. The original Contract Stun was $ 1,l 14,000.00 The net change by previously authorized Change Orders $ 26,865.08 The Contract Sum prior to this Change Order was $ 1,140,865.08 The Contract Sun will be unchanged by this Change Order in the amount of $ 0.00 The new Contract Sum including this Change Order will be $ 1,140,865.08 The Contract Time will be unchanged by Zero(0)days. Tile new date of Substantial Completion will be August 7,2020. NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and tune have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive, NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. I&S Group,Inc.(ISG) Cardinal Construction,Inc, City of Waterloo ARCHITECT(Firnt name) CO T CTOR(Firnt name) OWNER(Firm name) SIGNATURE SIGNATURE SIGNATURE Nathan Compton,Architect/Project Katy Susong,President Quentin Hart,Mayor Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE April 6,2021 _April, 6, 2021 4/19/2021 DATE DATE DATE AIA Document G701"—2017.Copyright©1979,1987,2000,2001 and 2017 by The American Institute of Architects.Ail rights reserved.The"American Institute of Architects, "AIA,"the AIA Logo,and"AIA Contract Documents'are registered trademarks and may not be used without permission.This document was produced by AIA software at 10:43:15 ET on 04/06!2021 under Order No.8114132283 which expires on 0711212021,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail copyright@aia.org. User Notes: (3139ADA3A)